PREPARING ROW
|
STA
|
72.000
|
$3,000.000
|
$15,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,888.000
|
$16.000
|
$9.100
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
108.000
|
$16.000
|
$34.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,637.000
|
$20.000
|
$11.250
|
|
|
REMOVING CONC (CURB)
|
LF
|
11,157.000
|
$3.500
|
$2.700
|
|
|
REMOVING CONC (CTB)
|
LF
|
910.000
|
$20.000
|
$82.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
152.000
|
$20.000
|
$18.250
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
28,272.000
|
$8.000
|
$9.400
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
51,384.000
|
$6.000
|
$10.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
13,357.000
|
$6.000
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
24,296.000
|
$3.500
|
$5.600
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
3,268.000
|
$0.500
|
$1.100
|
|
|
FERTILIZER
|
AC
|
5.695
|
$2,000.000
|
$850.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,847.520
|
$20.000
|
$34.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
19,915.000
|
$65.000
|
$90.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,320.000
|
$200.000
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
58,097.000
|
$2.500
|
$3.800
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,254.000
|
$4.500
|
$4.100
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
21,673.000
|
$3.000
|
$2.900
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
1,561.000
|
$115.000
|
$130.000
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
45,845.000
|
$3.500
|
$3.000
|
|
|
TBWC (MEMBRANE)
|
GAL
|
10,055.000
|
$3.500
|
$3.100
|
|
|
TBWC (ASPHALT)
|
TON
|
138.000
|
$140.000
|
$220.000
|
|
|
TBWC (AGGREGATE)(TY C)
|
TON
|
2,377.000
|
$130.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
113,336.000
|
$2.000
|
$1.900
|
|
|
PLANE ASPH CONC PAV (0" TO 3/4")
|
SY
|
3,180.000
|
$3.000
|
$2.500
|
|
|
PLANE ASPH CONC PAV (1/2")
|
SY
|
4,203.000
|
$1.500
|
$2.200
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
1,133.000
|
$10.000
|
$6.800
|
|
|
CEM STABIL BKFL
|
CY
|
40.000
|
$65.000
|
$83.000
|
|
|
CUT & RESTORING PAV
|
SY
|
49.000
|
$110.000
|
$390.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
477.000
|
$60.000
|
$83.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,738.000
|
$5.000
|
$5.400
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,920.000
|
$20.000
|
$25.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
4.000
|
$17,000.000
|
$13,200.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
7,566.000
|
$95.000
|
$84.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
69.000
|
$550.000
|
$820.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
28.000
|
$575.000
|
$900.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
320.000
|
$700.000
|
$970.000
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
300.000
|
$835.000
|
$1,600.000
|
|
|
CL B CONC (FLUME)
|
CY
|
35.000
|
$500.000
|
$590.000
|
|
|
CL C CONC (ABUT)
|
CY
|
28.200
|
$925.000
|
$1,300.000
|
|
|
CL C CONC (CAP)
|
CY
|
308.600
|
$1,050.000
|
$980.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
194.500
|
$850.000
|
$1,300.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
232.500
|
$950.000
|
$840.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
399.300
|
$625.000
|
$860.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
337.000
|
$375.000
|
$700.000
|
|
|
REINF CONC SLAB
|
SF
|
35,000.000
|
$18.000
|
$23.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
9,212.000
|
$50.000
|
$73.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,821.300
|
$130.000
|
$140.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
465.000
|
$550.000
|
$580.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
14.000
|
$420.000
|
$770.000
|
|
|
RAIL (TY T411)
|
LF
|
3,540.000
|
$140.000
|
$120.000
|
|
|
RAIL (TY SSTR)
|
LF
|
766.000
|
$50.000
|
$77.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,716.000
|
$55.000
|
$85.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
671.000
|
$200.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
216.000
|
$120.000
|
$130.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
5.000
|
$500.000
|
$3,900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,247.000
|
$75.000
|
$72.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
931.000
|
$90.000
|
$75.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
270.000
|
$125.000
|
$84.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$4,750.000
|
$7,200.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
2.000
|
$5,000.000
|
$8,300.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$7,750.000
|
$12,100.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
$14,000.000
|
$16,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
3.000
|
$4,250.000
|
$4,300.000
|
|
|
INLET (COMPL)(PCO)(4FT)(NONE)
|
EA
|
1.000
|
$4,250.000
|
$5,000.000
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
1.000
|
$4,800.000
|
$5,400.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
1.000
|
$5,300.000
|
$5,500.000
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
1.000
|
$5,500.000
|
$5,900.000
|
|
|
INLET (COMPL)(PCO)(6FT)(LEFT)
|
EA
|
11.000
|
$8,050.000
|
$6,300.000
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
4.000
|
$8,050.000
|
$6,300.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
1.000
|
$5,800.000
|
$5,200.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
1.000
|
$6,250.000
|
$5,200.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
18.000
|
$7,000.000
|
$4,900.000
|
|
|
INLET (COMPL)(DROP)(TY W-1)
|
EA
|
3.000
|
$6,000.000
|
$8,200.000
|
|
|
INLET (COMPL)(TRAFFIC)(TY W-1)
|
EA
|
1.000
|
$6,000.000
|
$7,700.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
16.000
|
$10,000.000
|
$9,300.000
|
|
|
INLET(COMPL)(CURB)(SPL)
|
EA
|
2.000
|
$8,000.000
|
$7,200.000
|
|
|
INLET(COMPL)(CURB)(SPL1)
|
EA
|
1.000
|
$10,000.000
|
$7,200.000
|
|
|
INLET(COMPL)(CURB)(SPL2)
|
EA
|
2.000
|
$10,000.000
|
$7,200.000
|
|
|
INLET (COMPL) (TRAFFIC) (TY W-3)
|
EA
|
1.000
|
$6,000.000
|
$18,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
11.000
|
$2,250.000
|
$4,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,050.000
|
$4,900.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
5.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
20.000
|
$650.000
|
$700.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$750.000
|
$580.000
|
|
|
REMOV STR (PIPE)
|
LF
|
8.000
|
$20.000
|
$94.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,800,000.000
|
$362,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$10,000.000
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
70.000
|
$32.000
|
$46.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
70.000
|
$15.000
|
$23.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,649.000
|
$3.500
|
$3.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,569.000
|
$1.150
|
$2.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
220.000
|
$7.000
|
$11.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
220.000
|
$2.500
|
$11.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
458.000
|
$55.000
|
$130.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
14,910.000
|
$35.000
|
$58.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,700.000
|
$30.000
|
$11.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
420.000
|
$40.000
|
$15.750
