SAN AUGUSTINE US0096 (6417-38-001)

Items: 26

County: SAN AUGUSTINE
Length: N/A
Highway: US0096
District: LUFKIN
Control Number: 6417-38-001
DBE Goal: N/A
Project: RMC - 641738001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $185,265.00
Date: 01/18/2023 (3 years ago)
Contract Number: N/A
Type: REPAIR/UPGRADE & MAINTENANCE OF MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$185,265.00
$169,773.00
Over/Under Est: -8.36% -$15,492.00
Over/Under Est: 2.48% $4,588.00
Amt Left: 11.83% $20,080.00
Over/Under Est: 3.81% $7,061.00
Amt Left: 13.28% $22,553.00
Delta: -1.30% -$2,473.00
Over/Under Est: 20.1% $37,235.00
Amt Left: 31.06% $52,727.00
Delta: -15.69% -$30,174.00

Bid Items & Bid Tabulations

26 Total 0 of 26
SAN AUGUSTINE  |  US0096  |  LUFKIN  |  6417-38-001  |  01/18/2023  |  $185,265.00  |  RMC - 641738001  |  REPAIR/UPGRADE & MAINT OF MBGF  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JCW CONSTRUCTION, LLC
DIGG COMMERCIAL, LLC
ACE CONTRACTORS, INC.
GARRET SHIELDS INFRASTRUCTURE
RAIL (TY T631)
LF 75.000 $140.000 $50.000 $50.000 $145.000 $60.000
MOBILIZATION (CALLOUT)
EA 12.000 $2,000.000 $1.000 $1.000 $750.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $45.000 $20.000 $14.000 $33.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,200.000 $1,700.000 $1.000 $750.000 $1,500.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $1,115.000 $900.000 $1.000 $1,500.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.100 $10.000 $1.000 $2.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $1.000 $1.000 $1.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,875.000 $2,500.000 $2,300.000 $3,000.000 $4,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $30.000 $1.000 $50.000 $40.000 $40.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,200.000 $17.000 $15.000 $14.000 $26.000 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $60.000 $100.000 $100.000 $60.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 15.000 $70.000 $100.000 $100.000 $85.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $115.000 $300.000 $1.000 $60.000 $200.000
REALIGN POSTS
EA 30.000 $20.000 $100.000 $330.000 $25.000 $30.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 15.000 $33.000 $20.000 $1.000 $20.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 5.000 $20.000 $1,000.000 $1.000 $25.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 125.000 $30.000 $25.000 $22.000 $50.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $85.000 $500.000 $200.000 $75.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 20.000 $15.000 $1.000 $100.000 $1.000 $30.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 6.000 $3,650.000 $4,300.000 $2,300.000 $5,500.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $1,050.000 $650.000 $1.000 $1,250.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $125.000 $100.000 $1.000 $400.000 $200.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 50.000 $15.000 $15.000 $25.000 $1.000 $10.000
REPAIR (WIDE QUAD)
EA 2.000 $1,500.000 $2,500.000 $1.000 $2,500.000 $1,000.000
REPAIR (TY T101RC)
LF 25.000 $45.000 $100.000 $1.000 $50.000 $80.000
TMA (STATIONARY)
DAY 20.000 $300.000 $600.000 $5,000.000 $500.000 $300.000
Totals: $185,265.000 $169,773.000 $189,853.000 $192,326.000 $222,500.000