PREPARING ROW
|
STA
|
343.000
|
$10,000.000
|
$51,060.740
|
$27,410.000
|
|
|
|
REMOVING CONC (PAV)
|
SY
|
155,220.000
|
$10.000
|
$4.020
|
$11.310
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,923.000
|
$8.000
|
$11.510
|
$9.430
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
5,717.000
|
$27.000
|
$13.160
|
$14.030
|
|
|
|
REMOVING CONC (CURB)
|
LF
|
534.000
|
$4.000
|
$13.320
|
$7.330
|
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,590.000
|
$14.000
|
$16.370
|
$19.870
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
43,498.000
|
$5.000
|
$3.280
|
$3.030
|
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-19")
|
SY
|
289,636.000
|
$10.000
|
$8.180
|
$8.350
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
254,722.000
|
$8.000
|
$10.350
|
$4.820
|
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
8,720.000
|
$9.000
|
$15.180
|
$15.930
|
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
923,485.000
|
$10.000
|
$8.680
|
$10.600
|
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
52,444.000
|
$12.000
|
$82.560
|
$108.360
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
|
CY
|
3,357.000
|
$15.000
|
$90.220
|
$107.170
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C4)
|
CY
|
7,381.000
|
$30.000
|
$121.340
|
$68.110
|
|
|
|
BACKFILL (TY B)
|
STA
|
106.000
|
$600.000
|
$411.140
|
$2,271.670
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
825,160.000
|
$2.000
|
$0.580
|
$1.180
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
825,160.000
|
$0.450
|
$0.200
|
$0.200
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
412,602.000
|
$0.450
|
$0.150
|
$0.150
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
412,602.000
|
$0.470
|
$0.150
|
$0.150
|
|
|
|
BOND FBR MTRX SEED(PERM)(RURAL)(CLAY)
|
AC
|
170.480
|
$1,000.000
|
$3,755.710
|
$3,755.710
|
|
|
|
VEGETATIVE WATERING
|
MG
|
33,007.500
|
$30.000
|
$54.670
|
$57.330
|
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
3,309.000
|
$175.000
|
$342.860
|
$389.460
|
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
300,009.000
|
$3.000
|
$2.930
|
$3.140
|
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
629.000
|
$200.000
|
$342.860
|
$389.460
|
|
|
|
CEMENT
|
TON
|
1,576.000
|
$229.580
|
$263.430
|
$225.610
|
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
300,009.000
|
$2.000
|
$1.570
|
$2.320
|
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
586.000
|
$230.000
|
$264.470
|
$250.510
|
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
27,184.000
|
$4.500
|
$5.820
|
$8.050
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,000.000
|
$120.000
|
$159.880
|
$165.270
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
61,931.000
|
$3.500
|
$3.480
|
$2.390
|
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
18,095.000
|
$25.000
|
$4.300
|
$3.320
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
269,158.000
|
$85.000
|
$67.430
|
$74.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
284,813.000
|
$100.000
|
$82.550
|
$90.040
|
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
7,485.000
|
$120.000
|
$112.230
|
$122.760
|
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(15")
|
SY
|
8,148.000
|
$130.000
|
$125.530
|
$125.090
|
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
1,000.000
|
$150.000
|
$507.780
|
$152.640
|
|
|
|
CEM STABIL BKFL
|
CY
|
7,247.000
|
$44.000
|
$129.580
|
$87.570
|
|
|
|
CUT & RESTORING PAV
|
SY
|
130.000
|
$150.000
|
$539.930
|
$312.680
|
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
231.000
|
$85.000
|
$95.600
|
$63.240
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,684.000
|
$2.000
|
$31.750
|
$1.100
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,070.000
|
$20.000
|
$49.550
|
$8.700
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
482.000
|
$100.000
|
$72.840
|
$57.120
|
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,849.000
|
$150.000
|
$109.610
|
$101.900
|
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
30.000
|
$175.000
|
$285.000
|
$230.660
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
21,468.000
|
$200.000
|
$220.250
|
$225.720
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
17.000
|
$300.000
|
$485.000
|
$799.440
|
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
9,808.000
|
$375.000
|
$404.530
|
$403.320
|
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
42.000
|
$120.000
|
$138.300
|
$210.700
|
