PREPARING ROW
|
STA
|
5.000
|
$6,000.000
|
$7,708.000
|
$19,850.460
|
$90,000.000
|
$6,000.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
438.000
|
$15.000
|
$17.500
|
$24.300
|
$30.000
|
$50.000
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,157.000
|
$8.000
|
$4.000
|
$2.000
|
$10.000
|
$20.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
623.000
|
$10.000
|
$93.000
|
$26.680
|
$15.000
|
$40.000
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,652.000
|
$8.000
|
$40.000
|
$23.270
|
$18.000
|
$18.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
21,180.000
|
$0.950
|
$4.000
|
$0.270
|
$4.000
|
$1.500
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
21,180.000
|
$0.200
|
$0.250
|
$0.280
|
$0.250
|
$0.500
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,313.000
|
$0.200
|
$1.500
|
$0.440
|
$1.450
|
$1.500
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,313.000
|
$0.200
|
$1.500
|
$0.440
|
$1.480
|
$1.500
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
23,806.000
|
$0.900
|
$1.500
|
$1.540
|
$1.550
|
$2.000
|
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(14")
|
SY
|
292.000
|
$25.000
|
$204.000
|
$63.250
|
$105.000
|
$135.300
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
557.000
|
$5.000
|
$10.500
|
$8.590
|
$9.020
|
$18.000
|
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
440.000
|
$80.000
|
$175.000
|
$142.150
|
$149.250
|
$325.000
|
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
7,429.000
|
$4.000
|
$7.500
|
$9.410
|
$9.880
|
$15.000
|
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
2,574.000
|
$3.000
|
$11.000
|
$11.750
|
$10.000
|
$18.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
260.000
|
$200.000
|
$281.000
|
$278.450
|
$160.000
|
$225.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
45.000
|
$130.000
|
$175.000
|
$56.930
|
$90.000
|
$250.000
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
240.000
|
$150.000
|
$157.000
|
$112.100
|
$150.000
|
$225.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,140.000
|
$275.000
|
$325.000
|
$345.890
|
$365.000
|
$300.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
106.800
|
$1,300.000
|
$1,000.000
|
$1,585.900
|
$1,202.600
|
$1,800.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
111.000
|
$1,400.000
|
$1,000.000
|
$1,676.950
|
$1,477.000
|
$2,000.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
29.000
|
$1,400.000
|
$1,800.000
|
$2,239.760
|
$1,589.000
|
$2,000.000
|
|
|
|
REINF CONC SLAB
|
SF
|
27,132.000
|
$27.000
|
$24.000
|
$37.670
|
$35.000
|
$26.000
|
|
|
|
APPROACH SLAB
|
CY
|
128.400
|
$500.000
|
$750.000
|
$976.300
|
$984.200
|
$800.000
|
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
3,852.000
|
$185.000
|
$207.000
|
$233.090
|
$215.000
|
$230.000
|
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
244.000
|
$400.000
|
$526.000
|
$630.340
|
$465.000
|
$550.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
174.000
|
$460.000
|
$629.000
|
$608.540
|
$485.000
|
$700.000
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,396.000
|
$80.000
|
$115.000
|
$108.750
|
$107.800
|
$150.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
250.000
|
$125.000
|
$231.000
|
$267.150
|
$215.000
|
$150.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
144.000
|
$56.000
|
$152.000
|
$108.100
|
$85.000
|
$125.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$4,064.000
|
$2,094.840
|
$2,250.000
|
$3,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,435.000
|
$4,865.000
|
$2,424.300
|
$2,350.000
|
$3,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$770.000
|
$3,800.000
|
$2,439.990
|
$2,250.000
|
$3,500.000
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$100,000.000
|
$48,500.000
|
$82,982.150
|
$150,000.000
|
$75,000.000
|
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
903.000
|
$3.000
|
$4.000
|
$4.040
|
$15.000
|
$10.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$460,000.000
|
$448,000.000
|
$586,228.830
|
$650,000.000
|
$500,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$8,000.000
|
$3,400.000
|
$8,006.430
|
$6,500.000
|
$2,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$30.000
|
$41.000
|
$44.260
|
$38.520
|
$40.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
100.000
|
$57.000
|
$141.000
|
$88.510
|
$133.210
|
$50.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
300.000
|
$9.000
|
$23.000
|
$16.600
|
$21.980
|
$5.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$23.000
|
$41.000
|
$19.740
|
$39.560
|
$22.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$7.000
|
$9.000
|
$6.380
|
$8.670
|
$1.250
|
|
|
|
CONSTRUCTING DETOURS (EBSS)
|
SY
|
7,125.000
|
$10.000
|
$17.000
|
$11.390
|
$20.000
|
$125.000
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,320.000
|
$30.000
|
$85.000
|
$9.280
|
$50.000
|
$80.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,290.000
|
$8.000
|
$9.000
|
$3.890
|
$20.000
|
$25.000
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,320.000
|
$7.000
|
$13.500
|
$6.850
|
$35.000
|
$30.000
|
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
295.000
|
$40.000
|
$58.000
|
$143.640
|
$165.000
|
$125.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
3,911.000
|
$1.000
|
$1.000
|
$0.330
|
$3.430
|
$4.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
794.000
|
$30.000
|
$37.000
|
$41.770
|
$37.400
|
$40.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,800.000
|
$2,446.000
|
$3,042.680
|
$2,420.000
|
$3,000.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,300.000
|
$1,630.000
|
$1,681.770
|
$1,485.000
|
$2,200.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,280.000
|
$3.000
|
$2.500
|
$3.320
|
$2.200
