PREPARING ROW
|
AC
|
1.000
|
$10,000.000
|
$25,000.000
|
$75,000.000
|
$15,000.000
|
$50,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
56.000
|
$20.000
|
$52.000
|
$14.000
|
$30.000
|
$15.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
1.000
|
$200.000
|
$1,000.000
|
$165.000
|
$100.000
|
$450.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
170.000
|
$20.000
|
$52.000
|
$45.000
|
$30.000
|
$23.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,561.000
|
$20.000
|
$52.000
|
$24.000
|
$20.000
|
$25.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
1,508.000
|
$10.000
|
$15.000
|
$10.000
|
$15.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
691.000
|
$8.000
|
$18.000
|
$25.000
|
$20.000
|
$26.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,863.000
|
$2.500
|
$6.000
|
$4.000
|
$6.000
|
$7.000
|
|
|
BLOCK SODDING
|
SY
|
4,873.000
|
$22.000
|
$10.000
|
$7.000
|
$8.000
|
$8.000
|
|
|
VEGETATIVE WATERING
|
MG
|
88.700
|
$29.000
|
$99.000
|
$30.000
|
$70.000
|
$70.000
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$28,000.000
|
$65,000.000
|
$150,000.000
|
$60,000.000
|
$40,000.000
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
236.000
|
$16.000
|
$46.200
|
$50.000
|
$18.000
|
$72.000
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
17.000
|
$48.000
|
$85.800
|
$100.000
|
$36.000
|
$216.000
|
|
|
PLANT SOIL MIX
|
CY
|
31.000
|
$60.000
|
$105.600
|
$100.000
|
$100.000
|
$263.000
|
|
|
LANDSCAPE EDGE
|
LF
|
105.000
|
$75.000
|
$270.000
|
$400.000
|
$18.000
|
$263.000
|
|
|
PLANT BED PREPARATION
|
SY
|
60.000
|
$4.000
|
$39.600
|
$71.000
|
$39.000
|
$88.000
|
|
|
PLANT MATERIAL (15 GAL) (TREE)
|
EA
|
15.000
|
$95.000
|
$990.000
|
$165.000
|
$675.000
|
$390.000
|
|
|
PLANT MAINTENANCE
|
MO
|
8.000
|
$400.000
|
$4,620.000
|
$2,750.000
|
$4,300.000
|
$4,300.000
|
|
|
IRRIGATION SYSTEM OPER AND MAINT
|
MO
|
8.000
|
$100.000
|
$660.000
|
$2,750.000
|
$1,000.000
|
$1,170.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
71.000
|
$85.000
|
$100.000
|
$50.000
|
$400.000
|
$210.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
751.000
|
$75.000
|
$40.000
|
$95.000
|
$120.000
|
$88.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
85.000
|
$176.000
|
$661.250
|
$330.000
|
$200.000
|
$500.000
|
|
|
CL C CONC (MISC)
|
CY
|
12.700
|
$1,000.000
|
$300.000
|
$725.000
|
$900.000
|
$1,050.000
|
|
|
CL A CONC (STEPS)
|
CY
|
1.700
|
$1,000.000
|
$300.000
|
$725.000
|
$2,800.000
|
$1,800.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
12.400
|
$750.000
|
$300.000
|
$725.000
|
$600.000
|
$870.000
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
24.000
|
$125.000
|
$125.000
|
$165.000
|
$150.000
|
$200.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
68.000
|
$125.000
|
$125.000
|
$165.000
|
$150.000
|
$190.000
|
|
|
INLET (CURB)(SPL)
|
EA
|
4.000
|
$2,500.000
|
$7,500.000
|
$1,700.000
|
$4,500.000
|
$600.000
|
|
|
GRATE & FRAME
|
EA
|
54.000
|
$2,500.000
|
$2,250.000
|
$1,400.000
|
$1,300.000
|
$1,100.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
10.000
|
$1,360.000
|
$1,500.000
|
$800.000
|
$800.000
|
$360.000
|
|
|
PIPE (PVC) (SCH 80) (6 IN)
|
LF
|
22.000
|
$60.000
|
$75.000
|
$55.000
|
$150.000
|
$75.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$200.000
|
$500.000
|
$400.000
|
$80.000
|
$70.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$166,000.000
|
$40,000.000
|
$175,000.000
|
$160,000.000
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$2,500.000
|
$2,000.000
|
$900.000
|
$4,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
500.000
|
$8.000
|
$14.400
|
$0.100
|