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
11,790.000
|
$8.000
|
$8.800
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
7,300.000
|
$5.000
|
$9.400
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
320.000
|
$15.000
|
$21.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
14,910.000
|
$15.000
|
$18.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,700.000
|
$11.000
|
$11.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
420.000
|
$15.000
|
$16.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
2,436.000
|
$80.000
|
$100.000
|
|
|
PERM CTB (SGL SLOPE)(SPLIT)(MOD)
|
LF
|
2,451.000
|
$100.000
|
$400.000
|
|
|
CONC CURB (TY II)
|
LF
|
5,576.000
|
$15.000
|
$13.250
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
5,166.000
|
$25.000
|
$28.000
|
|
|
CONC CURB (TY C1)
|
LF
|
745.000
|
$95.000
|
$210.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,555.000
|
$78.000
|
$74.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
810.000
|
$40.000
|
$49.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
6,706.000
|
$60.000
|
$77.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
126.000
|
$165.000
|
$300.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
22.000
|
$200.000
|
$220.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
30.000
|
$180.000
|
$320.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
166.000
|
$265.000
|
$320.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
815.000
|
$3.000
|
$39.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
7.000
|
$2,300.000
|
$7,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$1,350.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
7.000
|
$20,000.000
|
$24,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$40,000.000
|
$54,900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$8,500.000
|
$12,100.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
24.000
|
$500.000
|
$510.000
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
8.000
|
$34,500.000
|
$35,200.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,710.000
|
$10.000
|
$10.250
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,330.000
|
$30.000
|
$13.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
19,680.000
|
$1.750
|
$1.950
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
22.000
|
$1,000.000
|
$1,100.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(T)GC(O)
|
EA
|
2.000
|
$9,000.000
|
$8,800.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
771.250
|
$25.000
|
$44.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
13.000
|
$550.000
|
$590.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
11.000
|
$900.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
65.000
|
$700.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
10.000
|
$900.000
|
$730.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$1,000.000
|
$230.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
3.000
|
$750.000
|
$230.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
2.000
|
$750.000
|
$230.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-BM)
|
EA
|
2.000
|
$1,200.000
|
$230.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$3,000.000
|
$1,100.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
4.000
|
$4,500.000
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
42.000
|
$525.000
|
$960.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
70.000
|
$95.000
|
$230.000
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
2.000
|
$22,500.000
|
$21,300.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$23,500.000
|
$23,600.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$23,000.000
|
$26,500.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
5.000
|
$8,500.000
|
$2,500.000
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
1.000
|
$1,750.000
|
$840.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
24.000
|
$70.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
53.000
|
$20.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
43.000
|
$20.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
26.000
|
$20.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
22.000
|
$100.000
|
$110.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
23,747.000
|
$1.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,776.000
|
$1.500
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
61,785.000
|
$0.850
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
12,942.000
|
$1.500
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
77,624.000
|
$0.850
|
$1.100
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
66.000
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,856.000
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
456.000
|
$3.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,902.000
|
$3.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
15,610.000
|
$0.500
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
39,916.000
|
$0.500
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
44,336.000
|
$0.500
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
318.000
|
$7.000
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
78.000
|
$15.000
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
22.000
|
$220.000
|
$560.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
5.000
|
$400.000
|
$560.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
5.000
|
$400.000
|
$560.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
27.000
|
$275.000
|
$450.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
7.000
|
$35.000
|
$450.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
93.000
|
$3.500
|
$5.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,437.000
|
$3.500
|
$5.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
51,456.000
|
$1.250
|
$1.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,951.000
|
$2.000
|
$1.650
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$55.000
|
$840.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$70.000
|
$840.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
1.000
|
$250.000
|
$560.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
1.000
|
$250.000
|
$560.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
1.000
|
$250.000
|
$560.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
1.000
|
$125.000
|
$370.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
30.000
|
$2.500
|
$17.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
4,532.000
|
$4.000
|
$11.250
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
1.000
|
$250.000
|
$1,100.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
15,165.000
|
$76.000
|
$85.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
18,627.000
|
$76.000
|
$89.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
654.000
|
$90.000
|
$160.000
|
|
|
TACK COAT
|
GAL
|
5,703.000
|
$4.000
|
$3.100
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
4.000
|
$5,000.000
|
$8,400.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$15,000.000
|
|
|
LONG CHANNEL MOUNT CURB SYS (INSTALL)
|
LF
|
68.000
|
$75.000
|
$5.000
|
|
|
LED HI MST IL AM(6 FIXT)ASYM(TY B)SHLD
|
EA
|
8.000
|
$24,000.000
|
$28,100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
162.000
|
$210.000
|
$270.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
144.000
|
$75.000
|
$80.000
|
|
|
TEMP Q-DETECT SYS
|
EA
|
2.000
|
$122,500.000
|
$28,100.000
|
|
Totals: |
$19,220,077.150
|
$22,806,093.130
|