Show Job Controls
Bid Cobra

SAN PATRICIO SH 234 (0507-01-021)

Items: 117

County: SAN PATRICIO
Length: N/A
Highway: SH 234
District: CORPUS CHRISTI
Control Number: 0507-01-021
DBE Goal: 750.0%
Project: STP 2024(813)HES
Guaranty: N/A
Time: 175 WORKING DAYS
Engineer's Estimate: $5,822,812.05
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: TRAFFIC SIGNAL IMPROVEMENTS
Mail/Deliver Bids To: N/A
ROBERT ISASSI
CHANDLER WILLIAMS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,822,812.05
$5,492,231.22
Over/Under Est: -5.68% -$330,580.83
Over/Under Est: -0.52% -$30,468.70
Amt Left: 5.46% $300,112.13
$5,793,862.70
Over/Under Est: -0.5% -$28,949.35
Amt Left: 5.49% $301,631.48
Delta: -0.03% -$1,519.35
Over/Under Est: 0.42% $24,457.05
Amt Left: 6.46% $355,037.88
Delta: -0.92% -$53,406.40
Subcontractor Percentage Amount
AVILA AND SON'S L.L.C. 6.40% $384,188.25
BROOKE PAVING AND CONSTRUCTION LLC 5.18% $310,952.36
HIGHWAY BARRICADES AND SERVICES, LLC 2.01% $120,659.12
DEPENDABLE FENCE 0.93% $55,827.35
PERFORMANCE EQUIPMENT SERVICE 0.46% $27,613.53
TAYLOR BRIDGE LLC 0.33% $19,809.71
Total: 15.31% $919,050.32

