Show Job Controls
Bid Cobra

RUNNELS US 67 (0158-01-081)

Items: 104

County: RUNNELS
Length: N/A
Highway: US 67
District: SAN ANGELO
Control Number: 0158-01-081
DBE Goal: N/A
Project: BR 2022(652)
Guaranty: N/A
Time: 379 WORKING DAYS
Engineer's Estimate: $4,587,737.70
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JORDAN SEFCIK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$4,587,737.70
$5,693,419.75
Over/Under Est: 24.1% $1,105,682.05
$6,125,612.82
Over/Under Est: 33.52% $1,537,875.12
Amt Left: 7.59% $432,193.07
$6,818,807.89
Over/Under Est: 48.63% $2,231,070.19
Amt Left: 19.77% $1,125,388.14
Delta: -11.32% -$693,195.07
Over/Under Est: 52.48% $2,407,766.35
Amt Left: 22.87% $1,302,084.30
Delta: -2.59% -$176,696.16
Subcontractor Percentage Amount
PRATER DIRT WORK LLC 23.09% $1,314,610.62
HODGES AND SON CONSTRUCTION COMPANY, INC. 4.94% $281,254.94
HJC FARMS, INC. 3.13% $178,204.04
BARRICADES UNLIMITED 2.21% $125,824.58
MORRIS COUNTY CONTRACTORS, L.L.C. 1.70% $96,788.14
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.54% $87,678.66
TRP CONSTRUCTION GROUP, LLC 1.40% $79,707.88
TEX OP CONSTRUCTION, LP 0.51% $29,036.44
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.22% $12,525.52
TORO BRAVO CONSTRUCTION, LLC 0.20% $11,386.84
DK CONTRACTING, LLC 0.19% $10,817.50
PRIMATE CONSTRUCTION, LP 0.18% $10,248.16
WEST TEXAS ROCK RESOURCES, LLC 0.06% $3,416.05
Total: 39.37% $2,241,499.37

