Show Job Controls
Bid Cobra

SCURRY US 180 (0296-01-038)

Items: 76

County: SCURRY
Length: N/A
Highway: US 180
District: ABILENE
Control Number: 0296-01-038
DBE Goal: N/A
Project: F 2022(243)
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $7,954,818.89
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$7,954,818.89
1
$7,417,904.35
Over/Under Est: -6.75% -$536,914.54
$7,988,594.17
Over/Under Est: 0.42% $33,775.28
Amt Left: 7.69% $570,689.82
$9,999,999.88
Over/Under Est: 25.71% $2,045,180.99
Amt Left: 34.81% $2,582,095.53
Delta: -25.18% -$2,011,405.71

Bid Items & Bid Tabulations

76 Total 0 of 76
SCURRY  |  US 180  |  ABILENE  |  0296-01-038  |  01/07/2022  |  $7,954,818.89  |  F 2022(243)  |  PREVENT MAINT  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
A. L. HELMCAMP, INC.
GILVIN-TERRILL, LTD.
BACKFILL (TY A)
STA 433.000 $391.000 $385.770 $285.500 $500.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 97,345.000 $0.300 $0.110 $0.110 $0.100
DRILL SEED (TEMP)(WARM OR COOL)
SY 97,345.000 $0.200 $0.110 $0.110 $0.100
VEGETATIVE WATERING
MG 787.000 $50.000 $45.970 $20.250 $60.000
CEMENT
TON 1,071.000 $215.000 $201.820 $162.480 $181.000
CEMENT TREAT (EXIST MATL)(DC)(8")
SY 114,780.000 $3.100 $2.570 $3.840 $5.100
ASPH (RC-250)
GAL 22,956.000 $5.000 $5.690 $4.340 $5.500
AGGR(TY-B GR-5 SAC-B)
CY 1,044.000 $135.000 $161.970 $155.750 $225.000
PLANE ASPH CONC PAV (2")
SY 3,871.000 $5.000 $3.930 $8.800 $16.000
CL C CONC (HEADWALL)
CY 3.000 $5,000.000 $2,675.000 $2,700.000 $1,100.000
CL C CONC (RAIL FOUNDATION)
CY 5.000 $1,000.000 $2,835.500 $2,862.000 $1,100.000
RIPRAP (CONC)(4 IN)
CY 26.000 $700.000 $802.500 $810.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 43.000 $700.000 $802.500 $810.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 347.000 $700.000 $722.250 $729.000 $650.000
RAIL (TY T631)
LF 75.000 $105.000 $197.950 $79.380 $120.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 14.000 $580.000 $687.370 $693.790 $2,315.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 40.000 $750.000 $835.670 $843.480 $2,510.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 2.000 $1,500.000 $1,341.780 $1,354.320 $2,715.000
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
LF 4.000 $1,800.000 $1,996.190 $2,014.200 $3,015.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 2.000 $1,200.000 $1,035.760 $1,045.440 $2,710.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $6,500.000 $9,630.000 $9,720.000 $15,080.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $10,000.000 $12,412.000 $12,528.000 $17,519.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $11,000.000 $11,128.000 $11,232.000 $20,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $10,000.000 $7,169.000 $7,236.000 $20,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $15,000.000 $12,519.000 $12,636.000 $23,000.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 1.000 $30,000.000 $48,899.000 $49,356.000 $23,000.000
SET (TY I)(S= 9 FT)(HW= 10 FT)(3:1)(C)
EA 1.000 $40,000.000 $58,957.000 $59,508.000 $25,000.000
CLEAN EXIST CULVERTS
EA 2.000 $2,000.000 $7,042.840 $2,700.000 $12,000.000
REMOV STR (HEADWALL)
EA 2.000 $1,000.000 $1,605.000 $1,620.000 $5,000.000
MOBILIZATION
LS 1.000 $800,000.000 $409,985.560 $473,235.640 $990,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $14,133.330 $5,034.800 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 505.000 $50.000 $39.480 $37.800 $35.000
ROCK FILTER DAMS (REMOVE)
LF 505.000 $18.000 $7.560 $10.800 $10.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 390.000 $70.000 $36.140 $24.560 $25.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 390.000 $15.000 $24.910 $24.560 $25.000
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 390.000 $15.000 $13.920 $29.890 $15.000
INTERSECTIONS (ACP)
SY 158.000 $50.000 $113.700 $109.030 $100.000
RUMBLE STRIPS (SHOULDER)
LF 86,159.000 $0.150 $0.060 $0.110 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 43,506.000 $0.250 $0.060 $0.150 $0.280
MTL W-BEAM GD FEN (TIM POST)
LF 4,012.500 $20.000 $33.970 $28.620 $32.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 300.000 $25.000 $94.160 $70.200 $85.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,500.000 $1,391.000 $1,620.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 1,675.000 $3.000 $1.710 $2.160 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $2,700.000 $3,477.500 $3,294.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 22.000 $300.000 $219.350 $216.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,500.000 $1,236.650 $759.040 $2,500.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,650.000 $1,861.160 $759.040 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 2.000 $11,000.000 $10,144.150 $10,552.850 $8,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 63.000 $30.000 $8.400 $25.920 $35.000
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 214.000 $10.000 $3.750 $3.780 $3.500
WK ZN PAV MRK REMOV (REFL) TY II-A-A
LF 996.000 $10.000 $3.750 $3.780 $3.500
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 638.000 $5.000 $2.680 $2.700 $2.500
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 2,984.000 $5.000 $2.680 $2.700 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,308.000 $1.500 $3.770 $0.700 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 16,815.000 $2.000 $3.030 $0.700 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 353.000 $1.000 $1.090 $1.100 $1.020
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 785.000 $5.000 $8.560 $8.640 $8.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 1,460.000 $0.110 $0.160 $0.160 $0.150
REFL PAV MRK TY II (W) 4" (SLD)
LF 86,459.000 $0.120 $0.120 $0.120 $0.110
REFL PAV MRK TY II (Y) 4" (SLD)
LF 95,303.000 $0.120 $0.120 $0.120 $0.110
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,460.000 $0.500 $0.550 $0.550 $0.510
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 86,459.000 $0.500 $0.550 $0.550 $0.510
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,190.000 $0.500 $0.550 $0.550 $0.510
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 43,668.000 $0.500 $0.550 $0.550 $0.510
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 137.000 $10.000 $17.120 $17.280 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $300.000 $321.000 $324.000 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $350.000 $428.000 $432.000 $400.000
REFL PAV MRKR TY I-C
EA 71.000 $5.000 $4.280 $4.320 $4.000
REFL PAV MRKR TY II-A-A
EA 1,258.000 $5.000 $3.480 $3.510 $3.250
ELIM EXT PAV MRK & MRKS (4")
LF 15,435.000 $0.700 $0.910 $0.920 $0.850
SP MIXES SP-C SAC-B PG64-22
TON 27,639.000 $100.000 $90.830 $106.140 $112.000
SP MIXES SP-D SAC-A PG70-22
TON 17,293.000 $110.000 $110.000 $124.220 $141.000
TACK COAT
GAL 29,609.000 $5.000 $4.290 $3.250 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $9,825.500 $19,550.640 $15,000.000
TMA (STATIONARY)
DAY 134.000 $300.000 $345.070 $218.020 $300.000
TMA (MOBILE OPERATION)
DAY 54.000 $250.000 $398.140 $519.500 $1,000.000
Totals: $7,954,818.890 $7,417,904.355 $7,988,594.170 $9,999,999.880