Show Job Controls
Bid Cobra

RUNNELS CR (0907-13-012)

Items: 51

County: RUNNELS
Length: N/A
Highway: CR
District: SAN ANGELO
Control Number: 0907-13-012
DBE Goal: N/A
Project: BR 1402(117)
Guaranty: N/A
Time: 216 WORKING DAYS
Engineer's Estimate: $2,412,984.10
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,412,984.10
1
$2,384,074.17
Over/Under Est: -1.2% -$28,909.93
$3,074,094.95
Over/Under Est: 27.4% $661,110.85
Amt Left: 28.94% $690,020.78
Over/Under Est: 29.59% $714,078.18
Amt Left: 31.16% $742,988.11
Delta: -1.72% -$52,967.33
Over/Under Est: 34.35% $828,832.56
Amt Left: 35.98% $857,742.49
Delta: -3.67% -$114,754.38

Bid Items & Bid Tabulations

51 Total 0 of 51
RUNNELS  |  CR  |  SAN ANGELO  |  0907-13-012  |  06/04/2020  |  $2,412,984.10  |  BR 1402(117)  |  BRIDGE REPL  |  216 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
FNH CONSTRUCTION, LLC
JAMES CONSTRUCTION GROUP, L.L.C.
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 20.240 $2,000.000 $5,000.000 $10,000.000 $14,800.000 $4,120.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 8.000 $750.000 $1,500.000 $2,000.000 $1,000.000 $1,610.000
EXCAVATION (ROADWAY)
CY 664.000 $35.000 $25.000 $30.000 $10.970 $55.100
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,311.000 $35.000 $30.000 $40.000 $24.490 $32.400
FURNISHING AND PLACING TOPSOIL (4")
SY 6,916.000 $6.000 $6.000 $10.000 $4.110 $4.350
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 6,916.000 $2.000 $1.000 $2.000 $1.940 $0.600
BROADCAST SEED (TEMP) (WARM)
SY 3,458.000 $1.750 $1.000 $2.000 $2.600 $0.240
BROADCAST SEED (TEMP) (COOL)
SY 3,458.000 $1.750 $1.000 $2.000 $2.600 $0.240
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 15.000 $1.500 $20.000 $10.000 $1.940 $17.900
PROOF ROLLING
HR 29.000 $100.000 $100.000 $150.000 $282.890 $85.900
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 4,134.000 $25.000 $28.000 $20.000 $30.000 $28.700
CEM STABIL BKFL
CY 194.000 $220.000 $165.000 $250.000 $207.910 $358.000
DRILL SHAFT (24 IN)
LF 216.000 $125.000 $210.000 $310.000 $185.830 $389.000
DRILL SHAFT (36 IN)
LF 837.000 $200.000 $295.000 $325.000 $286.910 $423.000
CL C CONC (ABUT)
CY 119.596 $1,300.000 $1,386.000 $900.000 $1,052.770 $1,380.000
CL C CONC (CAP)
CY 35.800 $925.000 $1,401.400 $900.000 $1,764.590 $1,800.000
CL C CONC (COLUMN)
CY 13.100 $930.000 $1,401.400 $1,000.000 $2,873.480 $1,710.000
REINF CONC SLAB
SF 6,370.000 $25.000 $30.100 $20.000 $31.050 $41.100
REINF CONC SLAB (SLAB BEAM)
SF 3,250.000 $25.000 $18.270 $20.000 $50.000 $26.000
PRESTR CONC SLAB BEAM (5SB15)
LF 617.500 $160.000 $160.000 $185.000 $216.930 $288.000
PRESTR CONC GIRDER (TX28)
LF 969.930 $160.000 $160.000 $185.000 $207.620 $278.000
RIPRAP (CONC)(5 IN)
CY 85.000 $650.000 $465.000 $650.000 $602.380 $760.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 35.000 $620.000 $175.000 $185.000 $184.160 $226.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 745.000 $175.000 $135.000 $150.000 $159.960 $191.000
RAIL (TY T223)
LF 860.000 $125.000 $117.600 $125.000 $211.390 $106.000
ARMOR JOINT (SEALED)
LF 198.000 $95.000 $99.400 $100.000 $155.190 $142.000
CONC BOX CULV (8 FT X 4 FT)
LF 108.000 $750.000 $687.400 $1,000.000 $1,008.500 $1,110.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
EA 8.000 $6,500.000 $5,950.000 $35,000.000 $15,377.820 $8,820.000
CLEAN EXIST CULVERTS
EA 1.000 $1,000.000 $4,500.000 $5,000.000 $4,772.860 $4,880.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $3,500.000 $2,500.000 $7,294.650 $1,320.000
REMOV STR (BOX CULVERT)
LF 76.000 $125.000 $250.000 $150.000 $119.710 $87.100
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $42,000.000 $18,000.000 $40,000.000 $35,000.000 $43,300.000
REMOV STR (RET WALL)
LF 161.000 $50.000 $100.000 $100.000 $39.820 $40.600
MOBILIZATION
LS 1.000 $219,464.000 $225,000.000 $300,000.000 $305,394.690 $255,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $5,000.000 $4,000.000 $5,000.000 $1,932.200 $6,580.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 319.000 $65.000 $19.800 $30.000 $45.000 $41.800
ROCK FILTER DAMS (REMOVE)
LF 319.000 $10.000 $11.000 $15.000 $22.000 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 780.000 $30.000 $16.500 $40.000 $37.270 $35.900
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $10.000 $5.500 $20.000 $11.000 $12.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,505.000 $10.000 $7.150 $18.000 $4.940 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,505.000 $2.000 $2.200 $9.000 $2.600 $3.600
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $30.000 $25.300 $35.000 $34.300 $35.900
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,000.000 $990.000 $1,850.000 $2,057.880 $2,150.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,200.000 $1,210.000 $1,850.000 $1,714.900 $1,790.000
MTL BM GD FEN TRANS (NON - SYM)
EA 8.000 $1,000.000 $715.000 $1,850.000 $1,257.590 $1,310.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $2,717.000 $2,850.000 $3,658.450 $3,820.000
WIRE FENCE (TY C)
LF 1,540.000 $20.000 $18.000 $10.000 $17.000 $10.500
REMOVE SM RD SN SUP&AM
EA 17.000 $200.000 $75.000 $250.000 $100.000 $149.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 32.000 $50.000 $22.000 $100.000 $25.000 $41.800
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $75.000 $85.000 $100.000 $25.000 $209.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 32.000 $50.000 $22.000 $100.000 $25.000 $41.800
Totals: $2,412,984.100 $2,384,074.166 $3,074,094.950 $3,127,062.273 $3,241,816.660