Show Job Controls
Bid Cobra

SABINE FM 83 (0694-01-031)

Items: 57

County: SABINE
Length: N/A
Highway: FM 83
District: LUFKIN
Control Number: 0694-01-031
DBE Goal: N/A
Project: BR 2021(560)
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $931,926.00
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$931,926.00
Over/Under Est: 17.51% $163,220.50
$1,358,422.00
Over/Under Est: 45.77% $426,496.00
Amt Left: 24.04% $263,275.50
$1,447,045.45
Over/Under Est: 55.27% $515,119.45
Amt Left: 32.13% $351,898.95
Delta: -6.52% -$88,623.45
Over/Under Est: 75.46% $703,192.60
Amt Left: 49.31% $539,972.10
Delta: -13.00% -$188,073.15

Bid Items & Bid Tabulations

57 Total 0 of 57
SABINE  |  FM 83  |  LUFKIN  |  0694-01-031  |  05/06/2021  |  $931,926.00  |  BR 2021(560)  |  BRIDGE MAINT  |  114 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
CEKRA INC.
RESTEK, INC.
SCR CIVIL CONSTRUCTION, LLC
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 75.000 $35.000 $5.000 $10.000 $50.000 $177.000
BLOCK SODDING
SY 1,050.000 $5.000 $7.000 $3.000 $7.850 $7.300
VEGETATIVE WATERING
MG 21.000 $20.000 $100.000 $11.000 $39.000 $115.000
CEM STABIL BKFL
CY 16.000 $200.000 $300.000 $800.000 $570.000 $715.000
FLOWABLE BACKFILL
CY 5.000 $300.000 $300.000 $500.000 $845.000 $715.000
APPROACH SLAB
CY 75.800 $450.000 $560.000 $800.000 $650.000 $976.000
EPOXY WATERPROOF FINISH
SF 720.000 $13.000 $13.000 $6.000 $35.000 $11.400
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 210.000 $250.000 $170.000 $1,000.000 $255.000 $270.400
CONC STR REP (REMOVE AND REPL BM END)
CY 0.400 $30,000.000 $10,000.000 $20,000.000 $110,000.000 $53,000.000
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 112.000 $135.000 $420.000 $350.000 $255.000 $123.000
RIPRAP (CONC)(5 IN)
CY 3.000 $1,000.000 $600.000 $500.000 $2,135.000 $2,600.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 320.000 $200.000 $150.000 $100.000 $230.000 $242.000
CLEANING AND SEALING EXISTING JOINTS
LF 455.000 $35.000 $50.000 $80.000 $50.000 $70.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 88.000 $20.000 $25.000 $80.000 $22.000 $50.000
RESIZING AND SEALING JOINTS
LF 237.000 $5.000 $32.000 $80.000 $27.000 $58.000
MULTI-LAYER POLYMER OVERLAY
SY 1,179.000 $45.000 $65.000 $55.000 $50.000 $65.000
CLEAN & PAINT EXIST PILING (SYSTEM I-B)
LS 1.000 $6,000.000 $35,000.000 $50,000.000 $33,500.000 $27,000.000
RETROFIT RAIL (TY T131RC)
LF 187.000 $200.000 $200.000 $400.000 $260.000 $488.000
SHOT BLASTING
SY 1,179.000 $6.000 $5.000 $8.000 $20.000 $10.600
RAISING EXIST STRUCT
LS 1.000 $20,000.000 $50,000.000 $50,000.000 $123,000.000 $26,550.000
REMOV STR (APPROACH SLAB)
EA 2.000 $3,000.000 $17,500.000 $10,000.000 $12,500.000 $12,950.000
MOBILIZATION
LS 1.000 $76,000.000 $95,000.000 $120,000.000 $335,000.000 $158,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $300.000 $8,000.000 $5,100.000 $3,600.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 468.000 $25.000 $33.000 $25.000 $35.000 $33.500
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $9.000 $12.000 $5.000 $11.500 $11.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 900.000 $4.000 $4.000 $5.000 $3.750 $3.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 900.000 $2.000 $1.500 $1.000 $1.250 $1.150
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 370.000 $60.000 $72.000 $100.000 $78.000 $64.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 370.000 $10.000 $62.000 $25.000 $40.000 $64.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 370.000 $7.000 $10.000 $25.000 $30.000 $64.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,750.000 $23.000 $23.000 $25.000 $25.750 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,800.000 $1,700.000 $2,500.000 $1,850.000 $2,045.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $3.000 $3.500 $10.000 $1.150 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $170.000 $150.000 $500.000 $210.000 $140.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,000.000 $2,700.000 $2,500.000 $3,225.000 $2,900.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,000.000 $500.000 $2,500.000 $1,690.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,000.000 $200.000 $2,500.000 $845.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $9,000.000 $22,000.000 $10,250.000 $8,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $25.000 $26.000 $25.000 $25.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 11.000 $30.000 $26.000 $20.000 $36.000 $30.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 3,200.000 $2.000 $3.500 $1.000 $3.750 $3.350
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 3,200.000 $2.000 $3.500 $1.000 $3.750 $3.350
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $10.000 $11.000 $10.000 $12.000 $11.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 68.000 $2.000 $6.000 $1.000 $4.000 $3.350
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 68.000 $2.000 $6.000 $1.000 $4.000 $3.350
REFL PAV MRK TY II (W) 4" (SLD)
LF 570.000 $1.000 $6.000 $1.000 $6.000 $5.600
REFL PAV MRK TY II (Y) 4" (SLD)
LF 70.000 $1.000 $21.000 $1.000 $6.000 $5.600
PAVEMENT SEALER 4"
LF 640.000 $1.000 $6.000 $1.000 $6.000 $4.600
REFL PAV MRKR TY II-A-A
EA 4.000 $3.000 $2.000 $3.000 $25.000 $22.350
ELIM EXT PAV MRK & MRKS (4")
LF 96.000 $1.000 $6.000 $1.000 $6.000 $5.600
PAV SURF PREP FOR MRK (4")
LF 640.000 $1.000 $6.000 $1.000 $6.000 $5.600
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
LF 37.000 $60.000 $20.000 $100.000 $10.850 $22.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 32.800 $600.000 $135.000 $1,000.000 $375.000 $960.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 847.000 $120.000 $300.000 $60.000 $125.000 $555.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $2,650.000 $10,000.000 $2,500.000 $10,300.000
TMA (STATIONARY)
DAY 34.000 $500.000 $230.000 $500.000 $270.000 $360.000
TMA (MOBILE OPERATION)
DAY 2.000 $1,000.000 $32.750 $500.000 $750.000 $1,022.000
Totals: $931,926.000 $1,095,146.500 $1,358,422.000 $1,447,045.450 $1,635,118.600