Show Job Controls
Bid Cobra

SAN AUGUSTINE US0096 (6475-50-001)

Items: 28

County: SAN AUGUSTINE
Length: 0.0100 MILES
Highway: US0096
District: LUFKIN
Control Number: 6475-50-001
DBE Goal: N/A
Project: RMC - A00212577
Guaranty: $4,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $177,895.00
Date: 01/15/2025 (1 year ago)
Contract Number: 1251103
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212577
Project Description: REPAIR/UPGRADE & MAINTENANCE OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
LAUREN PERRY
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$177,895.00
$123,070.00
Over/Under Est: -30.82% -$54,825.00
Over/Under Est: -28.71% -$51,075.00
Amt Left: 3.05% $3,750.00
Over/Under Est: -5.31% -$9,450.00
Amt Left: 36.87% $45,375.00
Delta: -32.82% -$41,625.00

Bid Items & Bid Tabulations

28 Total 0 of 28
SAN AUGUSTINE  |  US0096  |  LUFKIN  |  6475-50-001  |  01/15/2025  |  $177,895.00  |  RMC - A00212577  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACE CONTRACTORS, INC.
ABOVE ALL CONTRACTING LLC
AUSTIN BARRICADE COMPANY, L.L.C.
RAIL (TY T631)
LF 25.000 $100.000 $50.000 $100.000 $55.000
MOBILIZATION (CALLOUT)
EA 10.000 $1,000.000 $750.000 $1.000 $500.000
TMA (STATIONARY)
DAY 30.000 $200.000 $100.000 $500.000 $500.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 500.000 $60.000 $1.000 $25.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $750.000 $2,500.000 $500.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $1,000.000 $750.000 $500.000 $450.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $4.000 $0.500 $5.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $250.000 $50.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $3,000.000 $2,800.000 $2,800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 5.000 $40.000 $1.000 $50.000 $22.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,000.000 $25.000 $40.000 $20.000 $40.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 15.000 $25.000 $1.000 $50.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 10.000 $70.000 $75.000 $100.000 $500.000
REPLACE STEEL POST W/O CONC FND
EA 10.000 $70.000 $1.000 $100.000 $150.000
REPLACE TIMBER POST W/ CONC FND
EA 10.000 $60.000 $100.000 $100.000 $500.000
REPLACE STEEL POST W/ CONC FND
EA 10.000 $70.000 $1.000 $100.000 $150.000
REALIGN POSTS
EA 25.000 $50.000 $40.000 $100.000 $1.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $7.000 $1.000 $30.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 5.000 $4,000.000 $6,000.000 $3,000.000 $5,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $750.000 $750.000 $500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 70.000 $30.000 $20.000 $50.000 $80.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $100.000 $150.000 $150.000 $85.000
REPLACE BLOCKOUT
EA 20.000 $1,000.000 $25.000 $200.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $50.000 $1.000 $200.000 $150.000
RESET SGT IMPACT HEAD
EA 5.000 $200.000 $200.000 $1.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $80.000 $1.000 $100.000 $10.000
REPAIR (WIDE QUAD)
LF 5.000 $3,000.000 $500.000 $500.000 $250.000
REPAIR (T101RC)
LF 10.000 $100.000 $60.000 $100.000 $55.000
Totals: $177,895.000 $123,070.000 $126,820.000 $168,445.000