$7.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$5.000
|
$8.100
|
$0.100
|
$7.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$2.000
|
$2.700
|
$0.100
|
$2.000
|
$1.000
|
|
|
CONC CURB (TY II)
|
LF
|
217.000
|
$20.000
|
$30.000
|
$44.000
|
$25.000
|
$26.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,942.000
|
$30.000
|
$30.000
|
$44.000
|
$30.000
|
$40.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
14.000
|
$285.000
|
$75.000
|
$252.000
|
$250.000
|
$270.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,541.000
|
$100.000
|
$75.000
|
$105.000
|
$100.000
|
$105.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
544.000
|
$70.000
|
$75.000
|
$50.000
|
$100.000
|
$150.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,972.000
|
$75.000
|
$76.000
|
$80.000
|
$85.000
|
$80.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
183.000
|
$160.000
|
$250.000
|
$100.000
|
$190.000
|
$175.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
103.000
|
$160.000
|
$250.000
|
$100.000
|
$190.000
|
$167.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
118.000
|
$160.000
|
$250.000
|
$100.000
|
$190.000
|
$172.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
18.000
|
$160.000
|
$250.000
|
$100.000
|
$190.000
|
$172.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
465.000
|
$98.000
|
$72.000
|
$210.000
|
$200.000
|
$300.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,360.000
|
$12.000
|
$24.600
|
$15.000
|
$17.750
|
$16.380
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
311.000
|
$25.000
|
$38.400
|
$35.000
|
$47.250
|
$37.440
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
16.000
|
$25.000
|
$33.600
|
$30.000
|
$33.000
|
$32.760
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
284.000
|
$45.000
|
$52.800
|
$50.000
|
$59.000
|
$51.480
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
1,671.000
|
$5.000
|
$1.080
|
$1.000
|
$6.000
|
$1.050
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
3,502.000
|
$2.000
|
$1.140
|
$1.000
|
$1.750
|
$1.110
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
320.000
|
$2.500
|
$1.920
|
$2.000
|
$2.000
|
$1.870
|
|
|
GROUND BOX TY A (122311)
|
EA
|
6.000
|
$1,500.000
|
$810.000
|
$750.000
|
$1,100.000
|
$789.750
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$975.000
|
$1,110.000
|
$1,000.000
|
$1,400.000
|
$1,082.250
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,500.000
|
$1,320.000
|
$1,200.000
|
$1,750.000
|
$1,287.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$500.000
|
$270.000
|
$250.000
|
$450.000
|
$263.250
|
|
|
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
|
EA
|
2.000
|
$8,300.000
|
$6,600.000
|
$6,000.000
|
$10,150.000
|
$6,435.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$700.000
|
$900.000
|
$550.000
|
$1,125.000
|
$1,111.500
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$675.000
|
$250.000
|
$700.000
|
$930.000
|
$921.960
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$100.000
|
$30.000
|
$105.000
|
$105.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8.000
|
$1.500
|
$1.440
|
$1.500
|
$1.500
|
$1.400
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
580.000
|
$7.000
|
$1.440
|
$9.000
|
$9.500
|
$9.360
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$500.000
|
$300.000
|
$300.000
|
$295.000
|
$292.500
|
|
REFL PAV MRK TY II (W) (BIKE ARROW)
|
EA
|
1.000
|
$100.000
|
$102.000
|
$100.000
|
$100.000
|
$99.450
|
|
REFL PAV MRK TY II (W) (BIKE SYMBOL)
|
EA
|
1.000
|
$100.000
|
$102.000
|
$100.000
|
$100.000
|
$99.450
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
16.000
|
$0.200
|
$0.540
|
$0.500
|
$0.550
|
$0.530
