SAN PATRICIO US 181 (0101-04-114)

Items: 196

County: SAN PATRICIO
Length: N/A
Highway: US 181
District: CORPUS CHRISTI
Control Number: 0101-04-114
DBE Goal: N/A
Project: C 101-4-114
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $19,220,077.15
Date: 11/05/2020 (5 years ago)
Contract Number: N/A
Type: REVERSE ENTRANCE AND EXIT RAMPS IN NORTHBOUND DIRE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$19,220,077.15
1
Awarded
$22,806,093.13
Over/Under Est: 18.66% $3,586,015.98
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 5.03% $1,183,887.93
TRAF-TEX, INC. 4.12% $969,705.42
HIGHWAY BARRICADES AND SERVICES, LLC 3.74% $880,266.57
A. H. BECK FOUNDATION CO., INC. 2.32% $546,047.71
WEBER-BALKE FOUNDATION COMPANY, INC 1.36% $320,096.94
PERFORMANCE EQUIPMENT SERVICE 0.89% $209,475.20
SOIL TECH ADVANCE INC. 0.74% $174,170.39
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.56% $131,804.62
D & C CONCRETE CUTTING, INC. 0.21% $49,426.73
PRIMATE CONSTRUCTION, LP 0.05% $11,768.27
SCOTT DERR PAINTING CO, LLC 0.04% $9,414.62
*AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.04% $9,414.62
MUNOZ FOUNDATION DRILLING, INC. 0.00% $0.00
TRAF-TEX, INC. 0.00% $0.00
CERTIFIED PLACERS LLC 0.00% $0.00
BREDA COMPANY, INC. 0.00% $0.00
Total: 19.10% $4,495,479.02

Bid Items & Bid Tabulations

196 Total 0 of 196
SAN PATRICIO  |  US 181  |  CORPUS CHRISTI  |  0101-04-114  |  11/05/2020  |  $19,220,077.15  |  C 101-4-114  |  REVERSE ENTRANCE AND EXIT RAMPS IN N...  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
PREPARING ROW
STA 72.000 $3,000.000 $15,000.000
REMOVING CONC (RIPRAP)
SY 1,888.000 $16.000 $9.100
REMOVING CONC (SIDEWALKS)
SY 108.000 $16.000 $34.000
REMOVING CONC (DRIVEWAYS)
SY 2,637.000 $20.000 $11.250
REMOVING CONC (CURB)
LF 11,157.000 $3.500 $2.700
REMOVING CONC (CTB)
LF 910.000 $20.000 $82.000
REMOVE CONC (RAIL)
LF 152.000 $20.000 $18.250
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 28,272.000 $8.000 $9.400
EXCAVATION (ROADWAY)
CY 51,384.000 $6.000 $10.750
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,357.000 $6.000 $5.000
BLOCK SODDING
SY 24,296.000 $3.500 $5.600
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 3,268.000 $0.500 $1.100
FERTILIZER
AC 5.695 $2,000.000 $850.000
VEGETATIVE WATERING
MG 2,847.520 $20.000 $34.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 19,915.000 $65.000 $90.000
LIME (HYDRATED LIME (SLURRY))
TON 1,320.000 $200.000 $200.000
LIME TRT (SUBGRADE)(8")
SY 58,097.000 $2.500 $3.800
PRIME COAT (MC-30)
GAL 11,254.000 $4.500 $4.100
ASPH (MULTI OPTION)
GAL 21,673.000 $3.000 $2.900
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 1,561.000 $115.000 $130.000
ASPH (AC-15P OR AC-20-5TR)
GAL 45,845.000 $3.500 $3.000
TBWC (MEMBRANE)
GAL 10,055.000 $3.500 $3.100
TBWC (ASPHALT)
TON 138.000 $140.000 $220.000
TBWC (AGGREGATE)(TY C)
TON 2,377.000 $130.000 $120.000
PLANE ASPH CONC PAV (2")
SY 113,336.000 $2.000 $1.900
PLANE ASPH CONC PAV (0" TO 3/4")
SY 3,180.000 $3.000 $2.500
PLANE ASPH CONC PAV (1/2")
SY 4,203.000 $1.500 $2.200
PLANE ASPH CONC PAV (5")
SY 1,133.000 $10.000 $6.800
CEM STABIL BKFL
CY 40.000 $65.000 $83.000
CUT & RESTORING PAV
SY 49.000 $110.000 $390.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 477.000 $60.000 $83.000
TRENCH EXCAVATION PROTECTION
LF 2,738.000 $5.000 $5.400
TEMPORARY SPL SHORING
SF 3,920.000 $20.000 $25.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 4.000 $17,000.000 $13,200.000
PRESTR CONC PIL (18 IN SQ)
LF 7,566.000 $95.000 $84.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 69.000 $550.000 $820.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 28.000 $575.000 $900.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 320.000 $700.000 $970.000
DRILL SHAFT (96 IN)
LF 300.000 $835.000 $1,600.000
CL B CONC (FLUME)
CY 35.000 $500.000 $590.000
CL C CONC (ABUT)
CY 28.200 $925.000 $1,300.000
CL C CONC (CAP)
CY 308.600 $1,050.000 $980.000
CL C CONC (CAP)(MASS)
CY 194.500 $850.000 $1,300.000
CL C CONC (COLUMN)
CY 232.500 $950.000 $840.000
CL C CONC (FOOTING)(MASS)
CY 399.300 $625.000 $860.000
CL C CONC (RAIL FOUNDATION)
CY 337.000 $375.000 $700.000
REINF CONC SLAB
SF 35,000.000 $18.000 $23.000
RETAINING WALL (MSE)
SF 9,212.000 $50.000 $73.000
PRESTR CONC GIRDER (TX54)
LF 4,821.300 $130.000 $140.000
RIPRAP (CONC)(4 IN)
CY 465.000 $550.000 $580.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 14.000 $420.000 $770.000
RAIL (TY T411)
LF 3,540.000 $140.000 $120.000
RAIL (TY SSTR)
LF 766.000 $50.000 $77.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,716.000 $55.000 $85.000
RETROFIT RAIL (TY SSTR)
