Show Job Controls
Bid Cobra

SAN AUGUSTINE US0096 (6491-00-001)

Items: 28

County: SAN AUGUSTINE
Length: 0.0100 MILES
Highway: US0096
District: LUFKIN
Control Number: 6491-00-001
DBE Goal: 0.0%
Project: RMC - A00217725
Guaranty: $4,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $181,270.00
Date: 01/05/2026 (5 months ago) Changed
Contract Number: 1261101
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00217725
Project Description: REPAIR/UPGRADE & MAINTENANCE OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
LAUREN PERRY
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$181,270.00
$120,970.05
Over/Under Est: -33.27% -$60,299.95
$142,570.00
Over/Under Est: -21.35% -$38,700.00
Amt Left: 17.86% $21,599.95
Over/Under Est: -4.43% -$8,035.00
Amt Left: 43.2% $52,264.95
Delta: -21.51% -$30,665.00
Over/Under Est: 80.15% $145,280.00
Amt Left: 169.94% $205,579.95
Delta: -88.50% -$153,315.00

Bid Items & Bid Tabulations

28 Total 0 of 28
SAN AUGUSTINE  |  US0096  |  LUFKIN  |  6491-00-001  |  01/05/2026  |  $181,270.00  |  RMC - A00217725  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACE CONTRACTORS, INC.
RHINO EQUITY, LLC
AAD CONTRACTING INC.
PREMIER CONTRACTORS LLC
RAIL (TY T631)
LF 25.000 $100.000 $1.000 $25.000 $300.000 $90.000
MOBILIZATION (CALLOUT)
EA 10.000 $750.000 $1,000.000 $150.000 $3,500.000 $2,000.000
TMA (STATIONARY)
DAY 30.000 $200.000 $400.000 $1.000 $200.000 $400.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 350.000 $60.000 $1.000 $1.000 $32.000 $75.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $1.000 $500.000 $1,000.000 $4,000.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $1,000.000 $1.000 $500.000 $1.000 $4,000.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $4.000 $1.000 $5.000 $1.000 $20.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $250.000 $0.010 $1.000 $1.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $5.000 $2,800.000 $4,000.000 $4,800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 5.000 $40.000 $20.000 $1.000 $25.000 $120.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 750.000 $25.000 $37.500 $60.000 $18.000 $60.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 10.000 $25.000 $35.000 $1.000 $20.000 $80.000
REPLACE TIMBER POST W/O CONC FND
EA 25.000 $70.000 $75.000 $200.000 $65.000 $350.000
REPLACE STEEL POST W/O CONC FND
EA 5.000 $70.000 $1.000 $1.000 $95.000 $300.000
REPLACE TIMBER POST W/ CONC FND
EA 10.000 $60.000 $1.000 $100.000 $65.000 $300.000
REPLACE STEEL POST W/ CONC FND
EA 5.000 $70.000 $1.000 $1.000 $95.000 $300.000
REALIGN POSTS
EA 30.000 $50.000 $40.000 $100.000 $30.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $7.000 $1.000 $1.000 $1.000 $500.000
REM OBSOLETE GET & REPL W/ SGT
EA 10.000 $5,000.000 $5,000.000 $4,000.000 $4,200.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $1.000 $500.000 $2,000.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 25.000 $30.000 $50.000 $40.000 $48.000 $120.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $100.000 $125.000 $150.000 $65.000 $400.000
REPLACE BLOCKOUT
EA 10.000 $1,000.000 $30.000 $1,200.000 $30.000 $165.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $50.000 $50.000 $1.000 $1.000 $500.000
RESET SGT IMPACT HEAD
EA 5.000 $200.000 $500.000 $200.000 $200.000 $1,200.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $80.000 $1.000 $1.000 $100.000 $1,800.000
REPAIR (WIDE QUAD)
LF 5.000 $3,000.000 $2,000.000 $300.000 $500.000 $1,200.000
REPAIR (T101RC)
LF 10.000 $100.000 $40.000 $50.000 $1.000 $275.000
Totals: $181,270.000 $120,970.050 $142,570.000 $173,235.000 $326,550.000