Show Job Controls
Bid Cobra

SAN JACINTO US0059 (6346-18-001)

Items: 29

County: SAN JACINTO
Length: N/A
Highway: US0059
District: LUFKIN
Control Number: 6346-18-001
DBE Goal: N/A
Project: RMC - 634618001
Guaranty: N/A
Time: 60 W
Engineer's Estimate: $1,654,708.80
Date: 11/06/2019 (6 years ago)
Contract Number: N/A
Type: EROSION REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,654,708.80
$1,582,884.50
Over/Under Est: -4.34% -$71,824.30
Over/Under Est: 6.71% $110,962.79
Amt Left: 11.55% $182,787.09
$1,869,200.00
Over/Under Est: 12.96% $214,491.20
Amt Left: 18.09% $286,315.50
Delta: -5.86% -$103,528.41
$1,955,986.20
Over/Under Est: 18.21% $301,277.40
Amt Left: 23.57% $373,101.70
Delta: -4.64% -$86,786.20
Over/Under Est: 26.78% $443,183.70
Amt Left: 32.54% $515,008.00
Delta: -7.25% -$141,906.30
$2,178,840.00
Over/Under Est: 31.68% $524,131.20
Amt Left: 37.65% $595,955.50
Delta: -3.86% -$80,947.50

Bid Items & Bid Tabulations

29 Total 0 of 29
SAN JACINTO  |  US0059  |  LUFKIN  |  6346-18-001  |  11/06/2019  |  $1,654,708.80  |  RMC - 634618001  |  EROSION REPAIR  |  60 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
FIREMAN EXCAVATING, INC.
TRIPLE B SERVICES LLP
ALTUS CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
FNH CONSTRUCTION, LLC
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 619.000 $15.000 $25.000 $75.250 $14.000 $95.070 $30.000 $20.000
EXCAVATION (SPECIAL)
CY 5,583.000 $30.000 $25.000 $33.200 $19.500 $38.790 $35.000 $50.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 2,272.000 $50.000 $45.000 $45.790 $55.000 $42.080 $50.000 $50.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 80.000 $250.000 $100.000 $229.750 $200.000 $526.940 $200.000 $200.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,341.000 $6.000 $4.000 $25.000 $2.000 $11.350 $10.000 $10.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,341.000 $2.000 $1.500 $0.790 $1.000 $1.140 $3.000 $5.000
VEGETATIVE WATERING
MG 26.800 $50.000 $150.000 $120.250 $10.000 $28.770 $40.000 $100.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 1,223.000 $5.000 $3.000 $55.500 $1.500 $4.680 $10.000 $10.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 163.000 $40.000 $120.000 $160.000 $105.000 $228.490 $200.000 $80.000
PRIME COAT (MC-30)
GAL 220.000 $15.000 $20.000 $45.000 $9.500 $32.940 $30.000 $10.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 220.000 $15.000 $25.000 $47.220 $25.000 $10.620 $50.000 $10.000
AGGR (TY PE OR PL GR 4)
CY 7.000 $200.000 $1,000.000 $450.000 $485.000 $360.570 $1,000.000 $1,000.000
D-GR HMA(SQ) TY-D PG64-22
TON 61.000 $150.000 $350.000 $242.190 $355.000 $647.860 $500.000 $140.000
SHEET PILING (PZ - 27)
SF 3,400.000 $75.000 $65.000 $52.010 $186.000 $96.120 $135.000 $150.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 3,156.000 $250.000 $240.000 $240.000 $210.000 $236.800 $225.000 $250.000
GABION MATTRESSES (GALV)(12 IN)
SY 15.000 $100.000 $180.000 $173.720 $56.000 $128.540 $300.000 $300.000
GABIONS (3' X 3')(GALV)
CY 25.000 $200.000 $370.000 $286.840 $274.000 $343.400 $450.000 $500.000
GABIONS (5'X 3')(GALV)
CY 185.000 $350.000 $370.000 $632.010 $400.000 $561.520 $450.000 $500.000
MOBILIZATION
LS 1.000 $150,200.800 $150,000.000 $120,000.000 $150,000.000 $179,808.180 $200,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $2,000.000 $3,760.620 $1,100.000 $7,443.710 $25,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $30.000 $50.000 $28.290 $40.000 $40.690 $50.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $10.000 $10.000 $9.590 $5.000 $13.790 $15.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 240.000 $10.000 $8.000 $45.500 $3.000 $4.330 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 240.000 $5.000 $1.000 $20.500 $1.000 $1.900 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $25.000 $30.000 $25.850 $28.000 $33.670 $25.000 $25.000
SHORT RADIUS
LF 62.500 $40.000 $50.000 $103.000 $36.000 $73.980 $85.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,200.000 $1,500.000 $1,570.270 $1,500.000 $2,258.780 $1,500.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $5.000 $5.000 $20.250 $5.000 $4.550 $5.000 $5.000
TREE REMOVAL (30" - 36" DIA)
EA 4.000 $750.000 $1,000.000 $270.550 $1,200.000 $398.560 $5,000.000 $5,000.000
Totals: $1,654,708.800 $1,582,884.500 $1,765,671.590 $1,869,200.000 $1,955,986.206 $2,097,892.500 $2,178,840.000