Show Job Controls
Bid Cobra

RUSK FM 3231 (0424-10-009)

Items: 113

County: RUSK
Length: N/A
Highway: FM 3231
District: TYLER
Control Number: 0424-10-009
DBE Goal: N/A
Project: CC 424-10-9
Guaranty: N/A
Time: 230 WORKING DAYS
Engineer's Estimate: $14,016,829.35
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$14,016,829.35
$15,996,365.90
Over/Under Est: 14.12% $1,979,536.55
Over/Under Est: 16.97% $2,378,684.53
Amt Left: 2.5% $399,147.98
$19,279,397.45
Over/Under Est: 37.54% $5,262,568.10
Amt Left: 20.52% $3,283,031.55
Delta: -17.59% -$2,883,883.57
Subcontractor Percentage Amount
J.C. JOHNSON CONSTRUCTION 5.21% $847,217.53
ODUM SERVICES, LLC 4.17% $678,099.25
ISAACS CONSTRUCTION SERVICES LLC 1.72% $279,695.61
STRIPING TECHNOLOGY, L.P. 1.69% $274,817.20
TEXOP CONSTRUCTION 0.73% $118,708.02
SOUTHWEST ENVIRONMENT SERVICES LLC 0.50% $81,306.86
PANOLA SIGN & BARRICADE, INC. 0.33% $53,662.53
SACE SERVICES, LLC 0.07% $11,382.96
Total: 14.42% $2,344,889.96

