Show Job Controls
Bid Cobra

RUSK FM 348 (1669-01-007)

Items: 56

County: RUSK
Length: N/A
Highway: FM 348
District: TYLER
Control Number: 1669-01-007
DBE Goal: N/A
Project: BR 2023(731)
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $1,629,859.62
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,629,859.62
$1,892,089.55
Over/Under Est: 16.09% $262,229.93
Over/Under Est: 17.87% $291,242.43
Amt Left: 1.53% $29,012.50
Over/Under Est: 24.08% $392,523.93
Amt Left: 6.89% $130,294.00
Delta: -5.27% -$101,281.50
Over/Under Est: 33.72% $549,625.38
Amt Left: 15.19% $287,395.45
Delta: -7.77% -$157,101.45
Subcontractor Percentage Amount
REYNOLDS & KAY, LTD. 15.34% $295,216.65
M & D FOUNDATION DRILLING INDUSTRIES, INC. 6.64% $127,786.08
DUSTIN ALLEN, INC. 3.23% $62,161.00
J. H. ODEN CONTRACTING COMPANY 1.97% $37,912.44
MORRIS COUNTY CONTRACTORS, L.L.C. 1.89% $36,372.85
FLEX SUPPLY, LLC 0.64% $12,316.73
STRIPING TECHNOLOGY, L.P. 0.53% $10,199.79
HOUSTON SAWING & DRILLING 0.29% $5,581.02
Total: 30.53% $587,546.56

Bid Items & Bid Tabulations

56 Total 0 of 56
RUSK  |  FM 348  |  TYLER  |  1669-01-007  |  05/05/2023  |  $1,629,859.62  |  BR 2023(731)  |  BRIDGE REPL  |  114 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRUE ROADS CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
CROSS PLUS CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 11.320 $2,900.000 $1,800.000 $5,000.000 $1,100.000 $5,300.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 2,027.000 $8.000 $14.000 $10.000 $5.500 $15.000
EXCAVATION (ROADWAY)
CY 130.000 $25.000 $40.000 $25.000 $55.000 $30.000
EXCAVATION (CHANNEL)
CY 786.000 $35.000 $27.000 $25.000 $55.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,188.000 $40.000 $20.000 $25.000 $38.500 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,543.000 $4.000 $6.000 $5.000 $5.500 $4.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 2,543.000 $0.700 $1.150 $1.750 $2.200 $2.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 1,272.000 $0.700 $1.150 $1.200 $2.200 $2.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 1,272.000 $0.700 $1.150 $1.200 $2.200 $2.000
VEGETATIVE WATERING
MG 56.000 $15.000 $30.000 $5.000 $110.000 $1.000
CEMENT
TON 35.000 $240.000 $330.000 $400.000 $550.000 $350.000
CEMENT TREAT (EXIST MATL) (6")
SY 2,633.000 $13.000 $16.000 $6.000 $27.500 $12.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 1,679.000 $8.000 $9.000 $10.000 $11.000 $10.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 40.000 $140.000 $375.000 $330.000 $110.000 $800.000
PLANE ASPH CONC PAV(0" TO 2")
SY 594.000 $5.250 $22.000 $12.000 $55.000 $20.000
CEM STABIL BKFL
CY 100.000 $220.000 $350.000 $275.000 $55.000 $300.000
DRILL SHAFT (30 IN)
LF 578.000 $300.000 $300.000 $390.000 $330.000 $310.000
CL C CONC (ABUT)
CY 69.500 $1,350.000 $1,350.000 $1,325.000 $825.000 $1,500.000
REINF CONC SLAB (BOX BEAM)
SF 4,460.000 $15.000 $30.000 $28.000 $33.000 $28.000
APPROACH SLAB
CY 56.500 $700.000 $800.000 $750.000 $1,100.000 $1,000.000
PRESTR CONC BOX BEAM (4B20)
LF 178.500 $275.000 $390.000 $350.000 $330.000 $450.000
PRESTR CONC BOX BEAM (5B20)
LF 536.000 $330.000 $390.000 $360.000 $330.000 $450.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 772.000 $160.000 $220.000 $215.000 $192.500 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 60.000 $550.000 $680.000 $650.000 $550.000 $600.000
RAIL (TY T223)
LF 300.000 $160.000 $125.000 $150.000 $220.000 $180.000
ARMOR JOINT (SEALED)
LF 133.000 $180.000 $150.000 $175.000 $55.000 $200.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $28,000.000 $25,000.000 $15,000.000 $27,500.000 $60,000.000
MOBILIZATION
LS 1.000 $157,399.620 $158,000.000 $165,000.000 $220,000.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,500.000 $2,000.000 $5,000.000 $5,500.000 $26,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 208.000 $35.000 $43.000 $37.000 $27.500 $1.000
ROCK FILTER DAMS (REMOVE)
LF 208.000 $10.000 $12.000 $10.000 $5.500 $1.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 20.000 $50.000 $30.000 $100.000 $550.000 $1.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000 $75.000 $125.000 $125.000 $275.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,460.000 $3.500 $4.000 $3.300 $16.500 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,460.000 $1.000 $0.550 $1.000 $5.500 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000 $125.000 $125.000 $150.000 $275.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 550.000 $35.000 $33.000 $32.000 $44.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,500.000 $2,400.000 $2,300.000 $2,750.000 $2,250.000
REMOVE METAL BEAM GUARD FENCE
LF 625.000 $8.000 $3.500 $2.500 $1.100 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,200.000 $3,500.000 $3,300.000 $4,400.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $400.000 $345.000 $220.000 $550.000 $500.000
WIRE FENCE (TY C)
LF 126.000 $40.000 $24.000 $40.000 $11.000 $25.000
WIRE FENCE (WATER GAP)
LF 92.000 $80.000 $92.000 $75.000 $55.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $20.000 $27.000 $25.000 $5.500 $30.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $20.000 $115.000 $30.000 $1.100 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $25.000 $37.000 $30.000 $55.000 $30.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 400.000 $1.000 $2.300 $2.200 $4.400 $2.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 25.000 $1.000 $2.300 $2.200 $4.400 $2.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 200.000 $1.250 $2.300 $2.200 $4.400 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,264.000 $0.500 $2.600 $2.500 $4.400 $2.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 129.000 $0.500 $5.750 $6.000 $6.050 $5.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,236.000 $0.600 $2.600 $2.500 $4.400 $2.000
REFL PAV MRKR TY II-A-A
EA 17.000 $4.000 $28.750 $30.000 $4.400 $10.000
SP MIXES SP-B PG64-22
TON 860.000 $130.000 $200.000 $220.000 $165.000 $200.000
SP MIXES SP-C SAC-A PG70-22
TON 440.000 $150.000 $212.000 $200.000 $165.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 120.000 $120.000 $140.000 $150.000 $110.000 $100.000
Totals: $1,629,859.620 $1,892,089.550 $1,921,102.050 $2,022,383.550 $2,179,485.000