Bid Cobra

SAN AUGUSTINE SH 21 (0118-10-057)

Items: 88

County: SAN AUGUSTINE
Length: N/A
Highway: SH 21
District: LUFKIN
Control Number: 0118-10-057
DBE Goal: N/A
Project: BR 1702(518)
Guaranty: N/A
Time: 198 WORKING DAYS
Engineer's Estimate: $5,596,387.95
Date: 07/11/2017 (8 years ago)
Contract Number: N/A
Type: REMOVE & REPLACE 2 STRUCTURES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$5,596,387.95
Over/Under Est: -5.44% -$304,229.34
Over/Under Est: -5.26% -$294,597.70
Amt Left: 0.18% $9,631.64
Over/Under Est: 7.36% $411,681.47
Amt Left: 13.53% $715,910.81
Delta: -13.32% -$706,279.17
Over/Under Est: 10.67% $597,105.45
Amt Left: 17.03% $901,334.79
Delta: -3.09% -$185,423.98
Over/Under Est: 20.7% $1,158,309.25
Amt Left: 27.64% $1,462,538.59
Delta: -9.06% -$561,203.80

Bid Items & Bid Tabulations

88 Total 0 of 88
SAN AUGUSTINE  |  SH 21  |  LUFKIN  |  0118-10-057  |  07/11/2017  |  $5,596,387.95  |  BR 1702(518)  |  REMOVE & REPLACE 2 STRUCTS  |  198 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
OLDCASTLE MATERIALS TEXAS, INC.
PREPARING ROW
STA 26.290 $2,500.000 $3,000.000 $3,200.000 $1,500.000 $5,000.000 $1,900.000
REM STAB BASE & ASPH (6"-12")
SY 10,180.000 $7.000 $3.000 $3.500 $12.000 $5.000 $9.000
EXCAVATION (ROADWAY)
CY 9,812.000 $6.000 $7.250 $6.000 $30.000 $7.000 $10.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 19,667.000 $10.000 $12.500 $11.000 $18.000 $12.000 $23.500
COMPOST MANUF TOPSOIL (4")
SY 24,189.000 $2.000 $2.950 $1.700 $3.000 $2.000 $1.250
BLOCK SODDING
SY 42.000 $4.500 $10.500 $11.000 $10.000 $20.000 $10.150
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 24,189.000 $0.250 $0.300 $0.350 $0.350 $0.400 $0.290
CELL FBR MLCH SEED(TEMP)(WARM)
SY 12,096.000 $0.250 $0.290 $0.350 $0.310 $0.400 $0.290
CELL FBR MLCH SEED(TEMP)(COOL)
SY 12,096.000 $0.250 $0.290 $0.350 $0.310 $0.400 $0.290
VEGETATIVE WATERING
MG 1.210 $20.000 $135.000 $35.000 $1,000.000 $100.000 $820.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 1,244.000 $2.000 $1.350 $1.700 $5.000 $2.000 $1.300
FL BS (RDWY DEL) (TY A GR 1-2)
TON 10,077.000 $40.000 $43.800 $36.000 $60.000 $50.000 $42.000
CEMENT
TON 391.000 $160.000 $168.000 $180.000 $165.000 $200.000 $162.000
CEMENT TREAT (NEW BASE 14")
SY 9,056.000 $4.000 $2.950 $2.500 $3.500 $6.000 $6.000
CEM TRT(MX EXST MTL & NEW BS)(14")
SY 5,162.000 $5.000 $3.650 $2.500 $3.500 $6.000 $2.700
CEMENT TREAT (SUBGRADE)(12")
SY 5,850.000 $4.500 $3.250 $2.000 $3.500 $6.000 $1.820
ASPH (RC-250)
GAL 3,321.000 $5.000 $4.650 $4.000 $10.000 $7.000 $2.850
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 11,761.000 $3.000 $3.050 $3.250 $5.000 $4.000 $3.850
AGGR (TY-PE, E, L OR PL GR 3)
CY 148.000 $160.000 $230.000 $180.000 $160.000 $200.000 $159.000
AGGR (TY E OR L, PE OR PL GR 4)
CY 122.000 $175.000 $170.000 $190.000 $180.000 $200.000 $170.000
AGGR (TY E OR L GR 5)
CY 102.000 $150.000 $235.000 $150.000 $120.000 $200.000 $175.000
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
SY 385.000 $35.000 $85.000 $36.000 $42.000 $70.000 $40.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 1,470.000 $110.000 $108.000 $100.000 $130.000 $118.000 $110.000
CEM STABIL BKFL