Bid Items & Bid Tabulations

113 Total 0 of 113
RUSK  |  FM 3231  |  TYLER  |  0424-10-009  |  06/02/2023  |  $14,016,829.35  |  CC 424-10-9  |  REHAB EXIST ROADWAY  |  230 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L. S. EQUIPMENT CO., INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
EAST TEXAS BRIDGE, INC.
PREPARING ROW
AC 0.360 $50,000.000 $10,000.000 $15,000.000 $30,000.000
PREPARING ROW
STA 303.100 $2,000.000 $1,600.000 $1,800.000 $4,000.000
REMOVING CONC (RIPRAP)
SY 40.200 $50.000 $50.000 $42.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 41.000 $30.000 $20.000 $93.000 $30.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 48,417.000 $8.000 $2.500 $12.000 $6.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,933.000 $8.000 $2.000 $29.000 $6.000
REMOVING STAB BASE AND ASPH PAV (4"-8")
SY 2,906.000 $10.000 $6.000 $22.000 $10.000
EXCAVATION (ROADWAY)
CY 5,565.000 $25.000 $25.000 $29.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,978.000 $35.000 $15.000 $43.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 833.000 $60.000 $20.000 $35.000 $30.000
BLADING
STA 136.000 $200.000 $150.000 $380.000 $300.000
FURNISHING AND PLACING TOPSOIL (4")
SY 36,329.000 $3.000 $1.500 $4.650 $3.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 18,166.000 $0.200 $0.250 $0.120 $0.200
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 36,329.000 $0.800 $0.750 $0.610 $0.650
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 18,166.000 $1.000 $0.750 $0.570 $0.650
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 18,166.000 $1.000 $0.750 $0.550 $0.250
VEGETATIVE WATERING
MG 999.000 $10.000 $0.010 $1.000 $25.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 150,799.000 $20.000 $28.840 $29.000 $45.000
REWORK BS MTL (TY C)(12")(ORD COMP)
SY 88,477.000 $5.000 $9.000 $7.500 $9.000
CEMENT
TON 2,873.000 $270.000 $250.000 $268.000 $325.000
CEMENT TREAT (EXIST MATL) (10")
SY 159,633.000 $4.750 $6.000 $5.750 $5.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 5,166.000 $8.000 $8.000 $7.000 $7.000
ASPH (RC-250)
GAL 29,730.000 $7.000 $7.000 $6.000 $6.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 118,631.000 $6.500 $6.000 $4.500 $4.500
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,370.000 $180.000 $190.000 $225.000 $165.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 1,229.000 $180.000 $190.000 $205.000 $165.000
AGGR (TY-PD GR-5 OR TY-PL GR-5)
CY 1,143.000 $300.000 $250.000 $210.000 $165.000
PLANE ASPH CONC PAV(1/2" TO 1-1/2")
SY 2,075.000 $5.000 $8.000 $14.000 $15.000
CUT & RESTORING PAV
SY 62.800 $200.000 $350.000 $236.000 $150.000
FLOWABLE BACKFILL
CY 99.400 $400.000 $500.000 $590.000 $1,000.000
TRENCH EXCAVATION PROTECTION
LF 141.000 $10.000 $10.000 $16.000 $30.000
CL C CONC (COLLAR)
EA 11.000 $2,000.000 $3,200.000 $2,600.000 $1,500.000
CL C CONC(PILE ENCASEMENT)
LF 64.000 $1,200.000 $2,500.000 $1,600.000 $2,500.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 3,295.000 $20.000 $30.000 $25.000 $15.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 8.000 $300.000 $1,500.000 $1,100.000 $500.000
RIPRAP (CONC)(5 IN)
CY 22.200 $850.000 $1,200.000 $945.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 26.000 $250.000 $250.000 $158.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 987.100 $630.000 $1,200.000 $945.000 $800.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 580.000 $50.000 $50.000 $53.000 $65.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 212.000 $100.000 $75.000 $63.000 $65.000
RETROFIT RAIL (ADD HSS)
LF 1,228.000 $150.000 $175.000 $184.000 $160.000
CONC BOX CULV (5 FT X 3 FT)
LF 58.000 $450.000 $1,000.000 $900.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 1,334.000 $65.000 $75.000 $70.000 $70.000
RC PIPE (CL III)(24 IN)
LF 288.000 $100.000 $190.000 $155.000 $90.000
RC PIPE (CL III)(30 IN)
LF 92.000 $175.000 $225.000 $200.000 $140.000
RC PIPE (CL III)(36 IN)
LF 68.000 $200.000 $250.000 $240.000 $200.000
RC PIPE (CL III)(42 IN)
LF 32.000 $225.000 $450.000 $375.000 $300.000
RC PIPE (CL III)(48 IN)
LF 20.000 $250.000 $600.000 $475.000 $400.000
RC PIPE (CL III)(72 IN)
LF 72.000 $500.000 $750.000 $555.000 $800.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 3.000 $10,000.000 $12,000.000 $11,000.000 $15,000.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $10,000.000 $10,000.000 $9,000.000 $15,000.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 2.000 $15,000.000 $15,000.000 $14,000.000 $25,000.000
HEADWALL (CH - PW - S) (DIA= 72 IN)
EA 2.000 $17,500.000 $32,000.000 $27,500.000 $45,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $14,000.000 $12,000.000 $10,000.000 $10,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,200.000 $950.000 $1,000.000 $600.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 78.000 $1,000.000 $975.000 $1,050.000 $800.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $1,800.000 $2,000.000 $1,260.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,400.000 $2,500.000 $2,100.000 $1,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $3,000.000 $5,000.000 $3,150.000 $2,200.000
CLEAN EXIST CULVERTS
EA 2.000 $1,500.000 $1,500.000 $2,600.000 $2,000.000
REMOV STR (PIPE)
EA 51.000 $500.000 $1,200.000 $1,600.000 $500.000
MOBILIZATION
LS 1.000 $1,275,000.000 $990,000.000 $1,300,000.000 $1,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $4,000.000 $35,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 2,775.000 $30.000 $50.000 $29.500 $37.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $35.000 $50.000 $36.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 2,835.000 $10.000 $12.000 $11.500 $9.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 540.000 $40.000 $75.000 $39.000 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 300.000 $110.000 $200.000 $280.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 56,210.000 $3.150 $3.500 $3.100 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 56,210.000 $1.000 $1.000 $0.650 $0.250
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 60.000 $150.000 $200.000 $310.000 $125.000
INTERSECTIONS (ACP)
SY 2,001.000 $100.000 $75.000 $53.000 $85.000
DRIVEWAYS (ACP)
SY 1,700.000 $100.000 $75.000 $63.000 $80.000
DRIVEWAYS (BASE)
SY 892.000 $100.000 $75.000 $72.000 $50.000
DRIVEWAYS (CONC) (HES)
SY 40.000 $150.000 $250.000 $210.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 16,087.500 $25.000 $29.000 $23.100 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 24.000 $2,000.000 $2,500.000 $3,250.000 $2,200.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 24.000 $1,000.000 $1,000.000 $895.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 15,736.000 $3.000 $7.000 $2.100 $3.500
RM MTL BM GD FEN TRANS (T101)
EA 24.000 $250.000 $300.000 $110.000 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 63.000 $3,400.000 $5,000.000 $2,900.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 60.000 $275.000 $600.000 $210.000 $230.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $20,000.000 $35,000.000 $37,000.000 $33,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $400.000 $500.000 $352.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 56.000 $750.000 $750.000 $653.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $800.000 $1,000.000 $720.000 $900.000
REMOVE SM RD SN SUP&AM
EA 57.000 $130.000 $150.000 $185.000 $120.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 46.000 $30.000 $75.000 $58.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 281.000 $30.000 $50.000 $26.000 $25.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 46.000 $70.000 $100.000 $73.000 $70.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 102,298.000 $1.500 $0.750 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 48.000 $5.000 $6.000 $5.250 $6.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,220.000 $1.500 $0.750 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 78,740.000 $1.500 $0.750 $0.550 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 10,414.000 $2.000 $1.000 $2.900 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 48.000 $8.000 $10.000 $7.350 $8.000
PAVEMENT SEALER 6"
LF 1,049.000 $1.000 $2.000 $1.050 $1.100
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 8,132.000 $1.200 $2.000 $1.050 $1.100
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 510.000 $1.200 $4.000 $2.100 $2.200
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,557.000 $1.200 $2.000 $1.050 $1.100
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 93,218.000 $1.200 $1.250 $0.950 $1.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 4,210.000 $1.600 $2.000 $1.200 $1.300
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 72,047.000 $1.200 $1.250 $0.950 $1.000
REFL PAV MRKR TY I-A
EA 128.000 $5.000 $8.000 $5.250 $6.000
REFL PAV MRKR TY II-A-A
EA 1,205.000 $4.500 $6.000 $4.200 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 408.000 $1.200 $4.000 $2.100 $3.000
PAV SURF PREP FOR MRK (6")
LF 1,049.000 $0.200 $1.250 $1.050 $1.200
SP MIXES SP-C PG64-22
TON 1,279.000 $190.000 $200.000 $215.000 $200.000
TACK COAT
GAL 291.000 $5.000 $8.000 $10.000 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $20,000.000 $15,000.000 $16,500.000 $40,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 555.000 $15.000 $20.000 $10.500 $12.000
TMA (STATIONARY)
DAY 220.000 $300.000 $250.000 $245.000 $300.000
TMA (MOBILE OPERATION)
DAY 15.000 $300.000 $600.000 $55.000 $300.000
Totals: $14,016,829.350 $15,996,365.900 $16,395,513.880 $19,279,397.450