SAN PATRICIO US 181 (0101-04-127)

Items: 27

County: SAN PATRICIO
Length: N/A
Highway: US 181
District: CORPUS CHRISTI
Control Number: 0101-04-127
DBE Goal: N/A
Project: STP 2B20(257)HES
Guaranty: N/A
Time: 76 WORKING DAYS
Engineer's Estimate: $1,044,852.58
Date: 09/04/2020 (5 years ago)
Contract Number: N/A
Type: WRONG WAY DRIVER WARNING MARKINGS, WRONG WAY DRIVE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,044,852.58
$1,040,322.35
Over/Under Est: -0.43% -$4,530.23
$1,125,766.15
Over/Under Est: 7.74% $80,913.57
Amt Left: 8.21% $85,443.80
$1,134,207.32
Over/Under Est: 8.55% $89,354.74
Amt Left: 9.02% $93,884.97
Delta: -0.75% -$8,441.17
Over/Under Est: 23.75% $248,127.35
Amt Left: 24.29% $252,657.58
Delta: -14.00% -$158,772.61
Subcontractor Percentage Amount
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 7.06% $76,429.36
LINEAR TRAFFIC MARKINGS LLC 5.37% $58,133.94
H J HENKE, LLC 0.35% $3,788.99
Total: 12.78% $138,352.29

Bid Items & Bid Tabulations

27 Total 0 of 27
SAN PATRICIO  |  US 181  |  CORPUS CHRISTI  |  0101-04-127  |  09/04/2020  |  $1,044,852.58  |  STP 2B20(257)HES  |  WRONG WAY DRIVER WARN MRK, WRONG WAY...  |  76 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THIRD COAST SERVICES LLC
THE LEVY COMPANY, INC.
MALDONADO-BURKETT, LLP
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
MOBILIZATION
LS 1.000 $77,396.490 $100,000.000 $88,540.610 $65,000.000 $105,953.790
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,407.450 $2,100.000 $5,485.190 $1,500.000 $15,218.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 14.000 $5.700 $26.000 $6.630 $12.000 $13.880
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 14.000 $5.800 $30.000 $6.630 $12.000 $15.890
BIODEG EROSN CONT LOGS (REMOVE)
LF 28.000 $1.600 $12.000 $2.070 $10.000 $7.820
ALUMINUM SIGNS (TY O)
SF 544.000 $24.800 $26.000 $80.460 $44.100 $46.650
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 391.750 $27.050 $18.000 $18.170 $18.900 $25.550
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 39.000 $487.350 $548.000 $754.400 $577.500 $668.770
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $617.900 $750.000 $932.550 $892.500 $1,079.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 48.000 $618.050 $645.000 $829.190 $656.250 $698.580
REMOVE SM RD SN SUP&AM
EA 22.000 $59.450 $75.000 $190.990 $78.750 $328.500
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 6.000 $350.000 $50.000 $27.510 $15.750 $219.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 11,575.000 $0.750 $1.250 $1.280 $0.950 $1.470
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 3,810.000 $0.350 $0.750 $0.740 $0.470 $0.890
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 3,046.000 $0.350 $0.750 $0.740 $0.470 $0.890
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 3,636.000 $6.550 $6.300 $6.530 $7.350 $8.000
REFL PAV MRKR TY I-R
EA 364.000 $7.000 $4.500 $4.660 $4.730 $6.020
REFL PAV MRKR TY II-C-R
EA 570.000 $2.700 $4.250 $4.350 $4.730 $5.700
ELIM EXT PAV MRK & MRKS (8")
LF 11,575.000 $2.750 $0.950 $0.970 $0.790 $1.300
ELIM EXT PAV MRK & MRKS (12")
LF 439.000 $2.250 $1.050 $1.090 $1.580 $1.420
PAV SURF PREP FOR MRK (4")
LF 6,856.000 $0.050 $0.350 $0.330 $0.110 $0.620
PED POLE ASSEMBLY
EA 26.000 $1,359.900 $1,180.000 $2,293.800 $1,000.000 $1,885.200
TREE TRIMMING AND BRUSH REMOVAL
LF 568.000 $3.900 $7.500 $9.780 $8.000 $11.100
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 220.000 $65.100 $175.000 $95.840 $90.000 $82.130
TMA (STATIONARY)
DAY 76.000 $216.950 $200.000 $281.670 $150.000 $198.500
INSTALLATION OF CELLULAR MODEM
EA 13.000 $560.000 $50.000 $54,554.130 $65,020.410 $62,692.250
LED WRONG WAY DRIVER SYSTEM (THERMAL)
EA 13.000 $55,000.000 $54,000.000 $349.750 $700.000 $1,812.000
Totals: $1,044,852.578 $1,040,322.350 $1,125,766.158 $1,134,207.325 $1,292,979.932