CY 188.000 $180.000 $150.000 $160.000 $210.000 $250.000 $190.000
CUT & RESTORING PAV
SY 46.000 $200.000 $72.000 $78.000 $180.000 $100.000 $205.000
FLOWABLE BACKFILL
CY 2.900 $350.000 $295.000 $160.000 $210.000 $500.000 $355.000
DRILL SHAFT (18 IN)
LF 152.000 $50.000 $46.000 $52.000 $85.000 $60.000 $130.000
DRILL SHAFT (36 IN)
LF 1,682.000 $160.000 $149.000 $180.000 $150.000 $190.000 $205.000
CL C CONC (ABUT)
CY 61.600 $900.000 $1,000.000 $800.000 $900.000 $1,000.000 $970.000
CL C CONC (CAP)
CY 238.800 $900.000 $1,000.000 $800.000 $1,000.000 $900.000 $1,300.000
CL C CONC (COLUMN)
CY 134.600 $900.000 $1,000.000 $800.000 $1,000.000 $1,000.000 $1,470.000
REINF CONC SLAB
SF 54,786.000 $20.000 $17.000 $17.000 $19.000 $18.000 $23.500
APPROACH SLAB
CY 70.600 $450.000 $500.000 $410.000 $500.000 $500.000 $560.000
PRESTR CONC GIRDER (TX40)
LF 7,107.000 $140.000 $114.000 $135.000 $133.000 $150.000 $115.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 124.000 $500.000 $475.000 $535.000 $500.000 $425.000 $570.000
RIPRAP (CONC) (CL B) (4")
CY 479.000 $500.000 $525.000 $435.000 $400.000 $425.000 $555.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 12.000 $200.000 $132.000 $250.000 $180.000 $300.000 $155.000
RAIL (TY T223)
LF 2,442.000 $80.000 $99.000 $120.000 $100.000 $90.000 $141.000
ARMOR JOINT
LF 336.000 $60.000 $59.000 $65.000 $100.000 $45.000 $84.000
CMP (GAL STL 12 IN)
LF 69.000 $85.000 $38.000 $35.000 $35.000 $50.000 $51.000
RC PIPE (CL III)(18 IN)
LF 175.000 $50.000 $46.000 $40.000 $35.000 $50.000 $66.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $500.000 $700.000 $600.000 $550.000 $500.000 $1,010.000
REMOV STR (SET)
EA 2.000 $750.000 $200.000 $380.000 $250.000 $500.000 $760.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $50,000.000 $30,000.000 $42,000.000 $40,000.000 $45,000.000 $105,000.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $50,000.000 $100,000.000 $86,000.000 $80,000.000 $100,000.000 $200,000.000
REMOV STR (PIPE)
EA 2.000 $350.000 $300.000 $380.000 $500.000 $1,000.000 $760.000
MOBILIZATION
LS 1.000 $500,000.000 $375,000.000 $425,000.000 $250,000.000 $600,000.000 $638,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $2,000.000 $1,120.000 $1,000.000 $1,500.000 $5,000.000 $1,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 180.000 $30.000 $31.000 $30.000 $55.000 $26.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 180.000 $10.000 $8.400 $8.000 $10.000 $10.000 $8.100
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $15.000 $23.000 $22.000 $23.000 $26.000 $22.100
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $5.000 $8.400 $8.000 $8.000 $10.000 $8.050
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,573.000 $3.000 $3.000 $3.500 $3.000 $3.000 $2.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,573.000 $1.000 $0.800 $1.000 $1.000 $1.000 $0.770
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 490.000 $40.000 $72.000 $65.000 $65.000 $75.000 $39.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 652.000 $20.000 $12.000 $5.000 $20.000 $10.000 $9.500
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 490.000 $20.000 $10.720 $6.000 $20.000 $15.000 $37.000