Bid Items & Bid Tabulations

117 Total 0 of 117
SAN PATRICIO  |  SH 234  |  CORPUS CHRISTI  |  0507-01-021  |  03/05/2024  |  $5,822,812.05  |  STP 2024(813)HES  |  TRAF SIGNAL IMPRVS  |  175 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. CARROLL WEAVER, INC.
LCR TOTAL TRANSPORT LLC
CK NEWBERRY, LLC
J E CONSTRUCTION SERVICES, LLC
PREPARING ROW
STA 39.000 $3,000.000 $224.000 $1,460.000 $500.000 $564.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 132.000 $8.000 $35.110 $32.000 $15.000 $23.000
EXCAVATION (ROADWAY)
CY 3,399.000 $32.000 $12.920 $17.000 $22.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,092.000 $40.000 $9.210 $26.000 $25.000 $14.000
BACKFILL (TY A OR B)
STA 245.000 $300.000 $114.060 $323.000 $200.000 $98.000
FURNISHING AND PLACING TOPSOIL (4")
SY 15,566.000 $3.000 $6.870 $1.800 $2.000 $2.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 15,566.000 $1.000 $0.390 $0.250 $0.400 $1.000
VEGETATIVE WATERING
MG 283.500 $30.000 $24.640 $57.000 $35.000 $22.000
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 1,184.000 $4.000 $2.520 $1.600 $2.500 $3.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 1,381.000 $110.000 $111.960 $142.000 $140.000 $160.000
LIME TRT (EXST MATL) (6")
SY 10,392.000 $6.000 $7.010 $5.800 $5.500 $5.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 189.000 $300.000 $332.420 $416.000 $375.000 $358.000
PRIME COAT (MC-30)
GAL 2,136.000 $6.000 $5.650 $8.300 $6.000 $6.000
ASPH (AC-10)
GAL 4,167.000 $5.000 $3.470 $4.900 $3.750 $4.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 869.000 $120.000 $185.820 $180.000 $150.000 $160.000
ASPH (AC-15P OR AC-20-5TR)
GAL 33,041.000 $5.000 $3.870 $4.400 $3.750 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 3,540.000 $120.000 $84.590 $120.000 $100.000 $95.000
PLANE ASPH CONC PAV(0" TO 2")
SY 332.000 $12.000 $34.540 $3.600 $20.000 $21.000
CEM STABIL BKFL
CY 1,061.300 $130.000 $141.480 $155.000 $135.000 $67.000
CUT & RESTORE CONC PAVING
SY 25.000 $330.000 $196.000 $468.000 $250.000 $183.000
CUT & RESTORE ASPH PAVING
SY 129.000 $165.000 $72.800 $64.000 $150.000 $153.000
CUT AND RESTORE PAV (FLEX BASE)
SY 105.000 $85.000 $39.200 $41.000 $125.000 $32.000
TEMPORARY SPL SHORING
SF 367.000 $40.000 $25.200 $68.000 $15.000 $46.000
CL C CONC (RAIL FOUNDATION)
CY 4.200 $800.000 $1,108.800 $2,450.000 $2,500.000 $1,650.000
RETAINING WALL (SPREAD FOOTING)
SF 428.000 $100.000 $88.480 $106.000 $135.000 $133.000
RIPRAP (CONC)(5 IN)
CY 12.000 $510.000 $588.000 $590.000 $650.000 $660.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.800 $610.000 $629.440 $655.000 $725.000 $717.000
STR STEEL (MISC NON - BRIDGE)
LB 56.000 $20.000 $16.240 $50.000 $60.000 $23.000
RAIL (TY SSTR)
LF 30.000 $200.000 $219.520 $485.000 $500.000 $610.000
CONC BOX CULV (3 FT X 3 FT)
LF 1,026.400 $450.000 $459.430 $348.000 $375.000 $460.000
CONC BOX CULV (7 FT X 3 FT)
LF 200.000 $900.000 $861.030 $685.000 $800.000 $975.000
RC PIPE (CL III)(18 IN)
LF 453.300 $110.000 $104.260 $81.000 $110.000 $134.000
RC PIPE (CL III)(24 IN)
LF 1,272.000 $130.000 $127.570 $94.000 $120.000 $165.000
RC PIPE (CL III)(27 IN)
LF 50.200 $180.000 $178.800 $114.000 $160.000 $250.000
RC PIPE (CL III)(30 IN)
LF 111.000 $160.000 $159.980 $114.000 $160.000 $260.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $6,700.000 $5,857.600 $7,240.000 $9,000.000 $9,000.000
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $8,200.000 $7,745.920 $8,370.000 $11,000.000 $11,500.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 3.000 $9,000.000 $8,475.040 $7,790.000 $11,500.000 $12,000.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $11,000.000 $8,367.520 $10,020.000 $12,000.000 $11,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $7,000.000 $6,375.040 $7,450.000 $10,000.000 $9,000.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 5.000 $7,000.000 $2,240.000 $3,000.000 $12,000.000 $2,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $10,000.000 $9,190.720 $10,560.000 $10,000.000 $15,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(P)
EA 1.000 $10,000.000 $9,312.800 $10,550.000 $11,000.000 $17,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $7,700.000 $13,256.320 $11,278.000 $12,000.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $15,000.000 $17,531.360 $15,172.000 $16,000.000 $19,500.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (P)
EA 4.000 $18,000.000 $24,571.680 $21,300.000 $15,000.000 $22,300.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,800.000 $2,016.000 $1,790.000 $2,000.000 $2,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $3,100.000 $2,973.600 $3,280.000 $3,200.000 $2,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 72.000 $2,300.000 $2,016.000 $3,021.000 $2,500.000 $4,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $4,600.000 $3,528.000 $6,220.000 $4,000.000 $6,000.000
ADJUSTING MANHOLES (SANITARY)
EA 6.000 $2,000.000 $1,680.000 $1,225.000 $3,000.000 $3,100.000
CLEAN EXIST CULVERTS
EA 7.000 $2,500.000 $2,326.240 $1,730.000 $5,000.000 $3,400.000
REMOV STR (BOX CULVERT)
EA 3.000 $12,000.000 $9,869.940 $5,320.000 $15,000.000 $2,900.000
REMOV STR (INLET)
EA 1.000 $1,600.000 $1,233.780 $1,330.000 $2,500.000 $2,300.000
REMOV STR (SET)
EA 10.000 $800.000 $1,480.490 $886.000 $2,000.000 $1,000.000
REMOV STR (WINGWALL)
EA 8.000 $2,000.000 $1,850.620 $1,772.000 $2,500.000 $3,200.000
