Show Job Controls
Bid Cobra

SAN PATRICIO FM 2986 (3026-01-026)

Items: 148

County: SAN PATRICIO
Length: N/A
Highway: FM 2986
District: CORPUS CHRISTI
Control Number: 3026-01-026
DBE Goal: N/A
Project: STP 2018(633)
Guaranty: N/A
Time: 476 WORKING DAYS
Engineer's Estimate: $19,105,023.98
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: UPGRADE TO 5-LANE URBAN ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$19,105,023.98
1
Awarded
$17,126,620.08
Over/Under Est: -10.36% -$1,978,403.90
Over/Under Est: -9.34% -$1,784,399.19
Amt Left: 1.13% $194,004.71
$19,723,315.85
Over/Under Est: 3.24% $618,291.87
Amt Left: 15.16% $2,596,695.77
Delta: -13.87% -$2,402,691.06
Over/Under Est: 15.14% $2,893,245.94
Amt Left: 28.44% $4,871,649.84
Delta: -11.53% -$2,274,954.07

Bid Items & Bid Tabulations

148 Total 0 of 148
SAN PATRICIO  |  FM 2986  |  CORPUS CHRISTI  |  3026-01-026  |  07/11/2018  |  $19,105,023.98  |  STP 2018(633)  |  UPGRADE TO 5-LANE URBAN ROADWAY  |  476 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
HAAS-ANDERSON CONSTRUCTION, LTD.
J. CARROLL WEAVER, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 110.000 $1,100.000 $370.000 $228.000 $795.960 $550.510
REMOVING CONC (DRIVEWAYS)
SY 1,828.000 $23.000 $8.300 $7.850 $26.740 $21.150
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 52,412.000 $6.000 $2.700 $5.400 $3.570 $4.000
EXCAVATION (ROADWAY)
CY 39,685.000 $7.000 $5.700 $2.000 $12.940 $9.800
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 16,824.000 $18.000 $3.200 $7.200 $5.910 $6.220
BLOCK SODDING
SY 4,889.000 $5.000 $5.400 $4.200 $4.050 $6.370
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 26,455.000 $1.000 $1.000 $0.300 $0.310 $0.690
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 2.740 $1,040.000 $2,000.000 $1,090.000 $1,080.000 $1,964.220
DRILL SEEDING (TEMP) (WARM)
AC 2.740 $687.000 $1,500.000 $1,090.000 $540.000 $1,598.800
FERTILIZER
AC 5.460 $615.000 $160.000 $224.000 $216.000 $1,136.260
VEGETATIVE WATERING
MG 656.000 $27.000 $25.000 $33.000 $19.440 $42.070
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 22,682.000 $50.000 $53.000 $55.000 $51.200 $60.030
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 40.000 $25.000 $53.000 $35.000 $59.400 $772.170
LIME (HYDRATED LIME (SLURRY))
TON 1,525.000 $130.000 $190.000 $193.000 $186.760 $198.150
LIME TRT (SUBGRADE)(8")
SY 84,292.000 $2.500 $2.000 $3.500 $3.350 $2.290
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
SY 1,889.000 $22.500 $17.500 $22.000 $25.250 $36.250
PRIME COAT (MC-30)
GAL 16,109.000 $4.000 $3.700 $3.850 $3.660 $5.000
ASPH (MULTI OPTION)
GAL 40,122.000 $3.000 $2.500 $2.550 $2.360 $3.940
AGGR (MULTI OPTION)
CY 1,039.000 $107.000 $110.000 $115.000 $129.570 $129.950
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 282.000 $150.000 $130.000 $137.000 $108.680 $134.400
D-GR HMA TY-D SAC-B PG64-22
TON 165.000 $200.000 $160.000 $154.000 $106.500 $157.520
D-GR HMA TY-D SAC-B PG70-22
TON 12,315.000 $62.000 $81.000 $87.000 $106.210 $111.280
D-GR HMA TY B SAC-B PG (64-22)
TON 22,901.000 $57.000 $76.000 $76.000 $93.260 $102.800
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 226.000 $80.000 $160.000 $73.000 $56.880 $96.150
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 8,602.000 $11.000 $25.000 $15.000 $17.980 $17.630
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 2,902.000 $20.000 $50.000 $31.000 $38.750 $42.180
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 34,106.000 $2.000 $1.800 $1.700 $2.150 $2.720
CONC PVMT (CONT REINF - CRCP) (20")
SY 1,889.000 $450.000 $230.000 $189.000 $160.260 $103.630
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 235.000 $300.000 $240.000 $166.000 $160.260 $123.340
