SAN JACINTO US 59 (0177-02-057)

Items: 291

County: SAN JACINTO
Length: N/A
Highway: US 59
District: LUFKIN
Control Number: 0177-02-057
DBE Goal: N/A
Project: F 2023(773)
Guaranty: N/A
Time: 1309 WORKING DAYS
Engineer's Estimate: $176,543,400.31
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$176,543,400.31
1
$189,820,653.98
Over/Under Est: 7.52% $13,277,253.67
Over/Under Est: 8.8% $15,544,172.71
Amt Left: 1.19% $2,266,919.04
Subcontractor Percentage Amount
GMJ PAVING CO. 5.85% $11,150,363.12
DURWOOD GREENE CONSTRUCTION CO. 5.85% $11,150,363.12
RDI FOUNDATION DRILLING 3.88% $7,395,454.52
THIRD COAST SERVICES LLC 2.48% $4,726,991.55
J & D TEX SERV, INCORPORATED 1.89% $3,602,425.01
JBC CONSOLIDATED, LLC 1.02% $1,944,165.88
KING GEORGE TRAFFIC SOLUTIONS LLC 0.91% $1,734,500.93
TEX OP CONSTRUCTION, LP 0.70% $1,334,231.48
MBN ENTERPRISES LLC 0.52% $991,143.39
WILLOW CITY SIGN & RAIL, INC. 0.36% $686,176.19
BELLA PAVING, INC. 0.35% $667,115.74
SK CONCRETE SERVICES LLC 0.21% $400,269.45
THOMAS TRACTOR WORKS, INC. 0.20% $381,209.00
JAM MATERIALS, LLC 0.19% $362,148.55
VALLEY PLACERS, LLC 0.19% $362,148.55
CREACOM, INC. 0.17% $324,027.65
J. H. ODEN CONTRACTING COMPANY 0.15% $285,906.75
ANTIGO CONSTRUCTION, INC. 0.11% $209,664.95
LONESTAR TRAFFIC SAFETY, LLC 0.08% $152,483.60
MTAM CORPORATION 0.07% $133,423.15
PRIMATE CONSTRUCTION, LP 0.05% $95,302.25
DEPENDABLE FENCE 0.04% $76,241.80
SCOTT DERR PAINTING CO, LLC 0.03% $57,181.35
CND CONTRACTING, LLC 0.03% $57,181.35
MCRAY CRANE 0.01% $19,060.45
AGGREGATE TECHNOLOGIES, INC. 0.01% $19,060.45
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
Total: 25.35% $48,318,240.23

Bid Items & Bid Tabulations

291 Total 0 of 291
SAN JACINTO  |  US 59  |  LUFKIN  |  0177-02-057  |  06/27/2023  |  $176,543,400.31  |  F 2023(773)  |  HWY IMPRV  |  1309 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 343.000 $10,000.000 $51,060.740 $27,410.000
REMOVING CONC (PAV)
SY 155,220.000 $10.000 $4.020 $11.310
REMOVING CONC (RIPRAP)
SY 3,923.000 $8.000 $11.510 $9.430
REMOVING CONC (DRIVEWAYS)
SY 5,717.000 $27.000 $13.160 $14.030
REMOVING CONC (CURB)
LF 534.000 $4.000 $13.320 $7.330
REMOVING CONC (CTB)
LF 1,590.000 $14.000 $16.370 $19.870
REMOVING STAB BASE AND ASPH PAV (4")
SY 43,498.000 $5.000 $3.280 $3.030
REMOVING STAB BASE & ASPH PAV (8"-19")
SY 289,636.000 $10.000 $8.180 $8.350
EXCAVATION (ROADWAY)
CY 254,722.000 $8.000 $10.350 $4.820
EXCAVATION (SPECIAL)
CY 8,720.000 $9.000 $15.180 $15.930
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 923,485.000 $10.000 $8.680 $10.600
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 52,444.000 $12.000 $82.560 $108.360
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
CY 3,357.000 $15.000 $90.220 $107.170
EMBANKMENT (FINAL)(DENS CONT)(TY C4)
CY 7,381.000 $30.000 $121.340 $68.110
BACKFILL (TY B)
STA 106.000 $600.000 $411.140 $2,271.670
FURNISHING AND PLACING TOPSOIL (4")
SY 825,160.000 $2.000 $0.580 $1.180
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 825,160.000 $0.450 $0.200 $0.200
BROADCAST SEED (TEMP) (WARM)
SY 412,602.000 $0.450 $0.150 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 412,602.000 $0.470 $0.150 $0.150
BOND FBR MTRX SEED(PERM)(RURAL)(CLAY)
AC 170.480 $1,000.000 $3,755.710 $3,755.710
VEGETATIVE WATERING
MG 33,007.500 $30.000 $54.670 $57.330