REMOV STR (HEADWALL)
EA 6.000 $2,000.000 $1,644.990 $1,330.000 $2,500.000 $2,900.000
REMOV STR (PIPE)
LF 1,303.000 $25.000 $18.940 $34.250 $35.000 $40.000
ADJUST STL SHOES
EA 1.000 $10,000.000 $28,000.000 $18,000.000 $25,000.000 $11,400.000
MOBILIZATION
LS 1.000 $530,000.000 $215,847.500 $556,000.000 $535,000.000 $410,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $7,000.000 $2,016.000 $2,720.000 $10,000.000 $1,300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $45.000 $72.800 $54.000 $65.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $20.000 $33.600 $20.000 $30.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 78.000 $30.000 $50.400 $26.000 $20.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $12.000 $16.800 $15.000 $10.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 740.000 $4.300 $4.650 $3.600 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 740.000 $1.300 $1.120 $1.800 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 76.000 $8.000 $11.200 $16.500 $12.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 76.000 $2.000 $5.600 $12.000 $6.000 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 360.000 $80.000 $42.340 $95.000 $70.000 $104.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 360.000 $20.000 $42.340 $16.000 $60.000 $48.000
CONC CURB & GUTTER (TY II)
LF 1,364.800 $35.000 $27.440 $53.000 $45.000 $23.000
INTERSECTIONS (ACP)
SY 434.000 $75.000 $61.600 $90.000 $40.000 $40.000
DRIVEWAYS (ACP)
SY 437.000 $75.000 $61.600 $68.000 $40.000 $39.000
TURNOUTS (ACP)
SY 32.000 $75.000 $75.040 $100.000 $40.000 $47.000
DRIVEWAYS (ACP AND CONCRETE)
SY 877.000 $140.000 $173.600 $155.000 $100.000 $108.000
DRIVEWAYS (ACP)(TYPE 1)
SY 685.000 $80.000 $72.800 $85.000 $85.000 $60.000
INTERSECTIONS (ACP) (TYPE 1)
SY 226.000 $80.000 $72.800 $127.000 $95.000 $74.000
CONC SIDEWALKS (4")
SY 905.000 $85.000 $84.770 $98.900 $85.000 $73.000
CURB RAMPS (TY 1)
EA 2.000 $3,000.000 $3,136.000 $2,450.000 $3,500.000 $2,000.000
CURB RAMPS (TY 10)
EA 2.000 $4,500.000 $3,136.000 $3,500.000 $3,500.000 $2,400.000
RUMBLE STRIPS (SHOULDER)
LF 42,774.000 $0.200 $0.130 $0.350 $0.200 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 21,387.000 $0.250 $0.130 $0.400 $0.200 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 287.500 $25.000 $35.840 $33.000 $30.000 $36.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $3,000.000 $2,424.800 $2,150.000 $3,200.000 $2,400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,600.000 $3,802.400 $3,450.000 $4,200.000 $3,900.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,600.000 $1,512.000 $3,344.000 $2,000.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $1,288.000 $3,344.000 $2,000.000 $1,300.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $43,400.000 $42,307.650 $35,000.000 $43,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $300.000 $319.200 $325.000 $350.000 $320.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 35.000 $900.000 $868.000 $860.000 $800.000 $874.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,200.000 $1,092.000 $1,125.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 6.000 $1,900.000 $1,400.000 $1,475.000 $1,300.000 $1,400.000
REMOVE SM RD SN SUP&AM
EA 47.000 $115.000 $95.200 $94.000 $200.000 $95.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 21.000 $300.000 $168.000 $165.000 $200.000 $165.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 10.000 $95.000 $151.200 $150.000 $150.000 $150.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 5,820.000 $1.000 $0.760 $0.750 $0.750 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 84.000 $2.000 $1.120 $2.500 $2.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,744.000 $1.000 $1.120 $2.500 $3.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 456.000 $2.000 $0.870 $0.900 $0.800 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 75.000 $12.000 $17.920 $17.600 $16.500 $18.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 215.000 $1.000 $11.200 $11.000 $11.000 $11.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 48,778.000 $1.000 $0.760 $0.750 $0.700 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 5,990.000 $1.000 $0.940 $1.000 $0.900 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 1,432.000 $1.000 $0.940 $1.000 $0.850 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $290.000 $224.000 $220.000 $225.000 $225.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $350.000 $336.000 $330.000 $325.000 $338.000
PRE PM TY C (ACC PRK)(BLU)(SYMBL ONLY)
EA 1.000 $300.000 $560.000 $550.000 $525.000 $564.000
REFL PAV MRKR TY I-C
EA 23.000 $7.000 $5.600 $5.500 $5.250 $5.000
REFL PAV MRKR TY II-A-A
EA 321.000 $7.000 $5.600 $5.500 $5.250 $5.000
D-GR HMA TY-B PG64-22
TON 462.000 $105.000 $203.000 $152.000 $175.000 $166.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 12.000 $124.000 $196.000 $152.000 $250.000 $396.000
D-GR HMA TY-D SAC-B PG70-22
TON 9,352.000 $124.000 $155.690 $128.000 $132.000 $145.000
TACK COAT
GAL 7,070.000 $5.500 $4.810 $4.900 $5.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $13,440.000 $9,140.000 $15,000.000 $10,000.000
TMA (STATIONARY)
DAY 143.000 $220.000 $196.000 $260.000 $325.000 $236.000
TMA (MOBILE OPERATION)
HR 60.000 $75.000 $85.120 $198.000 $32.500 $67.000
Totals: $5,822,812.050 $5,492,231.238 $5,792,343.350 $5,793,862.700 $5,847,269.100