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
178.000
|
$485.000
|
$500.000
|
$751.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
65.000
|
$700.000
|
$595.000
|
$774.000
|
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
912.000
|
$800.000
|
$627.960
|
$689.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
1,420.300
|
$1,100.000
|
$1,457.770
|
$1,000.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
1,725.800
|
$1,000.000
|
$1,302.800
|
$900.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
1,236.700
|
$1,300.000
|
$1,257.820
|
$1,900.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
174.000
|
$1,000.000
|
$490.230
|
$615.390
|
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
242.000
|
$550.000
|
$244.810
|
$391.100
|
|
|
|
REINF CONC SLAB
|
SF
|
454,335.000
|
$18.000
|
$21.300
|
$19.000
|
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
8,360.000
|
$18.000
|
$19.430
|
$18.970
|
|
|
|
APPROACH SLAB
|
CY
|
2,515.500
|
$600.000
|
$643.560
|
$565.940
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
100,286.000
|
$40.000
|
$30.530
|
$35.000
|
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
465.000
|
$20.000
|
$100.000
|
$22.740
|
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
652.500
|
$275.000
|
$202.990
|
$223.000
|
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
1,087.500
|
$300.000
|
$205.960
|
$223.000
|
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
22,494.890
|
$100.000
|
$155.140
|
$160.000
|
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
3,937.200
|
$110.000
|
$161.400
|
$155.000
|
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
6,615.000
|
$120.000
|
$165.960
|
$166.000
|
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
28,341.390
|
$130.000
|
$166.900
|
$174.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
248.000
|
$500.000
|
$661.170
|
$630.890
|
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
84.000
|
$550.000
|
$690.220
|
$630.890
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.000
|
$500.000
|
$1,330.160
|
$1,984.010
|
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
512.000
|
$600.000
|
$644.760
|
$519.780
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
15,038.000
|
$170.000
|
$208.810
|
$206.570
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
368.500
|
$500.000
|
$831.800
|
$693.160
|
|
|
|
RAIL (TY SSTR)
|
LF
|
11,853.000
|
$55.000
|
$50.240
|
$55.630
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
9,885.000
|
$60.000
|
$58.900
|
$57.900
|
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
152.000
|
$190.000
|
$172.090
|
$86.390
|
|
|
|
JOINT SEALANT
|
LF
|
205.000
|
$50.000
|
$100.000
|
$5.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
3,538.700
|
$175.000
|
$192.280
|
$96.190
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
75.000
|
$350.000
|
$275.960
|
$315.930
|
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
198.000
|
$1,000.000
|
$1,044.200
|
$1,120.620
|
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
497.000
|
$1,200.000
|
$1,127.990
|
$1,215.620
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
656.000
|
$75.000
|
$114.050
|
$82.340
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,017.000
|
$90.000
|
$113.630
|
$93.360
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
424.000
|
$120.000
|
$124.530
|
$125.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
3,292.000
|
$160.000
|
$135.790
|
$145.100
|
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
208.000
|
$200.000
|
$186.950
|
$167.060
|
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
3.000
|
$28,000.000
|
$14,070.340
|
$16,488.670
|
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$8,500.000
|
$8,602.790
|
$7,834.680
|
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
2.000
|
$7,800.000
|
$9,053.690
|
$8,756.960
|
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
6.000
|
$7,000.000
|
$8,817.890
|
$7,935.950
|
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
3.000
|
$9,200.000
|
$11,999.750
|
$7,141.630
|
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
1.000
|
$9,800.000
|
$11,545.360
|
$7,264.240
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$5,250.000
|
$6,455.510
|
$5,227.770
|
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX6FT-3FTX5FT)
|
EA
|
1.000
|
$15,000.000
|
$11,455.490
|
$7,178.920
|
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX5FT)
|
EA
|
1.000
|