|
|
|
PAVEMENT SEALER 4"
|
LF
|
751.000
|
$0.200
|
$0.540
|
$0.500
|
$0.550
|
$0.530
|
|
|
PAVEMENT SEALER 8"
|
LF
|
8.000
|
$1.000
|
$1.080
|
$1.000
|
$1.000
|
$1.050
|
|
|
PAVEMENT SEALER 24"
|
LF
|
580.000
|
$2.000
|
$6.480
|
$6.000
|
$6.500
|
$6.320
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$100.000
|
$48.000
|
$45.000
|
$47.250
|
$46.800
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
4.000
|
$30.000
|
$7.200
|
$7.000
|
$7.000
|
$7.020
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
1.000
|
$30.000
|
$54.000
|
$6.000
|
$53.250
|
$52.650
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
1.000
|
$30.000
|
$54.000
|
$50.000
|
$53.250
|
$52.650
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
735.000
|
$1.000
|
$1.080
|
$1.000
|
$1.100
|
$1.050
|
|
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
|
EA
|
4.000
|
$60.000
|
$210.000
|
$200.000
|
$206.500
|
$204.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
68.000
|
$1.000
|
$0.600
|
$1.000
|
$0.600
|
$0.590
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
15.000
|
$2.000
|
$1.200
|
$1.000
|
$1.200
|
$1.170
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
587.000
|
$2.000
|
$1.800
|
$2.000
|
$1.750
|
$1.760
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
129.000
|
$4.000
|
$3.600
|
$3.000
|
$3.500
|
$3.510
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
751.000
|
$0.500
|
$0.024
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
8.000
|
$1.000
|
$0.072
|
$0.070
|
$0.070
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
580.000
|
$0.700
|
$0.360
|
$0.350
|
$0.350
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$30.000
|
$7.200
|
$7.000
|
$7.250
|
$7.020
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
4.000
|
$15.000
|
$9.600
|
$9.000
|
$9.500
|
$9.360
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
1.000
|
$20.000
|
$24.000
|
$25.000
|
$23.750
|
$23.400
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
1.000
|
$15.000
|
$24.000
|
$25.000
|
$23.750
|
$23.400
|
|
|
PED SIG SEC (LED)(2 INDICATIONS)
|
EA
|
2.000
|
$650.000
|
$594.000
|
$550.000
|
$826.000
|
$579.150
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
360.000
|
$3.000
|
$2.760
|
$2.500
|
$3.150
|
$2.690
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
340.000
|
$3.000
|
$1.800
|
$2.000
|
$2.500
|
$1.760
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$3,000.000
|
$2,520.000
|
$2,500.000
|
$3,340.000
|
$2,457.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
12.000
|
$500.000
|
$354.000
|
$325.000
|
$560.000
|
$345.150
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
2.000
|
$200.000
|
$258.000
|
$250.000
|
$140.000
|
$251.550
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
12.000
|
$80.000
|
$78.000
|
$70.000
|
$100.000
|
$76.050
|
|
|
TACK COAT
|
GAL
|
76.000
|
$5.000
|
$10.000
|
$6.000
|
$15.000
|
$14.040
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
88.000
|
$180.000
|
$300.000
|
$275.000
|
$450.000
|
$526.500
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
416.000
|
$3.000
|
$7.000
|
$3.500
|
$5.000
|
$11.000
|
|
|
CONC SIDEWALKS (5")(HISTORIC AREAS)
|
SY
|
34.000
|
$200.000
|
$75.000
|
$115.000
|
$100.000
|
$140.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
250.000
|
$60.000
|
$78.000
|
$1.000
|
$65.000
|
$80.000
|
|
|
TMA (STATIONARY)
|
DAY
|
125.000
|
$200.000
|
$334.800
|
$1.000
|
$350.000
|
$290.000
|
|
|
INSTALL DECORATIVE LIGHTING ASSEMBLY
|
EA
|
17.000
|
$5,425.000
|
$7,130.000
|
$7,000.000
|
$7,000.000
|
$7,254.000
|
|
Totals: |
$1,831,463.700
|
$1,938,855.450
|
$2,066,419.080
|
$2,066,607.230
|
$2,264,005.940
|