CEM STABIL BKFL
CY 7,927.000 $96.000 $77.000 $84.000 $65.880 $80.610
CEMENT STAB BACKFILL (INLET OR MH)
CY 836.000 $42.000 $74.000 $84.000 $65.880 $99.790
TRENCH EXCAVATION PROTECTION
LF 15,940.000 $10.000 $2.200 $5.600 $1.080 $2.260
DRILL SHAFT (SIGN MTS) (24 IN)
LF 30.000 $250.000 $230.000 $224.000 $216.000 $314.130
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 490.000 $190.000 $250.000 $246.000 $237.600 $309.960
CL C CONC (RETAINING WALL)
CY 1,227.000 $1,000.000 $660.000 $633.000 $799.200 $922.110
RIPRAP (CONC)(5 IN)
CY 298.000 $500.000 $490.000 $596.000 $429.840 $458.520
RIPRAP (CONC)(CL B)
CY 17.150 $384.000 $550.000 $993.000 $437.400 $459.250
RAIL (TY PR1)
LF 7,571.000 $83.000 $66.000 $66.000 $78.780 $92.810
CONC BOX CULV (5 FT X 2 FT)
LF 2,778.000 $250.000 $200.000 $295.000 $271.080 $283.820
CONC BOX CULV (6 FT X 4 FT)
LF 305.000 $320.000 $270.000 $302.000 $354.240 $390.290
CONC BOX CULV (7 FT X 3 FT)
LF 6,874.000 $300.000 $310.000 $302.000 $393.120 $408.430
CONC BOX CULV (8 FT X 4 FT)
LF 97.000 $530.000 $370.000 $392.000 $528.120 $545.540
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 26.000 $320.000 $1,000.000 $700.000 $589.680 $678.180
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 13.000 $530.000 $1,200.000 $725.000 $951.480 $1,043.870
RC PIPE (CL III)(18 IN)
LF 645.000 $55.000 $130.000 $75.000 $69.120 $54.320
RC PIPE (CL III)(24 IN)
LF 4,197.000 $70.000 $70.000 $20.000 $73.440 $71.200
RC PIPE (CL III)(30 IN)
LF 100.000 $80.000 $160.000 $120.000 $151.200 $86.330
MANH (COMPL)(PRM)(48IN)
EA 20.000 $2,600.000 $2,300.000 $3,020.000 $2,918.160 $3,210.200
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 1.000 $4,300.000 $5,400.000 $6,110.000 $4,666.680 $7,780.300
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 5.000 $5,000.000 $9,400.000 $9,170.000 $9,213.480 $9,958.900
INLET (COMPL)(PCU)(3FT)(NONE)
EA 6.000 $4,400.000 $3,300.000 $4,670.000 $2,787.480 $4,210.400
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 28.000 $4,560.000 $3,700.000 $5,100.000 $3,222.720 $4,668.900
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 10.000 $4,250.000 $4,000.000 $5,400.000 $3,535.920 $4,997.900
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 36.000 $2,800.000 $1,900.000 $4,260.000 $2,316.600 $3,762.150
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $5,000.000 $13,000.000 $8,100.000 $5,616.000 $6,512.750
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $5,000.000 $15,300.000 $8,570.000 $5,616.000 $6,675.250
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $19,000.000 $27,200.000 $21,000.000 $20,412.000 $14,863.930
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $25,000.000 $18,300.000 $25,400.000 $20,412.000 $14,644.620
SET (TY I) (24 IN) (3: 1) (C)
EA 1.000 $100.000 $1,100.000 $2,240.000 $2,160.000 $1,140.950
REMOV & RE - LAY PIPE (24 IN)
LF 190.000 $100.000 $74.000 $50.000 $105.840 $72.790
JACK BOR OR TUN PIPE(14 IN)(STL CASING)
LF 270.000 $250.000 $420.000 $391.000 $378.000 $830.540
REMOV STR (SET)
EA 22.000 $400.000 $210.000 $463.000 $313.200 $536.730
REMOV STR (WINGWALL)
EA 4.000 $1,000.000 $1,300.000 $1,910.000 $918.000 $1,699.600
REMOV STR (HEADWALL)
EA 12.000 $1,000.000 $1,000.000 $2,550.000 $1,555.200 $1,788.060
REMOV STR (PIPE)
LF 1,704.000 $20.000 $21.000 $15.000 $16.200 $12.590
REMOV STR (BOX CULVERT)
LF 224.000 $55.000 $37.000 $80.000 $58.320 $70.290
MOBILIZATION
LS 1.000 $1,100,000.000 $1,244,000.000 $1,382,000.000 $1,065,000.000 $2,179,579.180
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $7,000.000 $4,100.000 $1,860.000 $2,700.000 $1,510.620