$17,500.000
|
$15,415.490
|
$17,060.500
|
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
7.000
|
$7,000.000
|
$7,661.350
|
$6,364.140
|
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,250.000
|
$6,960.490
|
$7,104.280
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$6,000.000
|
$6,891.790
|
$7,979.920
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$30,000.000
|
$55,420.570
|
$35,615.880
|
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
|
EA
|
6.000
|
$10,500.000
|
$12,345.040
|
$9,213.100
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$1,600.000
|
$1,971.850
|
$1,404.390
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$2,191.840
|
$1,917.150
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
9.000
|
$2,500.000
|
$2,469.850
|
$2,284.990
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$2,000.000
|
$2,469.850
|
$2,311.640
|
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,250.000
|
$2,965.840
|
$2,135.720
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$3,527.840
|
$2,284.990
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$4,495.850
|
$3,697.730
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,500.000
|
$4,723.850
|
$5,094.480
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$4,000.000
|
$4,814.850
|
$4,397.110
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$4,500.000
|
$6,860.850
|
$4,434.160
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,500.000
|
$7,308.850
|
$5,586.460
|
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$2,000.000
|
$3,969.850
|
$2,701.820
|
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
37.000
|
$3,000.000
|
$5,473.480
|
$8,169.080
|
|
|
|
REMOV STR (PIPE)
|
LF
|
17,151.000
|
$5.000
|
$19.490
|
$24.580
|
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$20,000.000
|
$27,000.000
|
$41,512.980
|
|
|
|
REMOV STR (PIPE)
|
EA
|
95.000
|
$350.000
|
$1,273.480
|
$910.680
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$14,299,000.000
|
$18,900,000.000
|
$19,175,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
87.000
|
$16,100.000
|
$772.910
|
$9,927.210
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,850.000
|
$40.000
|
$47.050
|
$47.050
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,850.000
|
$10.000
|
$15.940
|
$15.940
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
565.000
|
$36.000
|
$43.080
|
$43.080
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
565.000
|
$10.000
|
$11.440
|
$11.440
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
25,088.000
|
$4.000
|
$4.100
|
$4.100
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
25,088.000
|
$1.000
|
$0.950
|
$0.950
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
340.000
|
$4.000
|
$14.090
|
$14.090
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
340.000
|
$1.000
|
$2.620
|
$2.620
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
33,439.000
|
$95.000
|
$110.040
|
$144.480
|
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
18,095.000
|
$100.000
|
$19.040
|
$41.280
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$100.000
|
$43.880
|
$59.350
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$85.000
|
$93.980
|
$44.230
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$10.000
|
$18.190
|
$7.600
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$10.000
|
$26.610
|
$7.590
|
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
23,610.000
|
$53.000
|
$46.050
|
$39.530
|
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
50,860.000
|
$8.000
|
$8.860
|
$6.050
|
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
23,610.000
|
$12.000
|
$12.490
|
$5.170
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
33,574.000
|
$80.000
|
$69.400
|
$63.290
|
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
250.000
|
$300.000
|
$251.190
|
$233.560
|
|
|
|
CONC CURB (U-TURN)
|
LF
|
331.000
|
$37.000
|
$32.860
|
$48.690
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
8,920.000
|
$85.000
|
$76.660
|
$80.300
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
311.000
|
$60.000
|
$61.740
|
$41.370
|
|
|
|
CONC SIDEWALKS (5")
|
SY
|
2,120.000
|
$60.000
|
$74.050
|
$66.780
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
9.000
|
$2,000.000
|
$1,850.860
|
$2,085.740
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
59,256.000
|
$0.350
|
$0.400
|
$1.000
|
|
|
|
CONC MEDIAN
|
SY
|
5,122.000
|
$81.000
|
$59.860
|
$93.560
