Show Job Controls
Bid Cobra

SCURRY FM 1673 (2189-01-020)

Items: 61

County: SCURRY
Length: N/A
Highway: FM 1673
District: ABILENE
Control Number: 2189-01-020
DBE Goal: 650.0%
Project: BR 2024(664)
Guaranty: N/A
Time: 126 WORKING DAYS
Engineer's Estimate: $5,587,891.30
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
JOSE CABRERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$5,587,891.30
Over/Under Est: 31.51% $1,761,013.20
Subcontractor Percentage Amount
MORRIS COUNTY CONTRACTORS, L.L.C. 0.43% $31,604.59
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.26% $19,109.75
TRP CONSTRUCTION GROUP, LLC 0.15% $11,024.86
FC TRAFFIC CONTROL, INC. 0.08% $5,879.92
AWP SAFETY 0.08% $5,879.92
TORO BRAVO CONSTRUCTION, LLC 0.08% $5,879.92
S & S BRIDGE PAINTING, INC. 0.00% $0.00
Total: 1.08% $79,378.96

Bid Items & Bid Tabulations

61 Total 0 of 61
SCURRY  |  FM 1673  |  ABILENE  |  2189-01-020  |  01/04/2024  |  $5,587,891.30  |  BR 2024(664)  |  BRIDGE REPL  |  126 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 2.000 $2,500.000 $20,000.000
EXCAVATION (ROADWAY)
CY 437.000 $35.000 $50.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 573.000 $40.000 $50.000
BLOCK SODDING
SY 1,814.000 $10.000 $10.000
BROADCAST SEED (TEMP) (WARM)
SY 907.000 $2.000 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 907.000 $2.000 $2.000
VEGETATIVE WATERING
MG 3.500 $70.000 $1.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 270.000 $110.000 $150.000
PRIME COAT (MC-30)
GAL 233.000 $8.000 $30.000
ASPH (MULTI OPTION)
GAL 466.000 $15.000 $30.000
ASPH (AC-20-5TR)
GAL 419.000 $15.000 $30.000
AGGR(TY-B GR-3 SAC-B)
CY 11.000 $320.000 $1,000.000
AGGR(TY-PB GR-4 SAC-B)
CY 10.000 $340.000 $1,000.000
CEM STABIL BKFL
CY 111.000 $300.000 $250.000
DRILL SHAFT (36 IN)
LF 576.000 $350.000 $240.000
CL C CONC (ABUT)
CY 45.800 $2,200.000 $2,500.000
CL C CONC (CAP)
CY 70.800 $2,200.000 $2,500.000
CL C CONC (COLUMN)
CY 62.700 $2,200.000 $2,500.000
REINF CONC SLAB
SF 13,112.000 $30.000 $45.000
BRIDGE SIDEWALK
SF 2,314.000 $75.000 $70.000
APPROACH SLAB
CY 125.400 $900.000 $1,200.000
RETAINING WALL (MSE)
SF 3,430.000 $85.000 $140.000
EPOXY WATERPROOF FINISH
SF 310.000 $40.000 $10.000
RIPRAP (CONC)(4 IN)
CY 37.100 $4,000.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.900 $1,500.000 $700.000
ELASTOMERIC BEARING (E2)
EA 14.000 $4,000.000 $2,500.000
ELASTOMERIC BEARING (F2)
EA 7.000 $4,000.000 $3,000.000
STR STEEL (ROLLED BEAM)
LB 501,100.000 $3.750 $6.500
STR STEEL (MISC NON - BRIDGE)
LB 1,370.000 $30.000 $20.000
RAIL (TY C223)
LF 875.000 $220.000 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 86.000 $260.000 $200.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $600,000.000 $400,000.000
MOBILIZATION
LS 1.000 $506,950.300 $630,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $25,000.000 $44,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 610.000 $20.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 610.000 $5.000 $2.000
CONC CURB (MONO) (TY II)
LF 377.000 $14.000 $50.000
CONC CURB & GUTTER (TY II)
LF 65.000 $70.000 $80.000
DRIVEWAYS (SURF TREAT)
SY 604.000 $80.000 $50.000
CONC SIDEWALKS (6")
SY 35.000 $120.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $40.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $3,000.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,700.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 25.000 $5.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $4,000.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $400.000 $500.000
CRASH CUSH ATTEN (INSTL) (S) (TL3)
EA 1.000 $10,000.000 $20,000.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $300.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 1.000 $70.000 $2,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 7.000 $70.000 $3,500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 6.000 $2,600.000 $5,000.000
REMOVE SM RD SN SUP&AM
EA 8.000 $70.000 $120.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $70.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 1.000 $50.000 $50.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,246.000 $2.000 $6.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,452.000 $2.000 $6.000
REFL PAV MRKR TY II-A-A
EA 20.000 $12.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $22,000.000
TMA (STATIONARY)
DAY 27.000 $350.000 $300.000
TMA (MOBILE OPERATION)
DAY 2.000 $450.000 $300.000
Totals: $5,587,891.300 $7,348,904.500