Bid Items & Bid Tabulations

104 Total 0 of 104
RUNNELS  |  US 67  |  SAN ANGELO  |  0158-01-081  |  06/02/2022  |  $4,587,737.70  |  BR 2022(652)  |  BRIDGE REPL  |  379 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
COPPELL CONSTRUCTION CO., INC.
REECE ALBERT, INC.
RELMCO, INC.
STATELINE CONSTRUCTION, LLC
PREPARING ROW
STA 5.000 $6,000.000 $7,708.000 $19,850.460 $90,000.000 $6,000.000
REMOVING CONC (RIPRAP)
SY 438.000 $15.000 $17.500 $24.300 $30.000 $50.000
REMOVING CONCRETE(MOW STRIP)
LF 2,157.000 $8.000 $4.000 $2.000 $10.000 $20.000
EXCAVATION (ROADWAY)
CY 623.000 $10.000 $93.000 $26.680 $15.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,652.000 $8.000 $40.000 $23.270 $18.000 $18.000
FURNISHING AND PLACING TOPSOIL (4")
SY 21,180.000 $0.950 $4.000 $0.270 $4.000 $1.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 21,180.000 $0.200 $0.250 $0.280 $0.250 $0.500
BROADCAST SEED (TEMP) (WARM)
SY 1,313.000 $0.200 $1.500 $0.440 $1.450 $1.500
BROADCAST SEED (TEMP) (COOL)
SY 1,313.000 $0.200 $1.500 $0.440 $1.480 $1.500
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 23,806.000 $0.900 $1.500 $1.540 $1.550 $2.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(14")
SY 292.000 $25.000 $204.000 $63.250 $105.000 $135.300
PRIME COAT (MC-30)
GAL 557.000 $5.000 $10.500 $8.590 $9.020 $18.000
AGGR(TY-PE GR-3 SAC-B)
CY 440.000 $80.000 $175.000 $142.150 $149.250 $325.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 7,429.000 $4.000 $7.500 $9.410 $9.880 $15.000
PLANE ASPH CONC PAV (6")
SY 2,574.000 $3.000 $11.000 $11.750 $10.000 $18.000
CEM STABIL BKFL
CY 260.000 $200.000 $281.000 $278.450 $160.000 $225.000
CUT & RESTORING PAV
SY 45.000 $130.000 $175.000 $56.930 $90.000 $250.000
DRILL SHAFT (18 IN)
LF 240.000 $150.000 $157.000 $112.100 $150.000 $225.000
DRILL SHAFT (36 IN)
LF 1,140.000 $275.000 $325.000 $345.890 $365.000 $300.000
CL C CONC (ABUT)
CY 106.800 $1,300.000 $1,000.000 $1,585.900 $1,202.600 $1,800.000
CL C CONC (CAP)
CY 111.000 $1,400.000 $1,000.000 $1,676.950 $1,477.000 $2,000.000
CL C CONC (COLUMN)
CY 29.000 $1,400.000 $1,800.000 $2,239.760 $1,589.000 $2,000.000
REINF CONC SLAB
SF 27,132.000 $27.000 $24.000 $37.670 $35.000 $26.000
APPROACH SLAB
CY 128.400 $500.000 $750.000 $976.300 $984.200 $800.000
PRESTR CONC GIRDER (TX34)
LF 3,852.000 $185.000 $207.000 $233.090 $215.000 $230.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 244.000 $400.000 $526.000 $630.340 $465.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 174.000 $460.000 $629.000 $608.540 $485.000 $700.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,396.000 $80.000 $115.000 $108.750 $107.800 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 250.000 $125.000 $231.000 $267.150 $215.000 $150.000
RC PIPE (CL III)(18 IN)
LF 144.000 $56.000 $152.000 $108.100 $85.000 $125.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $4,064.000 $2,094.840 $2,250.000 $3,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,435.000 $4,865.000 $2,424.300 $2,350.000 $3,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $770.000 $3,800.000 $2,439.990 $2,250.000 $3,500.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $100,000.000 $48,500.000 $82,982.150 $150,000.000 $75,000.000
REMOV STR (SMALL FENCE)
LF 903.000 $3.000 $4.000 $4.040 $15.000 $10.000
MOBILIZATION
LS 1.000 $460,000.000 $448,000.000 $586,228.830 $650,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $8,000.000 $3,400.000 $8,006.430 $6,500.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $30.000 $41.000 $44.260 $38.520 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000 $57.000 $141.000 $88.510 $133.210 $50.000
ROCK FILTER DAMS (REMOVE)
LF 300.000 $9.000 $23.000 $16.600 $21.980 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $23.000 $41.000 $19.740 $39.560 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $7.000 $9.000 $6.380 $8.670 $1.250
CONSTRUCTING DETOURS (EBSS)
SY 7,125.000 $10.000 $17.000 $11.390 $20.000 $125.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,320.000 $30.000 $85.000 $9.280 $50.000 $80.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,290.000 $8.000 $9.000 $3.890 $20.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,320.000 $7.000 $13.500 $6.850 $35.000 $30.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 295.000 $40.000 $58.000 $143.640 $165.000 $125.000
RUMBLE STRIPS (SHOULDER)
LF 3,911.000 $1.000 $1.000 $0.330 $3.430 $4.000
MTL W-BEAM GD FEN (STEEL POST)
LF 794.000 $30.000 $37.000 $41.770 $37.400 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,800.000 $2,446.000 $3,042.680 $2,420.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,300.000 $1,630.000 $1,681.770 $1,485.000 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 2,280.000 $3.000 $2.500 $3.320 $2.200 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $250.000 $175.000 $331.930 $275.000 $800.000
