RUSK US 79 (0246-01-036)

Items: 70

County: RUSK
Length: N/A
Highway: US 79
District: TYLER
Control Number: 0246-01-036
DBE Goal: N/A
Project: STP 1902(169)
Guaranty: N/A
Time: 145 WORKING DAYS
Engineer's Estimate: $6,188,566.38
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: PLN,SPRPV BS,OCST,PFC SURF,BRG RAIL,MBGF,PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$6,188,566.38
$6,403,500.83
Over/Under Est: 3.47% $214,934.45
Over/Under Est: 7.17% $443,686.38
Amt Left: 3.57% $228,751.93

Bid Items & Bid Tabulations

70 Total 0 of 70
RUSK  |  US 79  |  TYLER  |  0246-01-036  |  08/06/2019  |  $6,188,566.38  |  STP 1902(169)  |  PLN,SPRPV BS,OCST,PFC SURF,BRG RAIL,...  |  145 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 306.000 $33.000 $25.000 $20.000
BACKFILL (TY A)
STA 333.740 $300.000 $500.000 $150.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,380.000 $1.250 $5.000 $2.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 45,880.000 $0.800 $0.750 $0.770
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 22,940.000 $1.250 $0.700 $0.720
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 22,940.000 $1.250 $0.680 $0.700
VEGETATIVE WATERING
MG 1,009.000 $12.500 $10.000 $12.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 70,321.000 $3.250 $2.900 $3.120
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,674.000 $120.000 $152.000 $95.000
PFC (ASPHALT) PG76-22
TON 705.000 $140.000 $130.000 $142.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 11,050.000 $140.000 $130.000 $142.000
SUPERPAVE MIXTURES SP-C PG70-22
TON 16,263.000 $90.000 $110.000 $110.000
SUPERPAVE MIXTURES SP-D PG64-22(LEV-UP)
TON 10,024.000 $90.000 $99.500 $108.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,000.000 $50.000 $40.000 $50.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,050.000 $2.000 $4.250 $4.000
PLANE ASPH CONC PAV(0" TO 4")
SY 3,734.000 $2.750 $4.250 $4.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,822.000 $3.000 $2.000 $4.000
PLANE ASPH CONC PAV (4")
SY 74,354.000 $2.750 $3.500 $4.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 1.400 $2,500.000 $2,900.000 $8,000.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 132.000 $150.000 $134.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 110.000 $500.000 $490.000 $450.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 368.000 $35.000 $28.000 $38.000
RETROFIT RAIL (TY T223)
LF 440.800 $200.000 $129.000 $200.000
CLEAN EXIST CULVERTS
EA 1.000 $1,600.000 $10,000.000 $2,000.000
MOBILIZATION
LS 1.000 $555,000.000 $375,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,000.000 $2,000.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $30.000 $34.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $7.500 $10.000 $12.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 50.000 $20.000 $15.000 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 10.000 $80.000 $100.000 $125.000
CONSTRUCTION PERIMETER FENCE
LF 120.000 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $2.500 $2.400 $2.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $0.500 $1.100 $1.100
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 500.000 $75.000 $84.000 $90.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 500.000 $20.000 $6.250 $10.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 500.000 $15.000 $19.000 $15.000
DRIVEWAYS (ACP)
SY 3,139.000 $25.000 $35.000 $28.000
DRIVEWAYS (CONC) (HES)
SY 43.000 $95.000 $110.000 $135.000
RUMBLE STRIPS (SHOULDER)
LF 67,968.000 $0.180 $0.180 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 33,984.000 $0.200 $0.210 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $24.000 $20.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,600.000 $1,400.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 975.000 $3.500 $2.250 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,400.000 $2,525.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $600.000 $200.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,000.000 $2,000.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $800.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $12,000.000 $9,100.000 $10,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 36.000 $200.000 $315.000 $350.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 4.000 $250.000 $350.000 $400.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $300.000 $500.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 39.000 $350.000 $375.000 $400.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 9.000 $475.000 $400.000 $400.000
REMOVE SM RD SN SUP&AM
EA 39.000 $90.000 $145.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $30.000 $20.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $35.000 $25.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 70,448.000 $0.160 $0.170 $0.190
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 70,028.000 $0.170 $0.170 $0.190
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,080.000 $1.250 $1.500 $2.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 15,471.000 $0.900 $1.300 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 239.000 $5.250 $6.000 $6.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 68,768.000 $0.350 $0.440 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,600.000 $0.350 $0.600 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 35,104.000 $0.350 $0.440 $0.500
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 9.000 $50.000 $75.000 $100.000
REFL PAV MRKR TY I-A
EA 34.000 $2.950 $4.000 $5.000
REFL PAV MRKR TY II-A-A
EA 595.000 $3.100 $4.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $110.000 $14,000.000 $8,000.000
TMA (STATIONARY)
DAY 105.000 $200.000 $150.000 $300.000
TMA (MOBILE OPERATION)
DAY 28.000 $100.000 $50.000 $300.000
Totals: $6,188,566.380 $6,403,500.830 $6,632,252.760