ROCKWALL IH0030 (6318-50-001)

Items: 12

County: ROCKWALL
Length: N/A
Highway: IH0030
District: DALLAS
Control Number: 6318-50-001
DBE Goal: N/A
Project: BPM - 631850001
Guaranty: N/A
Time: 60 W
Engineer's Estimate: $517,455.00
Date: 02/01/2018 (8 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$517,455.00
$525,013.00
Over/Under Est: 1.46% $7,558.00
Over/Under Est: 1.86% $9,645.00
Amt Left: 0.4% $2,087.00
Over/Under Est: 4.21% $21,775.00
Amt Left: 2.71% $14,217.00
Delta: -2.30% -$12,130.00
Over/Under Est: 19.57% $101,249.00
Amt Left: 17.85% $93,691.00
Delta: -14.74% -$79,474.00
Over/Under Est: 21.29% $110,145.00
Amt Left: 19.54% $102,587.00
Delta: -1.44% -$8,896.00
Over/Under Est: 43.13% $223,165.00
Amt Left: 41.07% $215,607.00
Delta: -18.01% -$113,020.00

Bid Items & Bid Tabulations

12 Total 0 of 12
ROCKWALL  |  IH0030  |  DALLAS  |  6318-50-001  |  02/01/2018  |  $517,455.00  |  BPM - 631850001  |  BRIDGE PREVENT MAINT  |  60 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
CHAMPION INFRASTRUCTURE, LLC
IOWA BRIDGE & CULVERT, LC
STATELINE CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
SJ&J CONSTRUCTION, LLC
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 488.000 $120.000 $57.000 $140.000 $160.000 $105.000 $200.000 $90.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 162.000 $225.000 $176.000 $240.000 $180.000 $185.000 $350.000 $180.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 60.000 $177.000 $180.000 $180.000 $200.000 $160.000 $1,000.000 $180.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 485.000 $246.000 $360.000 $180.000 $175.000 $225.000 $250.000 $210.000
BEDDING MATERIAL (6 IN)
CY 61.000 $200.000 $183.000 $180.000 $150.000 $160.000 $60.000 $60.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 12,420.000 $13.000 $8.700 $7.000 $15.000 $16.950 $6.500 $18.000
ARMOR JOINT (SEALED)
LF 244.000 $120.000 $75.000 $180.000 $85.000 $125.000 $65.000 $70.000
MOBILIZATION
LS 1.000 $15,000.000 $47,000.000 $60,000.000 $53,000.000 $60,000.000 $60,000.000 $230,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,700.000 $10,000.000 $7,000.000 $5,000.000 $4,500.000 $8,500.000 $8,000.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 47.000 $125.000 $250.000 $160.000 $325.000 $145.000 $350.000 $70.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 9.000 $2,000.000 $642.000 $400.000 $1,250.000 $795.000 $1,850.000 $500.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 488.000 $75.000 $105.000 $180.000 $50.000 $165.000 $150.000 $100.000
Totals: $517,455.000 $525,013.000 $527,100.000 $539,230.000 $618,704.000 $627,600.000 $740,620.000