LIME (QUICKLIME (DRY))
TON 3,309.000 $175.000 $342.860 $389.460
LIME TRT (EXST MATL) (6")
SY 300,009.000 $3.000 $2.930 $3.140
LIME (HYD, COM OR QK)(SLURRY)
TON 629.000 $200.000 $342.860 $389.460
CEMENT
TON 1,576.000 $229.580 $263.430 $225.610
CEMENT TREAT (EXIST MATL) (6")
SY 300,009.000 $2.000 $1.570 $2.320
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 586.000 $230.000 $264.470 $250.510
ASPH (AC-20-5TR OR AC-20XP)
GAL 27,184.000 $4.500 $5.820 $8.050
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,000.000 $120.000 $159.880 $165.270
PLANE ASPH CONC PAV (2")
SY 61,931.000 $3.500 $3.480 $2.390
PLANE ASPH CONC PAV (2"-3")
SY 18,095.000 $25.000 $4.300 $3.320
CONC PVMT (CONT REINF - CRCP) (10")
SY 269,158.000 $85.000 $67.430 $74.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 284,813.000 $100.000 $82.550 $90.040
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 7,485.000 $120.000 $112.230 $122.760
CONC PVMT (CONT REINF)(FAST TRK)(15")
SY 8,148.000 $130.000 $125.530 $125.090
FULL - DEPTH REPAIR CRCP (8"-14")
SY 1,000.000 $150.000 $507.780 $152.640
CEM STABIL BKFL
CY 7,247.000 $44.000 $129.580 $87.570
CUT & RESTORING PAV
SY 130.000 $150.000 $539.930 $312.680
CEMENT STAB BACKFILL (INLET OR MH)
CY 231.000 $85.000 $95.600 $63.240
TRENCH EXCAVATION PROTECTION
LF 3,684.000 $2.000 $31.750 $1.100
TEMPORARY SPL SHORING
SF 3,070.000 $20.000 $49.550 $8.700
DRILL SHAFT (18 IN)
LF 482.000 $100.000 $72.840 $57.120
DRILL SHAFT (24 IN)
LF 1,849.000 $150.000 $109.610 $101.900
DRILL SHAFT (30 IN)
LF 30.000 $175.000 $285.000 $230.660
DRILL SHAFT (36 IN)
LF 21,468.000 $200.000 $220.250 $225.720
DRILL SHAFT (42 IN)
LF 17.000 $300.000 $485.000 $799.440
DRILL SHAFT (48 IN)
LF 9,808.000 $375.000 $404.530 $403.320
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 42.000 $120.000 $138.300 $210.700
DRILL SHAFT (SIGN MTS) (42 IN)
LF 178.000 $485.000 $500.000 $751.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 65.000 $700.000 $595.000 $774.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 912.000 $800.000 $627.960 $689.000
CL C CONC (ABUT)
CY 1,420.300 $1,100.000 $1,457.770 $1,000.000
CL C CONC (CAP)
CY 1,725.800 $1,000.000 $1,302.800 $900.000
CL C CONC (COLUMN)
CY 1,236.700 $1,300.000 $1,257.820 $1,900.000
CL C CONC (RAIL FOUNDATION)
CY 174.000 $1,000.000 $490.230 $615.390
CL E CONC (SEAL SLAB)
CY 242.000 $550.000 $244.810 $391.100
REINF CONC SLAB
SF 454,335.000 $18.000 $21.300 $19.000
REINF CONC SLAB (SLAB BEAM)
SF 8,360.000 $18.000 $19.430 $18.970
APPROACH SLAB
CY 2,515.500 $600.000 $643.560 $565.940
RETAINING WALL (MSE)
SF 100,286.000 $40.000 $30.530 $35.000
RETAINING WALL (TEMP WALL)
SF 465.000 $20.000 $100.000 $22.740
PRESTR CONC SLAB BEAM (4SB15)
LF 652.500 $275.000 $202.990 $223.000
PRESTR CONC SLAB BEAM (5SB15)
LF 1,087.500 $300.000 $205.960 $223.000
PRESTR CONC GIRDER (TX28)
LF 22,494.890 $100.000 $155.140 $160.000
PRESTR CONC GIRDER (TX34)
LF 3,937.200 $110.000 $161.400 $155.000
PRESTR CONC GIRDER (TX40)
LF 6,615.000 $120.000 $165.960 $166.000
PRESTR CONC GIRDER (TX46)
LF 28,341.390 $130.000 $166.900 $174.000
RIPRAP (CONC)(4 IN)
CY 248.000 $500.000 $661.170 $630.890
RIPRAP (CONC)(6 IN)
CY 84.000 $550.000 $690.220 $630.890
RIPRAP (CONC)(CL B)
CY 2.000 $500.000 $1,330.160 $1,984.010
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 512.000 $600.000 $644.760 $519.780
