PREPARING ROW
|
STA
|
395.000
|
$1,200.000
|
$1,924.090
|
$1,700.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
95.000
|
$50.000
|
$23.100
|
$23.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
127.000
|
$25.000
|
$25.200
|
$25.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
393.000
|
$400.000
|
$429.120
|
$800.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
22,531.000
|
$19.000
|
$16.580
|
$24.000
|
|
|
BLADING
|
STA
|
393.000
|
$272.000
|
$338.820
|
$320.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
46.000
|
$150.000
|
$94.500
|
$95.000
|
|
|
BLOCK SODDING
|
SY
|
1,670.000
|
$5.500
|
$5.480
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
346,574.000
|
$0.100
|
$0.120
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
346,574.000
|
$0.100
|
$0.110
|
$0.140
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
693,148.000
|
$0.500
|
$0.550
|
$0.620
|
|
|
VEGETATIVE WATERING
|
MG
|
13,899.700
|
$15.000
|
$0.010
|
$0.550
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,300.000
|
$0.500
|
$0.010
|
$8.500
|
|
|
FL BS (RDWY DEL)(TY D GR 1-2 OR GR 5)
|
TON
|
51,177.000
|
$50.000
|
$58.650
|
$69.000
|
|
|
CEMENT
|
TON
|
2,201.000
|
$250.000
|
$240.870
|
$248.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
122,276.000
|
$3.500
|
$3.050
|
$7.000
|
|
|
FOG SEAL (SS-1 OR CSS-1)
|
GAL
|
4,892.000
|
$10.000
|
$1.560
|
$5.000
|
|
|
ASPH (RC-250)
|
TON
|
131.000
|
$1,400.000
|
$1,236.690
|
$1,060.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
845.000
|
$185.000
|
$160.440
|
$230.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
261.000
|
$1,000.000
|
$974.060
|
$900.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4) (SAC-A)
|
CY
|
874.000
|
$180.000
|
$169.900
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
86.000
|
$200.000
|
$259.350
|
$259.000
|
|
|
CUT & RESTORING PAV
|
SY
|
57.000
|
$200.000
|
$129.150
|
$129.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
672.000
|
$45.000
|
$22.050
|
$22.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
16.000
|
$1,800.000
|
$2,306.850
|
$2,300.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
11.000
|
$1,000.000
|
$945.000
|
$950.000
|
|
|
CL C CONC(PILE ENCASEMENT)
|
LF
|
18.000
|
$1,400.000
|
$1,141.350
|
$1,100.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
54.000
|
$200.000
|
$200.550
|
$201.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
65.000
|
$300.000
|
$210.000
|
$215.000
|
|
|
RETROFIT RAIL (CONC PARAPET)
|
LF
|
438.000
|
$200.000
|
$172.200
|
$172.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
26.000
|
$1,200.000
|
$1,039.500
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,602.000
|
$50.000
|
$61.950
|
$62.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
278.000
|
$75.000
|
$94.500
|
$95.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
46.000
|
$160.000
|
$183.750
|
$184.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
24.000
|
$300.000
|
$220.500
|
$221.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
16.000
|
$250.000
|
$297.150
|
$297.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$8,000.000
|
$8,188.950
|
$8,200.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,000.000
|
$7,875.000
|
$7,900.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$6,000.000
|
$6,930.000
|
$6,900.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
3.000
|
$7,000.000
|
$10,290.000
|
$10,300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$7,500.000
|
$13,650.000
|
$13,700.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
3.000
|
$13,000.000
|
$15,750.000
|
$15,800.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$14,000.000
|
$19,156.200
|
$19,200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$15,000.000
|
$20,084.400
|
$20,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
3.000
|
$15,000.000
|
$20,370.000
|
$20,400.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$20,000.000
|
$28,350.000
|
$28,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
11.000
|
$650.000
|
$840.000
|
$840.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
112.000
|
$800.000
|
$840.000
|
$840.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,100.000
|
$1,470.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,470.000
|
$1,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$1,500.000
|
$1,890.000
|
$1,900.000
|
|
|
REMOV STR (PIPE)
|
EA
|
57.000
|
$300.000
|
$420.000
|
$420.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,050,000.000
|
$731,000.000
|
$930,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
33.000
|
$3,000.000
|
$3,835.840
|
$4,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
840.000
|
$30.000
|
$18.380
|
$34.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
840.000
|
$8.000
|
$7.350
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$22.000
|
$1.000
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$9.000
|
$1.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
15,541.000
|
$3.000
|
$4.890
|
$3.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
15,541.000
|
$1.000
|
$1.000
|
$1.100
|
|
|
DRIVEWAYS (CONC)
|
SY
|
127.000
|
$150.000
|
$149.100
|
$149.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,096.000
|
$45.000
|
$55.280
|
$65.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
1,142.000
|
$50.000
|
$76.840
|
$83.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
78,556.000
|
$0.180
|
$0.120
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
39,078.000
|
$0.340
|
$0.120
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,550.000
|
$20.000
|
$21.320
|
$21.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,000.000
|
$2,178.750
|
$1,800.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,600.000
|
$1,365.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$2.500
|
$4.200
|
$4.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,200.000
|
$3,176.250
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$285.000
|
$420.000
|
$420.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
32.000
|
$225.000
|
$261.450
|
$194.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
4.000
|
$250.000
|
$308.700
|
$236.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$650.000
|
$718.200
|
$610.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$800.000
|
$929.250
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$983.850
|
$890.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
45.000
|
$390.000
|
$462.000
|
$441.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$100.000
|
$98.700
|
$78.750
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
54.000
|
$25.000
|
$33.600
|
$33.600
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
50.000
|
$114.000
|
$128.100
|
$158.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
729.000
|
$0.400
|
$0.530
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
76,013.000
|
$0.400
|
$0.320
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
17,455.000
|
$1.000
|
$2.100
|
$1.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,032.000
|
$1.000
|
$1.500
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
78,956.000
|
$0.600
|
$0.890
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
729.000
|
$0.600
|
$1.050
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
76,013.000
|
$0.600
|
$0.890
|
$0.900
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
32.000
|
$15.000
|
$23.630
|
$23.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
988.000
|
$3.750
|
$4.200
|
$4.200
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$50,000.000
|
$12,600.000
|
$17,900.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$4,700.000
|
$12,600.000
|
$4,200.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
13,451.000
|
$140.000
|
$182.020
|
$164.000
|
|
|
SP MIXES SP-D PG64-22 (EXEMPT)
|
TON
|
446.000
|
$140.000
|
$266.490
|
$337.000
|
|
|
BONDING COURSE
|
GAL
|
6,115.000
|
$4.600
|
$5.780
|
$3.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$65,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,040.000
|
$150.000
|
$1.000
|
$50.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$150.000
|
$50.000
|
$274.000
|
|
Totals: |
$11,186,553.500
|
$12,057,157.967
|
$13,537,095.725
|