DRIVEWAYS AND TURNOUTS (ACP)
SY 420.000 $40.000 $35.000 $50.000 $35.000 $50.000 $27.500
RUMBLE STRIPS (SHOULDER)
LF 1,600.000 $0.400 $1.750 $4.000 $3.000 $6.000 $4.900
MTL W-BEAM GD FEN (TIM POST)
LF 1,050.000 $20.000 $19.400 $24.000 $20.000 $24.000 $18.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $2,850.000 $1,500.000 $1,450.000 $1,800.000 $1,395.000
REMOVE METAL BEAM GUARD FENCE
LF 2,235.000 $4.000 $2.700 $3.300 $2.250 $3.000 $3.270
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $200.000 $135.000 $660.000 $200.000 $250.000 $172.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 4.000 $2,000.000 $2,150.000 $2,500.000 $300.000 $2,400.000 $2,080.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $12,000.000 $9,635.000 $12,000.000 $9,675.000 $12,000.000 $9,180.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,800.000 $1,260.000 $1,800.000 $2,500.000 $3,000.000 $1,225.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $945.000 $1,500.000 $1,000.000 $1,500.000 $915.000
WIRE FENCE (TY C)
LF 3,000.000 $10.000 $8.400 $10.000 $15.000 $15.000 $13.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $525.000 $660.000 $690.000 $800.000 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $700.000 $685.000 $860.000 $850.000 $900.000 $655.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $350.000 $310.000 $380.000 $350.000 $400.000 $300.000
REMOVE SM RD SN SUP&AM
EA 9.000 $100.000 $75.000 $112.000 $150.000 $200.000 $175.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 46.000 $15.000 $15.750 $20.000 $18.000 $25.000 $15.100
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 16.000 $15.000 $15.750 $20.000 $18.000 $25.000 $15.100
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 133.000 $5.000 $9.450 $10.000 $9.000 $10.000 $16.750
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 86.000 $5.000 $9.450 $10.000 $9.000 $10.000 $16.750
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 261.000 $5.000 $7.350 $8.000 $7.000 $8.000 $16.750
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 172.000 $5.000 $7.350 $8.000 $7.000 $8.000 $16.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 64.000 $1.500 $1.220 $1.500 $1.000 $2.000 $2.650
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 42.000 $1.500 $1.800 $1.500 $1.000 $2.000 $2.650
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 77.000 $2.500 $4.200 $5.000 $4.000 $5.000 $6.100
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 7,640.000 $0.750 $0.550 $0.600 $0.500 $0.600 $0.410
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 9,320.000 $0.750 $0.550 $0.600 $0.500 $0.600 $0.410
REFL PAV MRKR TY II-A-A
EA 208.000 $8.000 $5.250 $6.000 $5.000 $6.000 $4.050
ELIM EXT PAV MRK & MRKS (4")
LF 320.000 $0.350 $2.100 $2.500 $2.000 $3.000 $1.030
PAV SURF PREP FOR MRK (4")
LF 16,960.000 $0.250 $0.100 $0.120 $0.100 $0.200 $0.040
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 10,885.000 $5.000 $2.450 $2.200 $3.000 $4.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,000.000 $10,000.000 $15,000.000 $10,000.000 $20,000.000 $19,400.000
Totals: $5,596,387.950 $5,292,158.610 $5,301,790.250 $6,008,069.420 $6,193,493.400 $6,754,697.200