RIPRAP (STONE PROTECTION)(18 IN)
CY 15,038.000 $170.000 $208.810 $206.570
RIPRAP (MOW STRIP)(4 IN)
CY 368.500 $500.000 $831.800 $693.160
RAIL (TY SSTR)
LF 11,853.000 $55.000 $50.240 $55.630
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 9,885.000 $60.000 $58.900 $57.900
ARMOR JOINT (SEALED)
LF 152.000 $190.000 $172.090 $86.390
JOINT SEALANT
LF 205.000 $50.000 $100.000 $5.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 3,538.700 $175.000 $192.280 $96.190
CONC BOX CULV (3 FT X 2 FT)
LF 75.000 $350.000 $275.960 $315.930
CONC BOX CULV (10 FT X 5 FT)
LF 198.000 $1,000.000 $1,044.200 $1,120.620
CONC BOX CULV (10 FT X 6 FT)
LF 497.000 $1,200.000 $1,127.990 $1,215.620
RC PIPE (CL III)(18 IN)
LF 656.000 $75.000 $114.050 $82.340
RC PIPE (CL III)(24 IN)
LF 4,017.000 $90.000 $113.630 $93.360
RC PIPE (CL III)(30 IN)
LF 424.000 $120.000 $124.530 $125.000
RC PIPE (CL III)(36 IN)
LF 3,292.000 $160.000 $135.790 $145.100
RC PIPE (ARCH)(CL III)(DES 1)
LF 208.000 $200.000 $186.950 $167.060
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 3.000 $28,000.000 $14,070.340 $16,488.670
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 2.000 $8,500.000 $8,602.790 $7,834.680
INLET (COMPL)(PCO)(5FT)(NONE)
EA 2.000 $7,800.000 $9,053.690 $8,756.960
INLET (COMPL)(PCU)(3FT)(NONE)
EA 6.000 $7,000.000 $8,817.890 $7,935.950
INLET (COMPL)(PCU)(4FT)(NONE)
EA 3.000 $9,200.000 $11,999.750 $7,141.630
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 1.000 $9,800.000 $11,545.360 $7,264.240
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $5,250.000 $6,455.510 $5,227.770
INLET (COMPL)(PSL)(FG)(5FTX6FT-3FTX5FT)
EA 1.000 $15,000.000 $11,455.490 $7,178.920
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX5FT)
EA 1.000 $17,500.000 $15,415.490 $17,060.500
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 7.000 $7,000.000 $7,661.350 $6,364.140
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $8,250.000 $6,960.490 $7,104.280
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $6,000.000 $6,891.790 $7,979.920
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $30,000.000 $55,420.570 $35,615.880
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
EA 6.000 $10,500.000 $12,345.040 $9,213.100
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $1,600.000 $1,971.850 $1,404.390
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,400.000 $2,191.840 $1,917.150
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 9.000 $2,500.000 $2,469.850 $2,284.990
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 58.000 $2,000.000 $2,469.850 $2,311.640
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $2,250.000 $2,965.840 $2,135.720
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $2,500.000 $3,527.840 $2,284.990
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 4.000 $3,000.000 $4,495.850 $3,697.730
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,500.000 $4,723.850 $5,094.480
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 6.000 $4,000.000 $4,814.850 $4,397.110
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 4.000 $4,500.000 $6,860.850 $4,434.160
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $5,500.000 $7,308.850 $5,586.460
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 12.000 $2,000.000 $3,969.850 $2,701.820
