SABINE US0096 (6482-25-001)

Items: 49

County: SABINE
Length: 0.0100 MILES
Highway: US0096
District: LUFKIN
Control Number: 6482-25-001
DBE Goal: N/A
Project: RMC - A00214695
Guaranty: $3,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $154,946.85
Date: 05/21/2025 (1 year ago)
Contract Number: 5251102
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00214695
Project Description: GUARD FENCE, ATTENUATOR & METAL RAIL REPAIR
Mail/Deliver Bids To: N/A
LAUREN PERRY
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$154,946.85
$103,435.00
Over/Under Est: -33.24% -$51,511.85
Over/Under Est: -13.27% -$20,566.85
Amt Left: 29.92% $30,945.00

Bid Items & Bid Tabulations

49 Total 0 of 49
SABINE  |  US0096  |  LUFKIN  |  6482-25-001  |  05/21/2025  |  $154,946.85  |  RMC - A00214695  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACE CONTRACTORS, INC.
AUSTIN BARRICADE COMPANY, L.L.C.
REMOV CONC (CURB)
LF 30.000 $20.000 $1.000 $20.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $50.000 $1.000 $25.000
CONC STR REPAIR (STANDARD)
SF 5.000 $80.000 $100.000 $80.000
RAIL (TY T631)
LF 15.000 $88.000 $50.000 $100.000
RAIL (TY T631LS)
LF 5.000 $200.000 $1.000 $180.000
MOBILIZATION (CALLOUT)
EA 5.000 $1,000.000 $1,500.000 $9,500.000
TMA (STATIONARY)
DAY 30.000 $200.000 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $25.000 $25.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,250.000 $1,250.000 $800.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $800.000 $250.000 $100.000
SHORT RADIUS (28")
LF 25.000 $45.000 $1.000 $1.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $1.000 $200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,450.000 $1.000 $250.000
MTL BM GD FEN TRANS (NON - SYM)
EA 5.000 $490.000 $1.000 $100.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 20.000 $90.000 $1.000 $50.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 40.000 $100.000 $10.000 $1.000
TERMINAL ANCHOR SECTION
EA 5.000 $100.000 $1.000 $1.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $4.000 $4.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $50.000 $1.000 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $200.000 $1.000 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $1,229.090 $1.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,012.500 $2,000.000 $1,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $252.500 $1.000 $500.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 5.000 $2,000.000 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 5.000 $5.000 $10.000 $200.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 5.000 $40.000 $10.000 $1.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 300.000 $40.000 $40.000 $50.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 20.000 $39.600 $1.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 20.000 $75.000 $65.000 $80.000
REPLACE STEEL POST W/O CONC FND
EA 20.000 $57.160 $1.000 $1.000
REPLACE TIMBER POST W/ CONC FND
EA 20.000 $75.000 $50.000 $80.000
REPLACE STEEL POST W/ CONC FND
EA 20.000 $39.310 $1.000 $1.000
REALIGN POSTS
EA 10.000 $30.000 $50.000 $500.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 20.000 $3.000 $1.000 $1.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $25.000 $1.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 5.000 $7,000.000 $6,000.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 5.000 $500.000 $850.000 $500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 50.000 $45.000 $50.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $150.000 $150.000 $100.000
REPLACE BLOCKOUT
EA 25.000 $25.000 $50.000 $200.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $40.000 $75.000 $50.000
RESET SGT IMPACT HEAD
EA 5.000 $200.000 $250.000 $300.000
REPLACE SGT OBJECT MARKER
EA 5.000 $30.000 $35.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $90.000 $1.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $60.000 $100.000 $1.000
REPLACE SGT STRUT
EA 5.000 $100.000 $1.000 $1.000
REPAIR (WIDE QUAD)
LF 5.000 $600.000 $2,000.000 $200.000
REPAIR (T101RC)
LF 25.000 $30.000 $60.000 $50.000
REPAIR (T6)
LF 25.000 $50.000 $1.000 $20.000
Totals: $154,946.850 $103,435.000 $134,380.000