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
9,562.500
|
$26.000
|
$21.500
|
$21.500
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
52.000
|
$2,000.000
|
$1,975.000
|
$1,975.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
8.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,270.000
|
$3.000
|
$2.000
|
$2.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$500.000
|
$300.000
|
$300.000
|
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
8.000
|
$200.000
|
$150.000
|
$150.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$270.000
|
$150.000
|
$150.000
|
|
|
|
REMOVE CABLE BARRIER
|
LF
|
9,103.000
|
$6.000
|
$8.670
|
$4.880
|
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
14.000
|
$600.000
|
$861.700
|
$1,219.600
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
50.000
|
$3,050.000
|
$2,975.000
|
$2,975.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$200.000
|
$150.000
|
$150.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
42.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
18.000
|
$1,650.000
|
$900.000
|
$900.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
4.000
|
$30,000.000
|
$24,500.000
|
$24,500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
17.000
|
$10,000.000
|
$8,400.000
|
$8,400.000
|
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,000.000
|
$20.000
|
$30.060
|
$22.080
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
18.000
|
$600.000
|
$710.000
|
$710.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
4.000
|
$275.000
|
$250.000
|
$250.000
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$280.000
|
$295.000
|
$295.000
|
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
4.000
|
$500.000
|
$657.840
|
$319.000
|
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
12.000
|
$800.000
|
$1,300.000
|
$1,040.000
|
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
12.000
|
$825.000
|
$1,300.000
|
$1,062.000
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
$4,000.000
|
$5,075.000
|
$4,122.000
|
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
27.000
|
$50,000.000
|
$50,250.000
|
$45,899.000
|
|
|
|
TEMP RD IL (RD IL ASM)
|
EA
|
7.000
|
$9,900.000
|
$5,900.000
|
$7,384.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
60.000
|
$15.000
|
$9.500
|
$14.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
21,735.000
|
$11.000
|
$11.000
|
$11.850
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,445.000
|
$13.000
|
$14.300
|
$14.400
|
|
|
|
CONDT (RM) (1")
|
LF
|
1,165.000
|
$30.000
|
$29.000
|
$16.300
|
|
|
|
CONDT (RM) (2")
|
LF
|
500.000
|
$50.000
|
$38.000
|
$34.840
|
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,445.000
|
$1.100
|
$1.700
|
$1.270
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
4,280.000
|
$1.300
|
$1.700
|
$1.220
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
25,990.000
|
$1.600
|
$2.100
|
$1.820
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
70,805.000
|
$1.700
|
$2.150
|
$1.900
|
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
1,405.000
|
$3.750
|
$3.500
|
$3.510
|
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
5,600.000
|
$2.000
|
$3.600
|
$2.780
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
8.000
|
$1,000.000
|
$1,175.000
|
$1,107.000
|
|
|
|
GROUND BOX TY D (162922)
|
EA
|
34.000
|
$1,250.000
|
$1,050.000
|
$876.000
|
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
66.000
|
$1,000.000
|
$1,225.000
|
$1,130.000
|
|
|
|
RELOCATE ELECTRICAL SERVICES
|
EA
|
1.000
|
$5,750.000
|
$1,900.000
|
$2,468.000
|
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
|
EA
|
11.000
|
$6,000.000
|
$8,045.000
|
$9,349.000
|
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$8,325.000
|
$6,231.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,776.750
|
$40.000
|
$24.000
|
$27.250
|
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,230.500
|
$40.000
|
$24.000
|
$28.760
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
48.000
|
$650.000
|
$450.000
|
$450.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
50.000
|
$550.000
|
$550.000
|
$550.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$700.000
|
$455.000
|
$455.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
7.000
|
$650.000
|
$555.000
|
$555.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$600.000
|
$740.000
|
$740.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
13.000
|
$700.000
|
$760.000
|