REMOV STR (BOX CULVERT)
EA 37.000 $3,000.000 $5,473.480 $8,169.080
REMOV STR (PIPE)
LF 17,151.000 $5.000 $19.490 $24.580
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $27,000.000 $41,512.980
REMOV STR (PIPE)
EA 95.000 $350.000 $1,273.480 $910.680
MOBILIZATION
LS 1.000 $14,299,000.000 $18,900,000.000 $19,175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 87.000 $16,100.000 $772.910 $9,927.210
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,850.000 $40.000 $47.050 $47.050
ROCK FILTER DAMS (REMOVE)
LF 3,850.000 $10.000 $15.940 $15.940
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 565.000 $36.000 $43.080 $43.080
CONSTRUCTION EXITS (REMOVE)
SY 565.000 $10.000 $11.440 $11.440
TEMP SEDMT CONT FENCE (INSTALL)
LF 25,088.000 $4.000 $4.100 $4.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 25,088.000 $1.000 $0.950 $0.950
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 340.000 $4.000 $14.090 $14.090
BIODEG EROSN CONT LOGS (REMOVE)
LF 340.000 $1.000 $2.620 $2.620
CONSTRUCTING DETOURS
SY 33,439.000 $95.000 $110.040 $144.480
CONSTRUCTING DETOURS (TY 1)
SY 18,095.000 $100.000 $19.040 $41.280
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,120.000 $100.000 $43.880 $59.350
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 240.000 $85.000 $93.980 $44.230
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,120.000 $10.000 $18.190 $7.600
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 240.000 $10.000 $26.610 $7.590
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 23,610.000 $53.000 $46.050 $39.530
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 50,860.000 $8.000 $8.860 $6.050
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 23,610.000 $12.000 $12.490 $5.170
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 33,574.000 $80.000 $69.400 $63.290
PERM CTB (SSCB)(TY 1)(MOD)
LF 250.000 $300.000 $251.190 $233.560
CONC CURB (U-TURN)
LF 331.000 $37.000 $32.860 $48.690
DRIVEWAYS (CONC)
SY 8,920.000 $85.000 $76.660 $80.300
DRIVEWAYS (ACP)
SY 311.000 $60.000 $61.740 $41.370
CONC SIDEWALKS (5")
SY 2,120.000 $60.000 $74.050 $66.780
CURB RAMPS (TY 1)
EA 9.000 $2,000.000 $1,850.860 $2,085.740
RUMBLE STRIPS (SHOULDER)
LF 59,256.000 $0.350 $0.400 $1.000
CONC MEDIAN
SY 5,122.000 $81.000 $59.860 $93.560
MTL W-BEAM GD FEN (TIM POST)
LF 9,562.500 $26.000 $21.500 $21.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 52.000 $2,000.000 $1,975.000 $1,975.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,500.000 $1,500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,270.000 $3.000 $2.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $500.000 $300.000 $300.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 8.000 $200.000 $150.000 $150.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $270.000 $150.000 $150.000
REMOVE CABLE BARRIER
LF 9,103.000 $6.000 $8.670 $4.880
REMOVE CABLE BARRIER TERMINAL SECTION
EA 14.000 $600.000 $861.700 $1,219.600
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $3,050.000 $2,975.000 $2,975.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $200.000 $150.000 $150.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 42.000 $2,000.000 $2,500.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 18.000 $1,650.000 $900.000 $900.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 4.000 $30,000.000 $24,500.000 $24,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 17.000 $10,000.000 $8,400.000 $8,400.000
