Show Job Controls
Bid Cobra

SCURRY US 84 (0053-10-047)

Items: 33

County: SCURRY
Length: N/A
Highway: US 84
District: ABILENE
Control Number: 0053-10-047
DBE Goal: 0.0%
Project: C 53-10-47
Guaranty: N/A
Time: 63 WORKING DAYS
Engineer's Estimate: $9,703,226.96
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
MICHAEL WITTIE
MAXIE ALLEN
JOSE CABRERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$9,703,226.96
1
$9,325,296.75
Over/Under Est: -3.89% -$377,930.21
Over/Under Est: 7.47% $724,596.83
Amt Left: 11.82% $1,102,527.04
$11,728,588.16
Over/Under Est: 20.87% $2,025,361.20
Amt Left: 25.77% $2,403,291.41
Delta: -12.47% -$1,300,764.37
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 2.56% $238,727.60
TRP CONSTRUCTION GROUP, LLC 1.16% $108,173.44
HJC FARMS, INC. 0.97% $90,455.38
CONTRACTORS SERVICE, LTD. 0.38% $35,436.13
WEST TEXAS ROCK RESOURCES, LLC 0.32% $29,840.95
Total: 5.39% $502,633.50

Bid Items & Bid Tabulations

33 Total 0 of 33
SCURRY  |  US 84  |  ABILENE  |  0053-10-047  |  06/06/2024  |  $9,703,226.96  |  C 53-10-47  |  RESURF ROADWAY  |  63 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
NOBLES ROAD CONSTRUCTION, INC.
GILVIN-TERRILL, LTD.
BACKFILL (TY B)
STA 755.000 $150.000 $171.120 $330.000 $300.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 20,004.000 $50.000 $49.480 $53.000 $75.000
PLANE ASPH CONC PAV (2")
SY 316,730.000 $2.500 $2.260 $1.850 $3.900
MOBILIZATION
LS 1.000 $841,260.000 $435,687.700 $1,019,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $20,000.000 $24,600.000 $22,000.000 $100,000.000
RUMBLE STRIPS (SHOULDER)
LF 150,030.000 $0.200 $0.220 $0.220 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 2,225.000 $30.000 $27.500 $36.300 $25.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,400.000 $1,595.000 $1,320.000 $1,450.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 33.000 $85.000 $93.500 $88.000 $85.000
REMOVE METAL BEAM GUARD FENCE
LF 2,250.000 $2.500 $1.100 $2.200 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $110.000 $330.000 $100.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $110.000 $330.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $6,365.730 $3,080.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 90.000 $30.000 $60.500 $33.000 $55.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,630.000 $1.000 $3.770 $11.000 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 103.000 $1.620 $1.100 $1.380 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 479.000 $1.500 $1.100 $1.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,516.000 $1.250 $1.100 $1.500 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 79.000 $3.000 $11.000 $1.500 $10.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 44.000 $9.500 $11.000 $35.000 $10.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 14,715.000 $0.850 $0.750 $0.710 $0.680
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 58,263.000 $0.850 $0.730 $0.800 $0.660
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 58,118.000 $0.850 $0.730 $0.800 $0.660
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $250.000 $275.000 $465.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $350.000 $385.000 $650.000 $350.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 184.000 $65.000 $60.500 $27.500 $55.000
REFL PAV MRKR TY II-C-R
EA 938.000 $4.000 $4.400 $4.950 $4.000
D-GR HMA TY-D SAC-B PG70-22
TON 9,234.000 $160.000 $160.440 $177.000 $190.000
TACK COAT
GAL 8,336.000 $5.500 $5.510 $6.350 $6.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 24,625.000 $200.000 $203.010 $212.500 $205.000
TACK COAT
GAL 23,338.000 $5.500 $5.220 $5.800 $6.000
TMA (STATIONARY)
DAY 70.000 $300.000 $220.000 $302.000 $475.000
TMA (MOBILE OPERATION)
DAY 15.000 $600.000 $914.920 $1,100.000 $950.000
Totals: $9,703,226.960 $9,325,296.750 $10,427,823.790 $11,728,588.160