$760.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
14.000
|
$900.000
|
$875.000
|
$875.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
6.000
|
$850.000
|
$735.000
|
$735.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$900.000
|
$750.000
|
$750.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UB(P)
|
EA
|
2.000
|
$900.000
|
$510.000
|
$510.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UB(T)
|
EA
|
1.000
|
$900.000
|
$595.000
|
$595.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
40.000
|
$450.000
|
$310.000
|
$310.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
17.000
|
$500.000
|
$370.000
|
$370.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,900.000
|
$2,610.000
|
$2,000.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
7.000
|
$2,100.000
|
$2,695.000
|
$2,100.000
|
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
8.000
|
$4,750.000
|
$4,200.000
|
$4,200.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
173.000
|
$100.000
|
$95.000
|
$95.000
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
8,674.700
|
$7.500
|
$7.500
|
$7.500
|
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
$1,000.000
|
$400.000
|
$400.000
|
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$50,000.000
|
$56,150.000
|
$52,833.000
|
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$55,000.000
|
$81,800.000
|
$77,035.000
|
|
|
|
INS OH SN SUP(110 FT BRDG)
|
EA
|
1.000
|
$120,000.000
|
$130,290.000
|
$138,611.000
|
|
|
|
INS OH SN SUP(115 FT BRDG)
|
EA
|
1.000
|
$241,000.000
|
$149,350.000
|
$155,658.000
|
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
30.500
|
$300.000
|
$400.000
|
$412.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
207.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
76.000
|
$27.000
|
$25.000
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
289.000
|
$29.000
|
$25.000
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
103.000
|
$25.000
|
$35.000
|
$35.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
54.000
|
$25.000
|
$35.000
|
$35.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
17.000
|
$105.000
|
$65.000
|
$65.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
33,299.000
|
$0.600
|
$0.750
|
$0.750
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
31,009.000
|
$0.600
|
$0.750
|
$0.750
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
12,370.000
|
$1.000
|
$3.450
|
$3.450
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
114,953.000
|
$0.900
|
$3.250
|
$3.250
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,501.000
|
$2.000
|
$5.500
|
$5.500
|
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
580.000
|
$3.500
|
$7.250
|
$7.250
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
471.000
|
$10.000
|
$15.000
|
$15.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
92,933.000
|
$0.700
|
$3.450
|
$3.450
|
|
|
|
WK ZN PAV MRK REMOV (W)12"(DOT)
|
LF
|
790.000
|
$3.000
|
$7.250
|
$7.250
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
2,112.000
|
$1.500
|
$0.710
|
$0.710
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
33,969.000
|
$1.500
|
$0.860
|
$0.860
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
3,658.000
|
$3.000
|
$1.670
|
$1.670
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
2,197.000
|
$4.000
|
$1.670
|
$1.670
|
|
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
33,730.000
|
$3.000
|
$0.710
|
$0.710
|
|
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
33,730.000
|
$0.400
|
$0.550
|
$0.550
|
|
|
|
REFL PAV MRK TY II (W) 6" (DOT)
|
LF
|
2,112.000
|
$0.800
|
$0.550
|
$0.550
|
|
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
150,325.000
|
$0.300
|
$0.550
|
$0.550
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
30,199.000
|
$0.500
|
$0.670
|
$0.670
|
|
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
3,658.000
|
$1.500
|
$0.700
|
$0.700
|
|
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
154,667.000
|
$0.400
|
$0.550
|
$0.550
|
|
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
2,197.000
|
$1.000
|
$0.700
|
$0.700
|
|
|
|
REFL PAV MRK TY II (BLACK) 6"(SHADOW)
|
LF
|
33,730.000
|
$0.500
|
$0.550
|
$0.550
|
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
72,469.000
|
$1.250
|
$1.010
|
$1.010
|
|
|
|
RE PROF PM TYI (BLK)6"(SHADOW)(090MIL)
|
LF
|
14,970.000
|
$1.000
|
$1.010
|
$1.010
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
48,700.000
|
$0.700
|
$0.770
|
$0.770
