PREPARING ROW
|
STA
|
57.020
|
$3,500.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
346.000
|
$80.000
|
$25.000
|
$50.000
|
$30.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,762.000
|
$30.000
|
$30.000
|
$55.000
|
$25.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
45.200
|
$50.000
|
$100.000
|
$150.000
|
$50.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,181.000
|
$10.000
|
$10.000
|
$22.000
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
4,532.000
|
$10.000
|
$15.000
|
$12.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,832.000
|
$25.000
|
$25.000
|
$20.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
5,173.000
|
$25.000
|
$30.000
|
$25.000
|
$25.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
25.000
|
$60.000
|
$50.000
|
$100.000
|
$200.000
|
|
|
BLADING
|
STA
|
206.080
|
$300.000
|
$350.000
|
$320.000
|
$400.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,260.000
|
$6.000
|
$4.000
|
$5.000
|
$3.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
24,384.000
|
$0.200
|
$0.660
|
$0.140
|
$0.250
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
48,768.000
|
$0.800
|
$0.750
|
$0.650
|
$0.650
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
24,384.000
|
$1.000
|
$0.250
|
$0.610
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
24,384.000
|
$1.000
|
$0.250
|
$0.610
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
1,341.000
|
$20.000
|
$10.000
|
$42.000
|
$15.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
4,532.000
|
$30.000
|
$55.000
|
$39.000
|
$55.000
|
|
|
REWORK BS MTL (TY B) (8") (ORD COMP)
|
SY
|
104,178.000
|
$9.000
|
$5.000
|
$6.000
|
$20.000
|
|
|
REWORK BS MTL (TY B) (12")(ORD COMP)
|
SY
|
6,964.000
|
$10.000
|
$3.500
|
$9.000
|
$30.000
|
|
|
CEMENT
|
TON
|
4,034.000
|
$285.000
|
$235.000
|
$340.000
|
$350.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
4,532.000
|
$5.750
|
$4.250
|
$6.000
|
$5.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
111,491.000
|
$5.750
|
$4.750
|
$5.000
|
$5.000
|
|
|
CEMENT TREAT (SUBGRADE)(10")
|
SY
|
108,086.000
|
$6.000
|
$4.750
|
$5.500
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
2,688.000
|
$8.000
|
$6.000
|
$6.900
|
$10.000
|
|
|
ASPH (RC-250)
|
GAL
|
21,211.000
|
$6.500
|
$6.500
|
$5.750
|
$10.000
|
|
|
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
|
CY
|
874.000
|
$190.000
|
$220.000
|
$240.000
|
$165.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
85,406.000
|
$5.500
|
$5.500
|
$6.000
|
$6.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
922.000
|
$190.000
|
$180.000
|
$245.000
|
$175.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
816.000
|
$250.000
|
$250.000
|
$225.000
|
$165.000
|
|
|
CEM STABIL BKFL
|
CY
|
120.000
|
$300.000
|
$280.000
|
$300.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.000
|
$1,000.000
|
$1,000.000
|
$3,000.000
|
$6,000.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
300.000
|
$300.000
|
$280.000
|
$475.000
|
$425.000
|
|
|
CL C CONC (ABUT)
|
CY
|
51.400
|
$1,350.000
|
$1,500.000
|
$1,200.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
3,780.000
|
$25.000
|
$35.000
|
$38.000
|
$40.000
|
|
|
APPROACH SLAB
|
CY
|
64.200
|
$800.000
|
$750.000
|
$1,100.000
|
$900.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
447.500
|
$225.000
|
$280.000
|
$350.000
|
$300.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
2,792.000
|
$25.000
|
$12.000
|
$20.000
|
$15.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
5.000
|
$1,200.000
|
$1,000.000
|
$6,000.000
|
$5,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
70.100
|
$900.000
|
$750.000
|
$650.000
|
$1,000.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
3,010.000
|
$180.000
|
$170.000
|
$200.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
173.000
|
$900.000
|
$550.000
|
$675.000
|
$700.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
440.000
|
$100.000
|
$75.000
|
$87.000
|
$55.000
|
|
|
RAIL (TY T551)
|
LF
|
220.000
|
$150.000
|
$180.000
|
$165.000
|
$165.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
506.000
|
$130.000
|
$110.000
|
$150.000
|
$125.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
82.000
|
$185.000
|
$75.000
|
$275.000
|
$250.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$120,000.000
|
$15,000.000
|
$100,000.000
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$880,000.000
|
$1,500,000.000
|
$1,000,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$10,000.000
|
$10,000.000
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,230.000
|
$30.000
|
$45.000
|
$40.000
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$40.000
|
$100.000
|
$40.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,290.000
|
$10.000
|
$10.000
|
$20.000
|
$12.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
200.000
|
$40.000
|
$100.000
|
$50.000
|
$30.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
45.000
|
$125.000
|
$100.000
|
$150.000
|
$125.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
25,720.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
25,720.000
|
$1.000
|
$1.000
|
$1.500
|
$0.650
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
30.000
|
$150.000
|
$200.000
|
$175.000
|
$200.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
8,100.000
|
$32.000
|
$29.000
|
$35.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,000.000
|
$2,800.000
|
$2,300.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,550.000
|
$5.000
|
$4.000
|
$3.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,400.000
|
$3,250.000
|
$3,600.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$300.000
|
$350.000
|
$275.000
|
$230.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,500.000
|
$1,500.000
|
$1,050.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$130.000
|
$100.000
|
$420.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$25.000
|
$45.000
|
$27.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
106.000
|
$30.000
|
$31.000
|
$33.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
51,961.000
|
$1.500
|
$0.420
|
$0.600
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
1,520.000
|
$1.500
|
$0.470
|
$1.300
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
44,757.000
|
$1.500
|
$0.420
|
$0.600
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,218.000
|
$2.000
|
$1.000
|
$2.000
|
$2.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,507.000
|
$1.000
|
$1.000
|
$0.600
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,583.000
|
$1.200
|
$1.150
|
$1.300
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
90.000
|
$1.200
|
$3.000
|
$5.500
|
$6.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,300.000
|
$1.200
|
$1.150
|
$1.300
|
$1.100
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
48,378.000
|
$1.500
|
$1.150
|
$1.300
|
$1.100
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,430.000
|
$1.500
|
$3.000
|
$2.200
|
$3.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
41,457.000
|
$1.500
|
$1.150
|
$1.300
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
636.000
|
$4.500
|
$6.000
|
$4.400
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,987.000
|
$1.200
|
$4.000
|
$1.300
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,507.000
|
$0.600
|
$1.000
|
$0.600
|
$0.300
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
3,064.000
|
$200.000
|
$180.000
|
$185.000
|
$190.000
|
|
|
TACK COAT
|
GAL
|
1,393.000
|
$10.000
|
$6.000
|
$6.950
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
910.000
|
$110.000
|
$200.000
|
$150.000
|
$200.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
145.000
|
$15.000
|
$20.000
|
$25.000
|
$12.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$1,000.000
|
$200.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$300.000
|
$1,000.000
|
$475.000
|
$1,000.000
|
|
Totals: |
$9,677,750.150
|
$9,612,238.350
|
$10,294,942.940
|
$12,405,854.350
|