SAN AUGUSTINE US0096 (6373-70-001)

Items: 48

County: SAN AUGUSTINE
Length: N/A
Highway: US0096
District: LUFKIN
Control Number: 6373-70-001
DBE Goal: N/A
Project: RMC - 637370001
Guaranty: N/A
Time: 730 WORKING DAYS
Engineer's Estimate: $251,740.00
Date: 01/13/2021 (5 years ago)
Contract Number: N/A
Type: REPAIR AND MAINTENANCE OF MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$251,740.00
$209,878.00
Over/Under Est: -16.63% -$41,862.00
Over/Under Est: -15.35% -$38,644.00
Amt Left: 1.53% $3,218.00
Over/Under Est: 4.04% $10,170.00
Amt Left: 24.79% $52,032.00
Delta: -22.91% -$48,814.00
$267,400.00
Over/Under Est: 6.22% $15,660.00
Amt Left: 27.41% $57,522.00
Delta: -2.10% -$5,490.00

Bid Items & Bid Tabulations

48 Total 0 of 48
SAN AUGUSTINE  |  US0096  |  LUFKIN  |  6373-70-001  |  01/13/2021  |  $251,740.00  |  RMC - 637370001  |  REPAIR AND MAINT OF MBGF  |  730 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JCW CONSTRUCTION, LLC
ACE CONTRACTORS, INC.
SJ&J CONSTRUCTION, LLC
DBI SERVICES, LLC
REMOVING CONC (CURB)
LF 125.000 $15.000 $5.000 $10.000 $20.000 $25.000
RAIL (TY T631)
LF 75.000 $140.000 $65.000 $150.000 $120.000 $100.000
RAIL (TY T631LS)
LF 20.000 $100.000 $25.000 $135.000 $120.000 $100.000
MOBILIZATION (CALLOUT)
EA 12.000 $2,000.000 $1.000 $750.000 $1,000.000 $1,750.000
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $28.000 $22.000 $32.000 $27.000 $20.000
TERMINAL ANCHOR SECTION
EA 4.000 $135.000 $50.000 $1.000 $750.000 $500.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,200.000 $1,500.000 $1,000.000 $1,400.000 $2,000.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $1,115.000 $1,500.000 $850.000 $1,000.000 $500.000
SHORT RADIUS
LF 6.000 $250.000 $35.000 $500.000 $45.000 $150.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $250.000 $500.000 $900.000 $1,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,100.000 $700.000 $1,000.000 $1,100.000 $1,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 125.000 $50.000 $20.000 $35.000 $40.000 $25.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $60.000 $20.000 $35.000 $60.000 $100.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.100 $1.500 $3.000 $3.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $200.000 $1.000 $175.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 40.000 $120.000 $1.000 $5.000 $115.000 $50.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $250.000 $200.000 $50.000 $225.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,875.000 $3,000.000 $3,500.000 $2,900.000 $2,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 6.000 $1,200.000 $1.000 $1.000 $800.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,750.000 $5,000.000 $1,500.000 $2,000.000 $500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 3.000 $10,000.000 $1,500.000 $1,000.000 $22,000.000 $22,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $30.000 $30.000 $25.000 $30.000 $50.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $50.000 $50.000 $25.000 $60.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,200.000 $17.000 $16.000 $22.000 $20.000 $10.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $30.000 $40.000 $30.000 $29.000 $50.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $60.000 $100.000 $50.000 $46.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 15.000 $70.000 $100.000 $75.000 $55.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $115.000 $50.000 $125.000 $250.000 $250.000
REALIGN POSTS
EA 30.000 $20.000 $50.000 $25.000 $16.000 $25.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 15.000 $33.000 $15.000 $25.000 $12.000 $100.000
REMOVE & REPLACE BLOCKOUT
EA 5.000 $20.000 $100.000 $25.000 $22.000 $100.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 125.000 $30.000 $25.000 $40.000 $24.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $85.000 $100.000 $100.000 $50.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 20.000 $15.000 $1.000 $1.000 $24.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $38.000 $1.000 $1.000 $60.000 $500.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 6.000 $3,650.000 $3,100.000 $4,200.000 $2,700.000 $2,250.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $1,050.000 $1,200.000 $1,000.000 $875.000 $1,250.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $125.000 $100.000 $200.000 $80.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $70.000 $1.000 $1.000 $80.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $80.000 $1.000 $1.000 $70.000 $200.000
REPLACE SGT STRUT
EA 5.000 $80.000 $1.000 $1.000 $60.000 $200.000
REPLACE SGT OBJECT MARKER
EA 5.000 $40.000 $1.000 $25.000 $30.000 $50.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 50.000 $15.000 $12.000 $7.000 $12.000 $10.000
REPAIR (WIDE QUAD)
EA 2.000 $1,500.000 $2,500.000 $3,000.000 $1,500.000 $1,500.000
REPAIR TAU II (W)
LF 3.000 $250.000 $500.000 $4,000.000 $300.000 $2,500.000
REPAIR (TY T101RC)
LF 25.000 $45.000 $50.000 $75.000 $40.000 $100.000
REPAIR (STL POST W/DOUBLED W-BEAMS-T6)
EA 50.000 $65.000 $1.000 $75.000 $62.000 $50.000
TMA (STATIONARY)
DAY 20.000 $300.000 $2,500.000 $50.000 $100.000 $75.000
Totals: $251,740.000 $209,878.000 $213,096.000 $261,910.000 $267,400.000