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
138,410.000
|
$0.500
|
$0.750
|
$0.750
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
202,191.000
|
$0.500
|
$0.750
|
$0.750
|
|
|
|
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
|
LF
|
159.000
|
$3.000
|
$4.000
|
$4.000
|
|
|
|
REFL PAV MRK TY II (W)12"(DOT)
|
LF
|
159.000
|
$3.500
|
$1.000
|
$1.000
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
328.000
|
$15.000
|
$15.000
|
$15.000
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$260.000
|
$180.000
|
$180.000
|
|
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
11.000
|
$450.000
|
$325.000
|
$325.000
|
|
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
11.000
|
$450.000
|
$365.000
|
$365.000
|
|
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
6.000
|
$350.000
|
$150.000
|
$150.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
15.000
|
$350.000
|
$260.000
|
$260.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
52.000
|
$30.000
|
$42.000
|
$42.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
5,192.000
|
$6.000
|
$3.990
|
$3.990
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
60,156.000
|
$0.400
|
$0.460
|
$0.460
|
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
177,674.000
|
$0.550
|
$0.650
|
$0.650
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
8,025.000
|
$0.700
|
$0.770
|
$0.770
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
374,564.000
|
$0.100
|
$0.100
|
$0.100
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
30,199.000
|
$0.400
|
$0.200
|
$0.200
|
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
6,014.000
|
$0.750
|
$0.400
|
$0.400
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
328.000
|
$1.500
|
$0.800
|
$0.800
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$30.000
|
$20.000
|
$20.000
|
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
11.000
|
$30.000
|
$35.000
|
$35.000
|
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
11.000
|
$35.000
|
$35.000
|
$35.000
|
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
6.000
|
$30.000
|
$10.000
|
$10.000
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
15.000
|
$30.000
|
$25.000
|
$25.000
|
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
52.000
|
$15.000
|
$5.000
|
$5.000
|
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
229,454.000
|
$69.160
|
$0.000
|
$0.000
|
|
|
|
SP MIXES SP-B PG64-28
|
TON
|
1,710.000
|
$69.160
|
$126.940
|
$132.000
|
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
8,708.000
|
$110.000
|
$145.990
|
$151.800
|
|
|
|
TACK COAT
|
GAL
|
370.000
|
$6.000
|
$5.290
|
$5.500
|
|
|
|
SP MIXES SP-D PG64-22 (EXEMPT)
|
TON
|
1,048.000
|
$250.000
|
$317.360
|
$136.400
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
46.000
|
$600.000
|
$500.000
|
$500.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
12.000
|
$10,000.000
|
$26,400.000
|
$13,327.740
|
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
1.000
|
$7,000.000
|
$9,850.000
|
$5,853.000
|
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$12,000.000
|
$8,925.000
|
$11,492.000
|
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
1.000
|
$16,000.000
|
$13,900.000
|
$11,842.000
|
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
1.000
|
$8,000.000
|
$6,200.000
|
$7,337.000
|
|
|
|
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
|
EA
|
4.000
|
$30,000.000
|
$42,600.000
|
$34,518.000
|
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
22.000
|
$35,000.000
|
$35,850.000
|
$34,162.000
|
|
|
|
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
|
EA
|
1.000
|
$32,500.000
|
$35,850.000
|
$31,763.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
25.000
|
$165.000
|
$428.110
|
$355.490
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
358.000
|
$300.000
|
$789.060
|
$621.660
|
|
|
|
RELOCATE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
3.000
|
$10,000.000
|
$15,000.000
|
$17,898.000
|
|
1
|
|
FL BS(RDWY DEL)(TYD GR 1-2 GR 5)(F POS)
|
CY
|
99,350.000
|
$80.000
|
$51.440
|
$78.060
|
|
1
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
595,924.000
|
$3.000
|
$1.560
|
$2.320
|
|
1
|
|
CEMENT ALT 1X
|
TON
|
3,583.000
|
$229.580
|
$219.530
|
$225.610
|
|
1
|
|
PRIME COAT (MC-30)
|
GAL
|
119,999.000
|
$6.000
|
$7.780
|
$7.980
|
|
1
|
|
SP MIXES SP-D PG64-22
|
TON
|
32,800.000
|
$139.960
|
$131.180
|
$136.400
|
|
Totals: |
$192,412,438.950
|
$189,820,654.007
|
$192,087,573.036
|