SAN SABA FM 45 (0480-08-027)

Items: 90

County: SAN SABA
Length: N/A
Highway: FM 45
District: BROWNWOOD
Control Number: 0480-08-027
DBE Goal: N/A
Project: BR 2020(346)
Guaranty: N/A
Time: 306 WORKING DAYS
Engineer's Estimate: $5,696,061.45
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: RECONSTRUCT BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$5,696,061.45
$5,068,391.24
Over/Under Est: -11.02% -$627,670.21
Over/Under Est: -6.54% -$372,527.85
Amt Left: 5.03% $255,142.36
$7,464,706.00
Over/Under Est: 31.05% $1,768,644.55
Amt Left: 47.28% $2,396,314.76
Delta: -40.22% -$2,141,172.40

Bid Items & Bid Tabulations

90 Total 0 of 90
SAN SABA  |  FM 45  |  BROWNWOOD  |  0480-08-027  |  12/03/2019  |  $5,696,061.45  |  BR 2020(346)  |  RECON BRIDGE AND APPROACHES  |  306 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
EARTH BUILDERS, L.P.
PREPARING ROW
AC 18.500 $6,162.160 $27,000.000 $8,500.000 $20,000.000
EXCAVATION (ROADWAY)
CY 42,878.000 $8.000 $8.000 $11.000 $12.000
EXCAVATION (SPECIAL)
CY 15,500.000 $13.000 $19.550 $15.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 29,793.000 $11.000 $5.000 $6.000 $10.000
FURNISHING AND PLACING TOPSOIL
CY 10,000.000 $6.500 $2.450 $5.000 $5.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
AC 12.720 $1,000.000 $582.500 $600.000 $600.000
BROADCAST SEED (TEMP) (WARM)
AC 6.310 $1,000.000 $562.500 $600.000 $600.000
BROADCAST SEED (TEMP) (COOL)
AC 6.310 $1,000.000 $562.450 $600.000 $600.000
VEGETATIVE WATERING
MG 2,764.000 $10.000 $32.860 $14.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 3,460.000 $2.000 $1.790 $1.800 $3.500
PROOF ROLLING
HR 4.000 $100.000 $279.460 $65.000 $200.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 7,148.400 $50.000 $38.530 $45.000 $95.000
ASPH (AC-20-5TR)
GAL 14,752.000 $5.000 $6.870 $4.300 $7.000
ASPH (RC-250)
GAL 4,897.000 $5.000 $8.170 $5.300 $8.000
AGGR(TY-B GR-5 SAC-B)
CY 150.800 $100.000 $414.420 $174.000 $500.000
AGGR(TY-PB GR-3 SAC-B)
CY 218.400 $110.000 $319.690 $200.000 $500.000
AGGR(TY-PB GR-4 SAC-B)
CY 160.500 $100.000 $189.450 $200.000 $300.000
HMCL ACP TY-B SAC-B AC-1.5
TON 15.000 $250.000 $142.090 $260.000 $160.000
D-GR HMA(SQ) TY-B PG64-22
TON 1,255.000 $115.000 $116.630 $95.000 $130.000
TACK COAT
GAL 278.000 $5.000 $3.790 $2.700 $5.000
CEM STABIL BKFL
CY 176.000 $150.000 $191.120 $200.000 $350.000
DRILL SHAFT (18 IN)
LF 118.000 $100.000 $108.680 $220.000 $90.000
DRILL SHAFT (36 IN)
LF 350.000 $225.000 $200.130 $390.000 $350.000
DRILL SHAFT (48 IN)
LF 736.000 $400.000 $284.940 $410.000 $480.000
CL C CONC (ABUT)
CY 73.000 $1,100.000 $919.970 $700.000 $1,200.000
CL C CONC (CAP)
CY 79.600 $1,300.000 $641.860 $1,000.000 $1,200.000
CL C CONC (COLUMN)
CY 142.400 $1,150.000 $582.090 $950.000 $1,000.000
CL C CONC (CULV)
CY 51.800 $1,500.000 $1,090.900 $1,500.000 $1,000.000
REINF CONC SLAB
SF 27,600.000 $20.000 $16.000 $17.000 $27.000
APPROACH SLAB
CY 70.600 $500.000 $493.280 $590.000 $850.000
PRESTR CONC GIRDER (TX54)
LF 3,585.000 $200.000 $135.100 $160.000 $190.000
RIPRAP (CONC)(5 IN)
CY 29.400 $650.000 $448.720 $550.000 $650.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 460.000 $150.000 $127.030 $155.000 $175.000
RAIL (TY T223)
LF 1,272.000 $110.000 $75.780 $98.000 $130.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 138.000 $80.000 $59.150 $120.000 $120.000
GABION MATTRESSES (GALV)(12 IN)
SY 3,094.000 $120.000 $58.470 $100.000 $100.000
GABIONS (3' X 3')(GALV)
CY 282.000 $240.000 $382.650 $240.000 $320.000
GABION (1.5' X 3')(GALV)
CY 99.800 $240.000 $593.130 $245.000 $320.000
CMP AR (GAL STL DES 2)
LF 80.000 $60.000 $60.390 $70.000 $75.000
CMP AR (GAL STL DES 3)
LF 194.000 $75.000 $58.320 $75.000 $85.000
WINGWALL (FW - S) (HW=3 FT)
