PREPARING ROW
|
STA
|
15.000
|
$2,000.000
|
$7,000.000
|
$1,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
1,139.000
|
$25.000
|
$15.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,778.000
|
$12.000
|
$40.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,315.000
|
$14.500
|
$40.000
|
$30.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
13,746.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
36.000
|
$60.000
|
$10.000
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
13,746.000
|
$1.000
|
$0.750
|
$3.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
6,873.000
|
$1.000
|
$0.750
|
$3.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
6,873.000
|
$1.000
|
$0.750
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
274.900
|
$50.000
|
$1.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
2,180.000
|
$1.000
|
$2.000
|
$10.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
13.200
|
$20.000
|
$1.000
|
$1.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
37.000
|
$350.000
|
$800.000
|
$150.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
8.800
|
$1,100.000
|
$3,000.000
|
$1,500.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
830.000
|
$12.000
|
$20.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
135.000
|
$300.000
|
$300.000
|
$150.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,178.000
|
$50.000
|
$65.000
|
$150.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
80.000
|
$215.000
|
$320.000
|
$350.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,125.000
|
$335.000
|
$400.000
|
$500.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
140.000
|
$1,000.000
|
$1,500.000
|
$1,450.000
|
|
|
CL C CONC (ABUT)
|
CY
|
40.200
|
$2,400.000
|
$3,000.000
|
$3,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
39.600
|
$2,000.000
|
$3,000.000
|
$3,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
13.800
|
$2,500.000
|
$3,000.000
|
$5,000.000
|
|
|
CL C CONC (TIE BEAM)
|
CY
|
43.100
|
$3,000.000
|
$4,000.000
|
$15,000.000
|
|
|
REINF CONC SLAB
|
SF
|
10,335.000
|
$35.000
|
$40.000
|
$30.000
|
|
|
APPROACH SLAB
|
CY
|
32.100
|
$720.000
|
$2,000.000
|
$1,500.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,467.370
|
$300.000
|
$300.000
|
$235.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
328.000
|
$220.000
|
$250.000
|
$200.000
|
|
|
RAIL (TY T552)
|
LF
|
530.100
|
$130.000
|
$180.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
82.000
|
$200.000
|
$200.000
|
$200.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
11.000
|
$1,250.000
|
$2,500.000
|
$2,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$130.000
|
$120.000
|
$300.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$48,000.000
|
$70,000.000
|
$25,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$4,000.000
|
$4,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$40,000.000
|
$100,000.000
|
$250,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$313,934.490
|
$440,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$10,000.000
|
$3,000.000
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
160.000
|
$40.000
|
$1.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$10.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
94.000
|
$30.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
94.000
|
$5.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
430.000
|
$5.000
|
$1.000
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,570.000
|
$1.750
|
$1.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,570.000
|
$1.000
|
$1.000
|
$5.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
27.000
|
$4,200.000
|
$5,000.000
|
$3,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
660.000
|
$75.000
|
$80.000
|
$125.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
660.000
|
$10.000
|
$50.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
660.000
|
$12.500
|
$50.000
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
268.000
|
$65.000
|
$60.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
875.000
|
$36.000
|
$30.000
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,400.000
|
$3,000.000
|
$3,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
800.000
|
$3.250
|
$2.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$300.000
|
$500.000
|
$500.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,300.000
|
$3,100.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$325.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,200.000
|
$3,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$27,000.000
|
$31,000.000
|
$37,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$2,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
1.000
|
$1,900.000
|
$2,000.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
5.000
|
$560.000
|
$1,500.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$550.000
|
$2,000.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$140.000
|
$50.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$38.000
|
$45.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
1,767.000
|
$0.700
|
$5.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,105.000
|
$2.000
|
$5.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$14.000
|
$25.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
230.000
|
$1.300
|
$5.000
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
5,506.000
|
$1.000
|
$4.000
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
5,506.000
|
$1.000
|
$4.000
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
136.000
|
$5.000
|
$10.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,570.000
|
$0.350
|
$2.000
|
$2.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
919.000
|
$200.000
|
$250.000
|
$150.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
463.000
|
$235.000
|
$250.000
|
$150.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
370.000
|
$250.000
|
$250.000
|
$150.000
|
|
|
SP MIXES SP-D SAC-A PG76-34
|
TON
|
94.000
|
$250.000
|
$250.000
|
$150.000
|
|
|
BONDING COURSE
|
GAL
|
211.000
|
$7.000
|
$10.000
|
$25.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$70,000.000
|
$20,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
1,101.000
|
$5.000
|
$5.000
|
$15.000
|
|
|
TMA (STATIONARY)
|
DAY
|
75.000
|
$215.000
|
$300.000
|
$600.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$385.000
|
$300.000
|
$500.000
|
|
Totals: |
$3,804,737.890
|
$4,878,702.100
|
$5,076,257.050
|