SAN JACINTO US0059 (6373-62-001)

Items: 47

County: SAN JACINTO
Length: N/A
Highway: US0059
District: LUFKIN
Control Number: 6373-62-001
DBE Goal: N/A
Project: RMC - 637362001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $231,860.00
Date: 01/06/2021 (5 years ago)
Contract Number: N/A
Type: REPAIR AND MAINTENANCE OF MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$231,860.00
$221,530.00
Over/Under Est: -4.46% -$10,330.00
Over/Under Est: -2.95% -$6,850.50
Amt Left: 1.57% $3,479.50
Over/Under Est: -1.94% -$4,495.00
Amt Left: 2.63% $5,835.00
Delta: -1.05% -$2,355.50
$239,625.00
Over/Under Est: 3.35% $7,765.00
Amt Left: 8.17% $18,095.00
Delta: -5.39% -$12,260.00
Over/Under Est: 8.13% $18,855.00
Amt Left: 13.17% $29,185.00
Delta: -4.63% -$11,090.00

Bid Items & Bid Tabulations

47 Total 0 of 47
SAN JACINTO  |  US0059  |  LUFKIN  |  6373-62-001  |  01/06/2021  |  $231,860.00  |  RMC - 637362001  |  REPAIR AND MAINT OF MBGF  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
P-VILLE, INCORPORATED
JCW CONSTRUCTION, LLC
SJ&J CONSTRUCTION, LLC
DBI SERVICES, LLC
ISI CONTRACTING, INC.
REMOVING CONC (CURB)
LF 125.000 $15.000 $1.000 $7.500 $20.000 $20.000 $3.000
RAIL (TY T631)
LF 75.000 $140.000 $5.000 $30.000 $140.000 $50.000 $180.000
RAIL (TY T631LS)
LF 20.000 $100.000 $5.000 $60.000 $140.000 $50.000 $225.000
MOBILIZATION (CALLOUT)
EA 12.000 $2,000.000 $1,900.000 $1.000 $1,200.000 $1,500.000 $2,800.000
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $28.000 $24.000 $30.000 $31.000 $22.500 $25.000
TERMINAL ANCHOR SECTION
EA 4.000 $135.000 $100.000 $200.000 $750.000 $750.000 $350.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,200.000 $400.000 $2,000.000 $1,800.000 $1,000.000 $2,500.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $1,115.000 $100.000 $1,000.000 $1,200.000 $750.000 $900.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $10.000 $500.000 $1,000.000 $1,000.000 $650.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,100.000 $1,200.000 $1,300.000 $1,100.000 $1,000.000 $1,300.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 125.000 $50.000 $25.000 $20.000 $30.000 $50.000 $30.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $60.000 $20.000 $50.000 $40.000 $50.000 $54.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.100 $1.000 $2.500 $4.000 $4.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $200.000 $100.000 $200.000 $190.000 $500.000 $50.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 40.000 $120.000 $1.000 $100.000 $120.000 $125.000 $1.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $250.000 $100.000 $200.000 $250.000 $500.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,875.000 $3,150.000 $3,500.000 $2,900.000 $2,500.000 $3,200.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 6.000 $1,200.000 $1,000.000 $500.000 $1,200.000 $1,500.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,725.000 $100.000 $1,500.000 $2,000.000 $500.000 $450.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $10,000.000 $2,000.000 $10,000.000 $10,000.000 $20,000.000 $35,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $30.000 $10.000 $100.000 $30.000 $25.000 $15.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $50.000 $20.000 $30.000 $60.000 $50.000 $65.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,200.000 $16.500 $14.000 $30.000 $22.000 $10.000 $16.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $30.000 $25.000 $25.000 $22.000 $50.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $50.000 $50.000 $55.000 $50.000 $50.000 $30.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 15.000 $70.000 $55.000 $100.000 $50.000 $100.000 $42.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $75.000 $10.000 $50.000 $126.000 $500.000 $75.000
REALIGN POSTS
EA 50.000 $20.000 $25.000 $20.000 $12.000 $50.000 $6.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 15.000 $29.000 $15.000 $20.000 $12.000 $75.000 $8.000
REMOVE & REPLACE BLOCKOUT
EA 50.000 $20.000 $15.000 $10.000 $30.000 $50.000 $8.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 125.000 $30.000 $26.000 $25.000 $25.000 $25.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $85.000 $60.000 $45.000 $55.000 $150.000 $45.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 20.000 $12.000 $5.000 $1.000 $35.000 $100.000 $40.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $40.000 $10.000 $1.000 $60.000 $400.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 6.000 $3,650.000 $3,150.000 $3,000.000 $2,900.000 $2,500.000 $3,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $1,050.000 $1,400.000 $1,000.000 $850.000 $1,000.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $125.000 $100.000 $50.000 $150.000 $200.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $70.000 $70.000 $1.000 $50.000 $100.000 $120.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $80.000 $65.000 $1.000 $50.000 $150.000 $90.000
REPLACE SGT STRUT
EA 5.000 $80.000 $50.000 $1.000 $58.000 $150.000 $130.000
REPLACE SGT OBJECT MARKER
EA 5.000 $30.000 $20.000 $1.000 $22.000 $50.000 $30.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 50.000 $13.500 $1.000 $30.000 $12.000 $10.000 $10.000
REPAIR (WIDE QUAD)
EA 2.000 $1,500.000 $100.000 $5,000.000 $1,500.000 $1,500.000 $2,000.000
REPAIR TAU II (W)
LF 3.000 $200.000 $22,500.000 $5,000.000 $295.000 $1,000.000 $500.000
REPAIR (TY T101RC)
LF 25.000 $45.000 $25.000 $60.000 $40.000 $75.000 $150.000
REPAIR (STL POST W/DOUBLED W-BEAMS-T6)
EA 50.000 $65.000 $1.000 $1.000 $63.000 $100.000 $25.000
TMA (STATIONARY)
DAY 20.000 $300.000 $1.000 $500.000 $150.000 $475.000 $200.000
Totals: $231,860.000 $221,530.000 $225,009.500 $227,365.000 $239,625.000 $250,715.000