CABLE BARRIER SYSTEM (TL-3)
LF 2,253.000 $8.000 $27.000 $17.700 $23.000 $40.000
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 4.000 $2,800.000 $3,500.000 $4,978.930 $5,500.000 $5,000.000
REMOVE CABLE BARRIER
LF 2,157.000 $4.000 $5.000 $3.320 $3.000 $10.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 2.000 $500.000 $500.000 $1,106.430 $1,500.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,700.000 $3,580.000 $3,872.500 $3,355.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $232.000 $331.930 $275.000 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $2,912.000 $510.380 $800.000 $3,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $730.000 $1,164.000 $384.730 $500.000 $3,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $13,016.000 $10,877.710 $9,500.000 $14,000.000
WIRE FENCE (TY D)
LF 843.000 $8.000 $23.000 $16.280 $35.000 $40.000
WIRE FENCE (WATER GAP)
LF 60.000 $45.000 $116.000 $189.200 $150.000 $75.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $600.000 $1,132.000 $1,075.450 $715.000 $1,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $1,000.000 $1,324.000 $1,258.010 $869.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 9.000 $100.000 $232.000 $139.510 $22.000 $400.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 15.000 $25.000 $23.000 $21.020 $20.900 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 2.000 $20.000 $23.000 $21.020 $21.450 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $30.000 $29.000 $33.190 $27.500 $40.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 4.000 $145.000 $52.000 $87.410 $150.000 $75.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 5.000 $70.000 $52.000 $90.730 $150.000 $75.000
WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR)
LF 16,788.000 $1.000 $1.000 $0.980 $1.100 $1.250
WK ZN PAV MRK REMOV (Y)4"(SLD W/MRKR)
LF 20,263.000 $1.000 $1.000 $0.980 $1.100 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 584.000 $1.000 $1.500 $2.210 $1.690 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 142.000 $6.000 $14.000 $16.600 $13.200 $16.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,185.000 $1.000 $0.250 $0.330 $0.220 $0.500
REFL PAV MRK TY II (W) 4" (SLD)
LF 11,062.000 $1.000 $0.150 $0.330 $0.160 $0.500
REFL PAV MRK TY II (W) 8" (SLD)
LF 584.000 $1.000 $1.000 $0.770 $1.100 $3.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 142.000 $3.000 $6.000 $2.210 $5.500 $12.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 12,238.000 $1.000 $0.150 $0.330 $0.160 $0.400
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,185.000 $1.000 $1.000 $0.890 $0.880 $1.250
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 11,062.000 $1.000 $1.000 $0.890 $0.880 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,238.000 $1.000 $1.000 $0.890 $0.880 $1.250
REFL PAV MRKR TY I-A
EA 16.000 $3.000 $11.500 $7.860 $11.000 $20.000
REFL PAV MRKR TY I-C
EA 30.000 $4.000 $11.500 $7.860 $11.000 $20.000
REFL PAV MRKR TY II-A-A
EA 2.000 $3.000 $29.000 $7.860 $27.500 $20.000
REFL PAV MRKR TY II-C-R
EA 161.000 $4.000 $11.500 $7.860 $11.000 $20.000
ELIM EXT PAV MRK & MRKS (4")
LF 9,352.000 $1.000 $1.500 $1.270 $1.370 $2.000
D-GR HMA TY-B PG64-22
TON 631.000 $80.000 $210.000 $168.900 $177.340 $165.000
D-GR HMA TY-C SAC-B PG70-22
TON 308.000 $105.000 $210.000 $238.430 $250.350 $190.000
SP MIXES SP-B PG64-22
TON 2,417.000 $80.000 $204.000 $138.590 $145.520 $175.000
SP MIXES SP-C PG70-22
TON 806.000 $100.000 $210.000 $148.690 $156.120 $200.000
TACK COAT
GAL 642.000 $5.000 $7.500 $3.340 $3.500 $4.000
UNDERSEAL COURSE
GAL 544.000 $3.000 $7.500 $37.370 $39.230 $12.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $500.000 $550.000 $387.380 $800.000 $1,500.000
FILLING MILLED ASPHALT RUMBLE STRIPS
LF 3,380.000 $5.000 $4.750 $3.140 $6.000 $2.250
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,114.000 $85.000 $58.000 $48.210 $150.000 $75.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $8,500.000 $13,975.000 $15,345.590 $12,500.000 $20,000.000
TMA (STATIONARY)
DAY 184.000 $180.000 $302.000 $221.090 $300.000 $150.000
1
TEMP SEDMT CONT FENCE (INSTALL)
LF 737.000 $2.500 $6.000 $5.530 $6.560 $4.250
1
TEMP SEDMT CONT FENCE (REMOVE)
LF 737.000 $0.800 $1.000 $1.110 $1.270 $1.500
1A
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 737.000 $2.500 $0.000 $0.000 $0.000 $0.000
1A
BIODEG EROSN CONT LOGS (REMOVE)
LF 737.000 $0.800 $0.000 $0.000 $0.000 $0.000
Totals: $4,590,169.800 $5,693,419.750 $6,125,612.820 $6,818,807.890 $6,995,504.050