LF 671.000 $200.000 $120.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 216.000 $120.000 $130.000
CONC BOX CULV (6 FT X 5 FT)
LF 5.000 $500.000 $3,900.000
RC PIPE (CL III)(18 IN)
LF 1,247.000 $75.000 $72.000
RC PIPE (CL III)(24 IN)
LF 931.000 $90.000 $75.000
RC PIPE (CL III)(36 IN)
LF 270.000 $125.000 $84.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $4,750.000 $7,200.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 2.000 $5,000.000 $8,300.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $7,750.000 $12,100.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $14,000.000 $16,000.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 3.000 $4,250.000 $4,300.000
INLET (COMPL)(PCO)(4FT)(NONE)
EA 1.000 $4,250.000 $5,000.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 1.000 $4,800.000 $5,400.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $5,300.000 $5,500.000
INLET (COMPL)(PCO)(6FT)(NONE)
EA 1.000 $5,500.000 $5,900.000
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 11.000 $8,050.000 $6,300.000
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 4.000 $8,050.000 $6,300.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 1.000 $5,800.000 $5,200.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 1.000 $6,250.000 $5,200.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 18.000 $7,000.000 $4,900.000
INLET (COMPL)(DROP)(TY W-1)
EA 3.000 $6,000.000 $8,200.000
INLET (COMPL)(TRAFFIC)(TY W-1)
EA 1.000 $6,000.000 $7,700.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 16.000 $10,000.000 $9,300.000
INLET(COMPL)(CURB)(SPL)
EA 2.000 $8,000.000 $7,200.000
INLET(COMPL)(CURB)(SPL1)
EA 1.000 $10,000.000 $7,200.000
INLET(COMPL)(CURB)(SPL2)
EA 2.000 $10,000.000 $7,200.000
INLET (COMPL) (TRAFFIC) (TY W-3)
EA 1.000 $6,000.000 $18,300.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 11.000 $2,250.000 $4,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,050.000 $4,900.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 5.000 $2,000.000 $5,000.000
REMOV STR (INLET)
EA 20.000 $650.000 $700.000
REMOV STR (SET)
EA 6.000 $750.000 $580.000
REMOV STR (PIPE)
LF 8.000 $20.000 $94.000
MOBILIZATION
LS 1.000 $1,800,000.000 $362,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $10,000.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 70.000 $32.000 $46.000
ROCK FILTER DAMS (REMOVE)
LF 70.000 $15.000 $23.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,649.000 $3.500 $3.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,569.000 $1.150 $2.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 220.000 $7.000 $11.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 220.000 $2.500 $11.250
CONSTRUCTING DETOURS
SY 458.000 $55.000 $130.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 14,910.000 $35.000 $58.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,700.000 $30.000 $11.500
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 420.000 $40.000 $15.750
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 11,790.000 $8.000 $8.800
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 7,300.000 $5.000 $9.400
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 320.000 $15.000 $21.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 14,910.000 $15.000 $18.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,700.000 $11.000 $11.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 420.000 $15.000 $16.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 2,436.000 $80.000 $100.000
PERM CTB (SGL SLOPE)(SPLIT)(MOD)
LF 2,451.000 $100.000 $400.000
CONC CURB (TY II)
LF 5,576.000 $15.000 $13.250
CONC CURB & GUTTER (TY II)
LF 5,166.000 $25.000 $28.000
CONC CURB (TY C1)
LF 745.000 $95.000 $210.000
DRIVEWAYS (CONC)
SY 2,555.000 $78.000 $74.000
DRIVEWAYS (ACP)
SY 810.000 $40.000 $49.000
CONC SIDEWALKS (5")
SY 6,706.000 $60.000 $77.000
CURB RAMPS (TY 2)
SY 126.000 $165.000 $300.000
CURB RAMPS (TY 5)
SY 22.000 $200.000 $220.000
CURB RAMPS (TY 7)
SY 30.000 $180.000 $320.000
CURB RAMPS (TY 10)
SY 166.000 $265.000 $320.000
REMOVE METAL BEAM GUARD FENCE
LF 815.000 $3.000 $39.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 7.000 $2,300.000 $7,600.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $1,350.000 $2,800.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 7.000 $20,000.000 $24,500.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $40,000.000 $54,900.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $8,500.000 $12,100.000
REMOVE RD IL ASM (TRANS-BASE)
EA 24.000 $500.000 $510.000
HI MST IL POLE (125 FT)(100 MPH)
EA 8.000 $34,500.000 $35,200.000
CONDT (PVC) (SCH 40) (2")
LF 4,710.000 $10.000 $10.250