WIRE FENCE (TY C)
LF 1,000.000 $20.000 $30.060 $22.080
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 18.000 $600.000 $710.000 $710.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 4.000 $275.000 $250.000 $250.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $280.000 $295.000 $295.000
REMOVE RD IL ASM (SHOE-BASE)
EA 4.000 $500.000 $657.840 $319.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 12.000 $800.000 $1,300.000 $1,040.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 12.000 $825.000 $1,300.000 $1,062.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 3.000 $4,000.000 $5,075.000 $4,122.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 27.000 $50,000.000 $50,250.000 $45,899.000
TEMP RD IL (RD IL ASM)
EA 7.000 $9,900.000 $5,900.000 $7,384.000
CONDT (PVC) (SCH 40) (2")
LF 60.000 $15.000 $9.500 $14.000
CONDT (PVC) (SCH 80) (2")
LF 21,735.000 $11.000 $11.000 $11.850
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,445.000 $13.000 $14.300 $14.400
CONDT (RM) (1")
LF 1,165.000 $30.000 $29.000 $16.300
CONDT (RM) (2")
LF 500.000 $50.000 $38.000 $34.840
ELEC CONDR (NO.12) BARE
LF 1,445.000 $1.100 $1.700 $1.270
ELEC CONDR (NO.12) INSULATED
LF 4,280.000 $1.300 $1.700 $1.220
ELEC CONDR (NO.8) BARE
LF 25,990.000 $1.600 $2.100 $1.820
ELEC CONDR (NO.8) INSULATED
LF 70,805.000 $1.700 $2.150 $1.900
ELEC CONDR (NO.2) BARE
LF 1,405.000 $3.750 $3.500 $3.510
ELEC CONDR (NO.2) INSULATED
LF 5,600.000 $2.000 $3.600 $2.780
GROUND BOX TY A (122311)W/APRON
EA 8.000 $1,000.000 $1,175.000 $1,107.000
GROUND BOX TY D (162922)
EA 34.000 $1,250.000 $1,050.000 $876.000
GROUND BOX TY D (162922)W/APRON
EA 66.000 $1,000.000 $1,225.000 $1,130.000
RELOCATE ELECTRICAL SERVICES
EA 1.000 $5,750.000 $1,900.000 $2,468.000
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
EA 11.000 $6,000.000 $8,045.000 $9,349.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 1.000 $6,000.000 $8,325.000 $6,231.000
ALUMINUM SIGNS (TY G)
SF 1,776.750 $40.000 $24.000 $27.250
ALUMINUM SIGNS (TY O)
SF 1,230.500 $40.000 $24.000 $28.760
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 48.000 $650.000 $450.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 50.000 $550.000 $550.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $700.000 $455.000 $455.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 7.000 $650.000 $555.000 $555.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $600.000 $740.000 $740.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $700.000 $760.000 $760.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 14.000 $900.000 $875.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $900.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 6.000 $850.000 $735.000 $735.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 1.000 $900.000 $750.000 $750.000
IN SM RD SN SUP&AM TYTWT(1)UB(P)
EA 2.000 $900.000 $510.000 $510.000
IN SM RD SN SUP&AM TYTWT(1)UB(T)
EA 1.000 $900.000 $595.000 $595.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 40.000 $450.000 $310.000 $310.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 17.000 $500.000 $370.000 $370.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,900.000 $2,610.000 $2,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 7.000 $2,100.000 $2,695.000 $2,100.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 8.000 $4,750.000 $4,200.000 $4,200.000