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 320.000 $20.000 $30.000 $70.000 $70.200 $39.340
ROCK FILTER DAMS (REMOVE)
LF 320.000 $10.000 $17.500 $19.000 $19.440 $9.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,381.000 $3.000 $2.400 $3.100 $2.970 $3.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,381.000 $1.000 $0.900 $0.500 $0.490 $0.340
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 400.000 $7.000 $5.500 $5.050 $4.860 $7.190
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.500 $0.950 $0.500 $0.490 $1.670
CONSTRUCTING DETOURS
SY 12,338.000 $50.000 $25.000 $29.000 $34.250 $76.960
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 5,110.000 $40.000 $31.000 $14.000 $52.370 $46.690
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 26,670.000 $13.000 $3.800 $6.850 $18.510 $5.700
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 5,110.000 $10.000 $9.200 $7.750 $26.910 $15.920
CONC CURB & GUTTER (TY II)
LF 19,543.000 $26.000 $15.000 $17.000 $19.440 $18.160
DRIVEWAYS (CONC)
SY 1,251.000 $80.000 $88.000 $78.000 $73.440 $74.690
CONC SIDEWALKS (6")
SY 12,106.000 $50.000 $55.000 $55.000 $78.800 $52.040
CURB RAMPS (TY 7)
EA 2.000 $1,714.000 $3,000.000 $1,940.000 $1,674.000 $2,577.560
CRASH CUSH ATTEN (INSTL)
EA 18.000 $19,000.000 $9,600.000 $8,390.000 $8,305.030 $9,388.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 100.000 $2,500.000 $1,300.000 $559.000 $1,768.450 $1,349.110
CRASH CUSH ATTEN (REMOVE)
EA 18.000 $1,000.000 $1,100.000 $839.000 $1,768.440 $1,114.340
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 49.000 $3,600.000 $3,300.000 $3,240.000 $3,132.000 $3,201.630
CONDT (PVC) (SCH 40) (2")
LF 8,803.000 $10.000 $9.850 $9.800 $9.450 $9.680
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,278.000 $27.000 $45.000 $45.000 $43.200 $44.360
ELEC CONDR (NO.8) BARE
LF 10,081.000 $2.000 $1.400 $1.400 $1.350 $1.430
ELEC CONDR (NO.8) INSULATED
LF 20,282.000 $2.000 $1.350 $1.350 $1.300 $1.380
GROUND BOX TY A (122311)W/APRON
EA 27.000 $990.000 $940.000 $928.000 $896.400 $925.670
ELC SRV TY A 240/480 100(SS)SS(E)GC(O)
EA 1.000 $5,000.000 $8,500.000 $8,390.000 $8,100.000 $8,278.500
ALUMINUM SIGNS (TY G)
SF 76.500 $25.000 $38.000 $38.000 $36.720 $28.420
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 49.000 $465.000 $510.000 $593.000 $567.000 $622.130
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $665.000 $680.000 $626.000 $891.000 $641.250
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $505.000 $730.000 $693.000 $837.000 $719.170
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $350.000 $560.000 $419.000 $432.000 $542.250
REMOVE SM RD SN SUP&AM
EA 51.000 $60.000 $56.000 $50.000 $75.600 $383.600
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,267.000 $0.200 $0.430 $0.400 $0.410 $0.470
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 29,142.000 $0.200 $0.430 $0.400 $0.410 $0.430
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 336.000 $0.500 $0.850 $0.850 $0.810 $0.910
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,924.000 $0.200 $0.430 $0.400 $0.410 $0.430
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 38,495.000 $0.200 $0.430 $0.400 $0.410 $0.420
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 133.000 $4.000 $4.000 $3.900 $3.780 $4.060
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 285.000 $3.200 $4.000 $3.900 $3.780 $3.950
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 4,329.000 $0.800 $0.500 $0.500 $0.490 $0.520
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 60,385.000 $0.600 $0.500 $0.500 $0.490 $0.510
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,005.000 $1.400 $1.000 $1.000 $0.970 $1.000
WK ZN PAV MRK REMOV (W)(RR XING)