|
$5.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$250.000
|
$175.000
|
$331.930
|
$275.000
|
$800.000
|
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
2,253.000
|
$8.000
|
$27.000
|
$17.700
|
$23.000
|
$40.000
|
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
4.000
|
$2,800.000
|
$3,500.000
|
$4,978.930
|
$5,500.000
|
$5,000.000
|
|
|
|
REMOVE CABLE BARRIER
|
LF
|
2,157.000
|
$4.000
|
$5.000
|
$3.320
|
$3.000
|
$10.000
|
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
2.000
|
$500.000
|
$500.000
|
$1,106.430
|
$1,500.000
|
$1,000.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,700.000
|
$3,580.000
|
$3,872.500
|
$3,355.000
|
$4,000.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$300.000
|
$232.000
|
$331.930
|
$275.000
|
$500.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$2,912.000
|
$510.380
|
$800.000
|
$3,500.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$730.000
|
$1,164.000
|
$384.730
|
$500.000
|
$3,000.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$13,016.000
|
$10,877.710
|
$9,500.000
|
$14,000.000
|
|
|
|
WIRE FENCE (TY D)
|
LF
|
843.000
|
$8.000
|
$23.000
|
$16.280
|
$35.000
|
$40.000
|
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
60.000
|
$45.000
|
$116.000
|
$189.200
|
$150.000
|
$75.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$600.000
|
$1,132.000
|
$1,075.450
|
$715.000
|
$1,800.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$1,000.000
|
$1,324.000
|
$1,258.010
|
$869.000
|
$1,200.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$100.000
|
$232.000
|
$139.510
|
$22.000
|
$400.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
15.000
|
$25.000
|
$23.000
|
$21.020
|
$20.900
|
$40.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
2.000
|
$20.000
|
$23.000
|
$21.020
|
$21.450
|
$40.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
3.000
|
$30.000
|
$29.000
|
$33.190
|
$27.500
|
$40.000
|
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
4.000
|
$145.000
|
$52.000
|
$87.410
|
$150.000
|
$75.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
5.000
|
$70.000
|
$52.000
|
$90.730
|
$150.000
|
$75.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR)
|
LF
|
16,788.000
|
$1.000
|
$1.000
|
$0.980
|
$1.100
|
$1.250
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD W/MRKR)
|
LF
|
20,263.000
|
$1.000
|
$1.000
|
$0.980
|
$1.100
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
584.000
|
$1.000
|
$1.500
|
$2.210
|
$1.690
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
142.000
|
$6.000
|
$14.000
|
$16.600
|
$13.200
|
$16.000
|
|
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
3,185.000
|
$1.000
|
$0.250
|
$0.330
|
$0.220
|
$0.500
|
|
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
11,062.000
|
$1.000
|
$0.150
|
$0.330
|
$0.160
|
$0.500
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
584.000
|
$1.000
|
$1.000
|
$0.770
|
$1.100
|
$3.000
|
|
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
142.000
|
$3.000
|
$6.000
|
$2.210
|
$5.500
|
$12.000
|
|
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
12,238.000
|
$1.000
|
$0.150
|
$0.330
|
$0.160
|
$0.400
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,185.000
|
$1.000
|
$1.000
|
$0.890
|
$0.880
|
$1.250
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
11,062.000
|
$1.000
|
$1.000
|
$0.890
|
$0.880
|
$1.250
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,238.000
|
$1.000
|
$1.000
|
$0.890
|
$0.880
|
$1.250
|
|
|
|
REFL PAV MRKR TY I-A
|
EA
|
16.000
|
$3.000
|
$11.500
|
$7.860
|
$11.000
|
$20.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
30.000
|
$4.000
|
$11.500
|
$7.860
|
$11.000
|
$20.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2.000
|
$3.000
|
$29.000
|
$7.860
|
$27.500
|
$20.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
161.000
|
$4.000
|
$11.500
|
$7.860
|
$11.000
|
$20.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,352.000
|
$1.000
|
$1.500
|
$1.270
|
$1.370
|
$2.000
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
631.000
|
$80.000
|
$210.000
|
$168.900
|
$177.340
|
$165.000
|
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
308.000
|
$105.000
|
$210.000
|
$238.430
|
$250.350
|
$190.000
|
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
2,417.000
|
$80.000
|
$204.000
|
$138.590
|
$145.520
|
$175.000
|
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
806.000
|
$100.000
|
$210.000
|
$148.690
|
$156.120
|
$200.000
|
|
|
|
TACK COAT
|
GAL
|
642.000
|
$5.000
|
$7.500
|
$3.340
|
$3.500
|
$4.000
|
|
|
|
UNDERSEAL COURSE
|
GAL
|
544.000
|
$3.000
|
$7.500
|
$37.370
|
$39.230
|
$12.000
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$500.000
|
$550.000
|
$387.380
|
$800.000
|
$1,500.000
|
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
3,380.000
|
$5.000
|
$4.750
|
$3.140
|
$6.000
|
$2.250
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,114.000
|
$85.000
|
$58.000
|
$48.210
|
$150.000
|
$75.000
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$8,500.000
|
$13,975.000
|
$15,345.590
|
$12,500.000
|
$20,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
184.000
|
$180.000
|
$302.000
|
$221.090
|
$300.000
|
$150.000
|
|
1
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
737.000
|
$2.500
|
$6.000
|
$5.530
|
$6.560
|
$4.250
|
|
1
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
737.000
|
$0.800
|
$1.000
|
$1.110
|
$1.270
|
$1.500
|
|
1A
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
737.000
|
$2.500
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
737.000
|
$0.800
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$4,590,169.800
|
$5,693,419.750
|
$6,125,612.820
|
$6,818,807.890
|
$6,995,504.050
|