REMOVE SM RD SN SUP&AM
EA 173.000 $100.000 $95.000 $95.000
INSTALL LRSS (STRUCT STEEL)
LB 8,674.700 $7.500 $7.500 $7.500
REMOVE LRSA
EA 9.000 $1,000.000 $400.000 $400.000
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $50,000.000 $56,150.000 $52,833.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $55,000.000 $81,800.000 $77,035.000
INS OH SN SUP(110 FT BRDG)
EA 1.000 $120,000.000 $130,290.000 $138,611.000
INS OH SN SUP(115 FT BRDG)
EA 1.000 $241,000.000 $149,350.000 $155,658.000
SIGN WALKWAY (36 IN) WITH HNDRL
LF 30.500 $300.000 $400.000 $412.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 207.000 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 76.000 $27.000 $25.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 289.000 $29.000 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 103.000 $25.000 $35.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 54.000 $25.000 $35.000 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 17.000 $105.000 $65.000 $65.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 33,299.000 $0.600 $0.750 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 31,009.000 $0.600 $0.750 $0.750
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 12,370.000 $1.000 $3.450 $3.450
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 114,953.000 $0.900 $3.250 $3.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,501.000 $2.000 $5.500 $5.500
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 580.000 $3.500 $7.250 $7.250
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 471.000 $10.000 $15.000 $15.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 92,933.000 $0.700 $3.450 $3.450
WK ZN PAV MRK REMOV (W)12"(DOT)
LF 790.000 $3.000 $7.250 $7.250
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 2,112.000 $1.500 $0.710 $0.710
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 33,969.000 $1.500 $0.860 $0.860
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 3,658.000 $3.000 $1.670 $1.670
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 2,197.000 $4.000 $1.670 $1.670
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 33,730.000 $3.000 $0.710 $0.710
REFL PAV MRK TY II (W) 6" (BRK)
LF 33,730.000 $0.400 $0.550 $0.550
REFL PAV MRK TY II (W) 6" (DOT)
LF 2,112.000 $0.800 $0.550 $0.550
REFL PAV MRK TY II (W) 6" (SLD)
LF 150,325.000 $0.300 $0.550 $0.550
REFL PAV MRK TY II (W) 8" (SLD)
LF 30,199.000 $0.500 $0.670 $0.670
REFL PAV MRK TY II (W) 12" (SLD)
LF 3,658.000 $1.500 $0.700 $0.700
REFL PAV MRK TY II (Y) 6" (SLD)
LF 154,667.000 $0.400 $0.550 $0.550
REFL PAV MRK TY II (Y) 12" (SLD)
LF 2,197.000 $1.000 $0.700 $0.700
REFL PAV MRK TY II (BLACK) 6"(SHADOW)
LF 33,730.000 $0.500 $0.550 $0.550
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 72,469.000 $1.250 $1.010 $1.010
RE PROF PM TYI (BLK)6"(SHADOW)(090MIL)
LF 14,970.000 $1.000 $1.010 $1.010
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 48,700.000 $0.700 $0.770 $0.770
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 138,410.000 $0.500 $0.750 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 202,191.000 $0.500 $0.750 $0.750