EA 1.000 $6,000.000 $8,095.960 $8,000.000 $6,500.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 2.000 $8,000.000 $9,402.960 $18,000.000 $12,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $10,000.000 $12,210.420 $30,000.000 $18,000.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 8.000 $2,500.000 $549.750 $1,600.000 $2,000.000
SET (TY II) (DES 3) (CMP) (3: 1) (C)
EA 1.000 $2,500.000 $1,013.520 $1,600.000 $2,000.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 1.000 $2,500.000 $1,086.610 $1,600.000 $2,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 7.000 $2,500.000 $372.960 $1,600.000 $2,000.000
REMOV STR (BOX CULVERT)
EA 2.000 $10,000.000 $1,312.640 $2,000.000 $35,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $28,969.230 $50,000.000 $130,000.000
REMOV STR (PIPE)
EA 2.000 $750.000 $850.150 $900.000 $5,000.000
MOBILIZATION
LS 1.000 $532,981.490 $500,000.000 $489,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $6,000.000 $1,184.740 $4,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 457.000 $30.000 $44.370 $45.000 $45.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 25.000 $40.000 $123.070 $125.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 482.000 $8.000 $18.660 $18.000 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,130.000 $4.500 $2.690 $2.800 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,130.000 $1.000 $0.880 $0.900 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 210.000 $8.000 $8.870 $9.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 210.000 $1.500 $7.140 $7.200 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $6,000.000 $9,719.580 $6,000.000 $12,000.000
DRIVEWAYS (SURF TREAT)
SY 869.000 $27.000 $12.980 $36.000 $65.000
TURNOUTS (SURF TREAT)
SY 94.000 $27.000 $12.970 $36.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,125.000 $27.000 $22.500 $23.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,600.000 $2,100.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $4,000.000 $2,480.000 $2,500.000 $3,200.000
WIRE FENCE (TY C)
LF 310.000 $15.000 $13.950 $14.000 $15.000
WIRE FENCE (WATER GAP)
LF 40.000 $40.000 $99.000 $100.000 $50.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $500.000 $225.000 $180.000 $350.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $500.000 $500.000 $500.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $500.000 $525.000 $500.000 $650.000
REMOVE SM RD SN SUP&AM
EA 6.000 $150.000 $100.000 $100.000 $150.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $75.000 $90.000 $40.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 23.000 $75.000 $30.000 $40.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 3.000 $100.000 $105.000 $40.000 $80.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 15,490.000 $0.500 $0.500 $0.520 $1.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 15,490.000 $0.500 $0.500 $0.520 $1.200
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 96.000 $4.000 $20.000 $21.000 $14.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,200.000 $0.750 $3.000 $1.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,200.000 $0.750 $3.000 $1.000 $2.000
PAVEMENT SEALER 4"
LF 2,400.000 $0.200 $0.500 $0.520 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,000.000 $0.750 $0.630 $0.650 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,000.000 $0.750 $0.630 $0.650 $0.700
TRAFFIC BUTTON TY II-A-A
EA 300.000 $7.000 $8.000 $8.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 4,335.000 $0.500 $0.670 $0.700 $0.400
PAV SURF PREP FOR MRK (4")
LF 2,400.000 $0.200 $0.500 $0.520 $0.500
TIP TESTING(DRILL SHAFT)
EA 4.000 $5,000.000 $5,000.000 $2,500.000 $4,500.000
DEWATERING BAGS
EA 2.000 $1,000.000 $200.000 $500.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $150.000 $100.000 $130.000 $150.000
TMA (STATIONARY)
DAY 173.000 $144.500 $80.610 $150.000 $200.000
TMA (MOBILE OPERATION)
DAY 8.000 $1,000.000 $377.950 $250.000 $450.000
Totals: $5,696,061.450 $5,068,391.306 $5,323,533.600 $7,464,706.000