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,330.000 $30.000 $13.500
ELEC CONDR (NO.6) INSULATED
LF 19,680.000 $1.750 $1.950
GROUND BOX TY A (122311)W/APRON
EA 22.000 $1,000.000 $1,100.000
ELC SRV TY D 120/240 100(NS)SS(T)GC(O)
EA 2.000 $9,000.000 $8,800.000
ALUMINUM SIGNS (TY O)
SF 771.250 $25.000 $44.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 13.000 $550.000 $590.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 11.000 $900.000 $910.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 65.000 $700.000 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 10.000 $900.000 $730.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,000.000 $230.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 3.000 $750.000 $230.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 2.000 $750.000 $230.000
IN SM RD SN SUP&AM TYS80(1)SB(U-BM)
EA 2.000 $1,200.000 $230.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $3,000.000 $1,100.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 4.000 $4,500.000 $1,100.000
RELOCATE SM RD SN SUP&AM TY S80
EA 42.000 $525.000 $960.000
REMOVE SM RD SN SUP&AM
EA 70.000 $95.000 $230.000
INS OH SN SUP(25 FT CANT)
EA 2.000 $22,500.000 $21,300.000
INS OH SN SUP(30 FT CANT)
EA 1.000 $23,500.000 $23,600.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $23,000.000 $26,500.000
REMOVE OVERHD SIGN SUP
EA 5.000 $8,500.000 $2,500.000
REMOVE SIGN WALKWAY
EA 1.000 $1,750.000 $840.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 24.000 $70.000 $110.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 53.000 $20.000 $110.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 43.000 $20.000 $110.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 26.000 $20.000 $110.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 22.000 $100.000 $110.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 23,747.000 $1.000 $1.100
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 1,776.000 $1.500 $1.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 61,785.000 $0.850 $1.100
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 12,942.000 $1.500 $1.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 77,624.000 $0.850 $1.100
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 66.000 $2.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,856.000 $1.000 $1.100
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 456.000 $3.000 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,902.000 $3.000 $1.100
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 15,610.000 $0.500 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 39,916.000 $0.500 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 44,336.000 $0.500 $1.100
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 318.000 $7.000 $1.100
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 78.000 $15.000 $1.100
PREFAB PAV MRK TY C (W) (ARROW)
EA 22.000 $220.000 $560.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 5.000 $400.000 $560.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 5.000 $400.000 $560.000
PREFAB PAV MRK TY C (W) (WORD)
EA 27.000 $275.000 $450.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 7.000 $35.000 $450.000
REFL PAV MRKR TY I-C
EA 93.000 $3.500 $5.600
REFL PAV MRKR TY II-C-R
EA 1,437.000 $3.500 $5.600
ELIM EXT PAV MRK & MRKS (4")
LF 51,456.000 $1.250 $1.250
ELIM EXT PAV MRK & MRKS (8")
LF 1,951.000 $2.000 $1.650
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $55.000 $840.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $70.000 $840.000
VEH SIG SEC (12")LED(GRN)
EA 1.000 $250.000 $560.000
VEH SIG SEC (12")LED(YEL)
EA 1.000 $250.000 $560.000
VEH SIG SEC (12")LED(RED)
EA 1.000 $250.000 $560.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 1.000 $125.000 $370.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 30.000 $2.500 $17.000
POST AND CABLE FENCE (REMOVAL)
LF 4,532.000 $4.000 $11.250
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 1.000 $250.000 $1,100.000
D-GR HMA TY-B SAC-B PG64-22
TON 15,165.000 $76.000 $85.000
D-GR HMA TY-D SAC-B PG70-22
TON 18,627.000 $76.000 $89.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 654.000 $90.000 $160.000
TACK COAT
GAL 5,703.000 $4.000 $3.100
TIP TESTING(DRILL SHAFT)
EA 4.000 $5,000.000 $8,400.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $15,000.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 68.000 $75.000 $5.000
LED HI MST IL AM(6 FIXT)ASYM(TY B)SHLD
EA 8.000 $24,000.000 $28,100.000
TMA (STATIONARY)
DAY 162.000 $210.000 $270.000
TMA (MOBILE OPERATION)
HR 144.000 $75.000 $80.000
TEMP Q-DETECT SYS
EA 2.000 $122,500.000 $28,100.000
Totals: $19,220,077.150 $22,806,093.130