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 159.000 $3.000 $4.000 $4.000
REFL PAV MRK TY II (W)12"(DOT)
LF 159.000 $3.500 $1.000 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 328.000 $15.000 $15.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $260.000 $180.000 $180.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 11.000 $450.000 $325.000 $325.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 11.000 $450.000 $365.000 $365.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 6.000 $350.000 $150.000 $150.000
PREFAB PAV MRK TY C (W) (WORD)
EA 15.000 $350.000 $260.000 $260.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 52.000 $30.000 $42.000 $42.000
REFL PAV MRKR TY II-C-R
EA 5,192.000 $6.000 $3.990 $3.990
ELIM EXT PAV MRK & MRKS (4")
LF 60,156.000 $0.400 $0.460 $0.460
ELIM EXT PAV MRK & MRKS (6")
LF 177,674.000 $0.550 $0.650 $0.650
ELIM EXT PAV MRK & MRKS (8")
LF 8,025.000 $0.700 $0.770 $0.770
PAV SURF PREP FOR MRK (6")
LF 374,564.000 $0.100 $0.100 $0.100
PAV SURF PREP FOR MRK (8")
LF 30,199.000 $0.400 $0.200 $0.200
PAV SURF PREP FOR MRK (12")
LF 6,014.000 $0.750 $0.400 $0.400
PAV SURF PREP FOR MRK (24")
LF 328.000 $1.500 $0.800 $0.800
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $30.000 $20.000 $20.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 11.000 $30.000 $35.000 $35.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 11.000 $35.000 $35.000 $35.000
PAV SURF PREP FOR MRK (NUMBER)
EA 6.000 $30.000 $10.000 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 15.000 $30.000 $25.000 $25.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 52.000 $15.000 $5.000 $5.000
SP MIXES SP-B PG64-22
TON 229,454.000 $69.160 $0.000 $0.000
SP MIXES SP-B PG64-28
TON 1,710.000 $69.160 $126.940 $132.000
SP MIXES SP-C SAC-A PG76-22
TON 8,708.000 $110.000 $145.990 $151.800
TACK COAT
GAL 370.000 $6.000 $5.290 $5.500
SP MIXES SP-D PG64-22 (EXEMPT)
TON 1,048.000 $250.000 $317.360 $136.400
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 46.000 $600.000 $500.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 12.000 $10,000.000 $26,400.000 $13,327.740
CCTV FIELD EQUIPMENT (ANALOG)
EA 1.000 $7,000.000 $9,850.000 $5,853.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 1.000 $12,000.000 $8,925.000 $11,492.000
ITS POLE (40 FT)(90 MPH)
EA 1.000 $16,000.000 $13,900.000 $11,842.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $8,000.000 $6,200.000 $7,337.000
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 4.000 $30,000.000 $42,600.000 $34,518.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 22.000 $35,000.000 $35,850.000 $34,162.000
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 1.000 $32,500.000 $35,850.000 $31,763.000
TMA (STATIONARY)
DAY 25.000 $165.000 $428.110 $355.490
TMA (MOBILE OPERATION)
DAY 358.000 $300.000 $789.060 $621.660
RELOCATE HIGH MAST LIGHTING ASSEMBLY
EA 3.000 $10,000.000 $15,000.000 $17,898.000
1
FL BS(RDWY DEL)(TYD GR 1-2 GR 5)(F POS)
CY 99,350.000 $80.000 $51.440 $78.060
1
CEMENT TREAT (NEW BASE) (6")
SY 595,924.000 $3.000 $1.560 $2.320
1
CEMENT ALT 1X
TON 3,583.000 $229.580 $219.530 $225.610
1
PRIME COAT (MC-30)
GAL 119,999.000 $6.000 $7.780 $7.980
1
SP MIXES SP-D PG64-22
TON 32,800.000 $139.960 $131.180 $136.400
Totals: $192,412,438.950 $189,820,654.007 $192,087,573.036