EA 8.000 $500.000 $1,100.000 $1,060.000 $1,026.000 $1,048.560
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 70,843.000 $0.600 $0.500 $0.500 $0.490 $0.510
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 717.000 $1.100 $1.150 $1.100 $0.360 $1.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,246.000 $1.250 $1.150 $1.100 $0.360 $1.030
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,256.000 $0.500 $0.750 $0.750 $0.700 $0.730
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 820.000 $2.700 $1.050 $1.050 $1.030 $1.600
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 1,570.000 $3.500 $2.200 $2.100 $2.050 $2.450
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 7,172.000 $0.200 $0.390 $0.400 $0.380 $0.420
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 300.000 $0.200 $0.390 $0.400 $0.380 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 6,354.000 $0.200 $0.390 $0.400 $0.380 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 33,875.000 $0.200 $0.360 $0.350 $0.350 $0.370
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 931.000 $6.000 $7.900 $7.850 $7.560 $8.190
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 319.000 $12.000 $15.750 $16.000 $15.120 $16.110
PREFAB PAV MRK TY C (W) (ARROW)
EA 23.000 $192.000 $200.000 $196.000 $189.000 $217.890
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $258.000 $280.000 $280.000 $270.000 $300.340
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $541.000 $620.000 $615.000 $594.000 $612.130
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 153.000 $13.000 $16.000 $16.000 $15.390 $16.420
REFL PAV MRKR TY I-C
EA 452.000 $3.000 $4.000 $3.900 $3.780 $4.350
REFL PAV MRKR TY II-A-A
EA 1,059.000 $3.000 $4.000 $3.900 $3.780 $4.070
ELIM EXT PAV MRK & MRKS (4")
LF 16,635.000 $1.300 $1.150 $1.350 $0.810 $1.170
ELIM EXT PAV MRK & MRKS (8")
LF 430.000 $0.800 $3.700 $1.350 $0.810 $2.730
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $45.000 $400.000 $69.000 $48.600 $179.250
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $50.000 $400.000 $137.000 $48.600 $179.250
ELIM EXT PAV MRK & MRKS (RR XING)
EA 2.000 $50.000 $400.000 $137.000 $48.600 $124.250
GEOGRID BASE REINFORCEMENT (TY II)
SY 80,514.000 $2.000 $1.400 $1.600 $0.980 $1.810
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $20,700.000 $3,300.000 $10,260.000 $41,587.130
TMA (STATIONARY)
EA 4.000 $1,000.000 $15,000.000 $100.000 $12,960.000 $19,807.130
REC RAPID FLASH BEACON(1-WAY HARDWIRED)
EA 6.000 $9,000.000 $7,400.000 $7,380.000 $7,128.000 $7,264.750
DUCTILE IRON FITTING-8" X 8" TEE
EA 3.000 $500.000 $540.000 $537.000 $518.400 $729.290
DUCTILE IRON FITTING-8" 45 DEGREE BEND
EA 28.000 $400.000 $620.000 $615.000 $594.000 $363.730
DUCTILE IRON FITTING-8" 22.5 DEGR BEND
EA 6.000 $350.000 $490.000 $481.000 $464.400 $399.040
DUCTILE IRON FITTING-8" CAP
EA 4.000 $450.000 $510.000 $503.000 $486.000 $238.060
CLEARING & GRUBBING
LS 1.000 $2,500.000 $32,300.000 $32,100.000 $28,810.080 $5,493.550
TIE-INTO EXISTING 8" WATER LINE
EA 3.000 $2,000.000 $2,800.000 $2,780.000 $2,682.720 $3,427.650
1" SERVICE CONNECTION
EA 5.000 $1,500.000 $940.000 $929.000 $897.480 $1,698.810
8" TAPPING SLEEVE & VALVE
EA 1.000 $4,550.000 $4,900.000 $4,840.000 $4,673.160 $23,482.460
8" C900 PVC WATERLINE (WATER MAIN)
LF 4,403.000 $90.000 $35.000 $31.000 $33.480 $29.580
FIRE HYDRANT ASSEMBLY
EA 9.000 $6,200.000 $5,600.000 $5,580.000 $5,384.880 $6,190.680
8" GATE VALVE & BOX
EA 13.000 $1,500.000 $1,500.000 $1,470.000 $1,416.960 $1,870.530
8" DUCTILE IRON PIPE
LF 423.000 $135.000 $65.000 $65.000 $62.640 $78.120
Totals: $19,105,023.980 $17,126,620.080 $17,320,624.790 $19,723,315.850 $21,998,269.942