Items: 26

County: SAN AUGUSTINE
Length: N/A
Highway: US0096
District: LUFKIN
Control Number: 6457-99-001
DBE Goal: 0.0%
Project: RMC - 645799001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $169,040.00
Date: 12/20/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR - FY24 SAN AUGUSTINE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$169,040.00
$116,118.07
Over/Under Est: -31.31% -$52,921.93
Over/Under Est: -7.46% -$12,606.00
Amt Left: 34.72% $40,315.93
Over/Under Est: -2.78% -$4,700.00
Amt Left: 41.53% $48,221.93
Delta: -5.05% -$7,906.00

Bid Items & Bid Tabulations

26 Total 0 of 26
SAN AUGUSTINE  |  US0096  |  LUFKIN  |  6457-99-001  |  12/20/2023  |  $169,040.00  |  RMC - 645799001  |  METAL BEAM GUARD FENCE REPAIR - FY24...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JCW CONSTRUCTION, LLC
HAZMAT INTERNATIONAL, INC.
GARRET SHIELDS INFRASTRUCTURE
RAIL (TY T631)
LF 25.000 $94.000 $100.000 $40.000 $50.000
MOBILIZATION (CALLOUT)
EA 10.000 $2,000.000 $1.000 $2,500.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $45.000 $30.000 $20.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,000.000 $1,000.000 $1,000.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,500.000 $500.000 $800.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,100.000 $3.000 $0.010 $12.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $500.000 $1.000 $10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $4,500.000 $1.000 $2,600.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 7.000 $40.000 $0.010 $1.000 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,000.000 $45.000 $42.000 $24.000 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 25.000 $75.000 $25.000 $100.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 15.000 $100.000 $150.000 $300.000 $500.000
REPAIR STEEL POST WITH BASE PLATE
EA 3.000 $125.000 $150.000 $20.000 $100.000
REALIGN POSTS
EA 20.000 $25.000 $50.000 $600.000 $200.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 15.000 $30.000 $30.000 $20.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 3.000 $40.000 $500.000 $1,000.000 $2,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 40.000 $50.000 $110.000 $200.000 $100.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $100.000 $500.000 $500.000 $1,000.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 15.000 $6.000 $1.000 $1.000 $10.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 3.000 $5,000.000 $5,500.000 $5,000.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $1,500.000 $100.000 $1,500.000 $2,000.000
REM & RESET SGT IMPACT HEAD
EA 4.000 $250.000 $500.000 $200.000 $500.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 25.000 $25.000 $20.000 $15.000 $20.000
REPAIR (WIDE QUAD)
EA 2.000 $3,500.000 $1,000.000 $2,500.000 $3,000.000
REPAIR (TY T101RC)
LF 15.000 $45.000 $100.000 $85.000 $50.000
TMA (STATIONARY)
DAY 20.000 $400.000 $1,000.000 $100.000 $500.000
Totals: $169,040.000 $116,118.070 $156,434.000 $164,340.000