Show Job Controls
Bid Cobra

SABINE US0096 (6466-61-001)

Items: 48

County: SABINE
Length: N/A
Highway: US0096
District: LUFKIN
Control Number: 6466-61-001
DBE Goal: 0.0%
Project: RMC - 646661001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $197,225.00
Date: 05/29/2024 (2 years ago) Changed
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
JEREMY KING
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$197,225.00
Over/Under Est: -28.61% -$56,427.00
Over/Under Est: -25.37% -$50,029.85
Amt Left: 4.54% $6,397.15
Over/Under Est: 9.34% $18,430.00
Amt Left: 53.17% $74,857.00
Delta: -46.51% -$68,459.85

Bid Items & Bid Tabulations

48 Total 0 of 48
SABINE  |  US0096  |  LUFKIN  |  6466-61-001  |  05/29/2024  |  $197,225.00  |  RMC - 646661001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
ACE CONTRACTORS, INC.
HAZMAT INTERNATIONAL, INC.
REMOVING CONC (CURB)
LF 30.000 $10.000 $20.000 $1.000 $1.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $200.000 $50.000 $25.000 $50.000
CONC STR REPAIR (STANDARD)
SF 5.000 $200.000 $80.000 $100.000 $500.000
RAIL (TY T631)
LF 15.000 $97.000 $88.000 $75.000 $120.000
RAIL (TY T631LS)
LF 5.000 $76.000 $200.000 $1.000 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $45.000 $25.000 $35.000 $30.000
TERMINAL ANCHOR SECTION
EA 5.000 $357.500 $1.000 $50.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,350.000 $1,200.000 $1,750.000 $500.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $1,000.000 $800.000 $1,000.000 $1,200.000
SHORT RADIUS
LF 25.000 $75.000 $45.000 $1.000 $55.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $975.000 $150.000 $1.000 $600.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,500.000 $1,450.000 $750.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 40.000 $50.000 $35.000 $35.000 $30.000
MTL BM GD FEN TRANS (NON - SYM)
EA 5.000 $1,000.000 $800.000 $1.000 $700.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 20.000 $110.000 $86.000 $1.000 $160.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $4.000 $5.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $500.000 $1.000 $1.000 $25.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $500.000 $50.000 $1.000 $100.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $1,000.000 $60.000 $1.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $5,000.000 $1,500.000 $4,250.000 $4,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $1,250.000 $500.000 $25.000 $1,000.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 5.000 $4,500.000 $1.000 $3,000.000 $300.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 5.000 $25.000 $30.000 $10.000 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 5.000 $85.000 $25.000 $25.000 $60.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 300.000 $20.000 $33.000 $40.000 $28.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $38.000 $1.000 $5.000 $75.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 20.000 $55.000 $50.000 $75.000 $75.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 20.000 $75.000 $50.000 $80.000 $75.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $150.000 $155.000 $100.000 $50.000
REALIGN POSTS
EA 10.000 $18.000 $88.000 $50.000 $40.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 10.000 $30.000 $99.000 $5.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 5.000 $50.000 $150.000 $35.000 $300.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 50.000 $50.000 $38.000 $100.000 $80.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $100.000 $80.000 $125.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 20.000 $30.000 $1.000 $1.000 $25.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $100.000 $1.000 $1.000 $365.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $4,500.000 $6,248.000 $6,000.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 5.000 $2,500.000 $500.000 $850.000 $1,500.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $150.000 $200.000 $200.000 $1,300.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $100.000 $1.000 $0.010 $100.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $100.000 $1.000 $0.010 $100.000
REPLACE SGT STRUT
EA 5.000 $77.500 $1.000 $0.010 $100.000
REPLACE SGT OBJECT MARKER
EA 5.000 $30.000 $20.000 $25.000 $25.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 25.000 $3.000 $29.000 $10.000 $25.000
REPAIR (WIDE QUAD)
EA 5.000 $1,200.000 $1,000.000 $2,500.000 $4,000.000
REMOVE AND REPLACE (VIA -STEEL BARRELS)
EA 25.000 $50.000 $50.000 $1.000 $2,000.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 25.000 $50.000 $50.000 $1.000 $1.000
TMA (STATIONARY)
DAY 6.000 $500.000 $4,893.000 $1,250.000 $1,000.000
Totals: $197,225.000 $140,798.000 $147,195.150 $215,655.000