Show Job Controls
Bid Cobra

ROCKWALL FM 3097 (3148-01-011)

Items: 83

County: ROCKWALL
Length: 1.7580 MILES
Highway: FM 3097
District: DALLAS
Control Number: 3148-01-011
DBE Goal: 5.0%
Project: F 2025(347)
Guaranty: $61,000.00
Time: 150 WORKING DAYS
Engineer's Estimate: $3,070,989.24
Date: 01/07/2025 (1 year ago)
Contract Number: 1253017
Type: RECONSTRUCT EXISTING ROADWAY
Project ID: A00066995
Contract Type: Federal
Project Description: REHABILITATE PAVEMENT AND ADD SHOULDERS
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,070,989.24
$3,015,283.42
Over/Under Est: -1.81% -$55,705.82
Over/Under Est: 10.55% $324,010.76
Amt Left: 12.59% $379,716.58
$3,604,268.00
Over/Under Est: 17.37% $533,278.76
Amt Left: 19.53% $588,984.58
Delta: -6.16% -$209,268.00
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 16.17% $493,769.44
J. H. ODEN CONTRACTING COMPANY 3.89% $118,785.60
FORTSON CONTRACTING, INC. 3.78% $115,426.62
DUSTROL, INC. 2.67% $81,531.50
TRP CONSTRUCTION GROUP, LLC 1.63% $49,773.91
CATOCON, INC. 0.98% $29,925.42
SYNERGY SIGNS & SERVICES LLC 0.95% $29,009.34
TEXAS TRAFFIC AND BARRICADE, LLC 0.49% $14,962.71
TEXOP CONSTRUCTION 0.28% $8,550.12
Total: 30.84% $941,734.66

Bid Items & Bid Tabulations

83 Total 0 of 83
ROCKWALL  |  FM 3097  |  DALLAS  |  3148-01-011  |  01/07/2025  |  $3,070,989.24  |  F 2025(347)  |  RECON EXIST ROADWAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 92.800 $2,500.000 $1,037.250 $2,612.000 $3,335.000
REMOV CONC (RIPRAP)
SY 270.000 $18.000 $16.000 $30.000 $50.000
REMOV CONC (DRIVEWAYS)
SY 2,359.000 $18.000 $13.500 $28.000 $20.000
RMV (20") TRT/UNTRT BASE & ASPH PAV
SY 296.000 $20.000 $11.000 $10.500 $50.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 844.000 $10.000 $11.000 $17.850 $20.000
EXCAV (ROADWAY)
CY 2.000 $30.000 $175.000 $105.000 $500.000
SUBGR WIDEN (OC)
STA 13.250 $550.000 $1,234.000 $1,575.000 $450.000
EMBANK (FNL)(OC)(TY C)
CY 673.000 $50.000 $72.000 $63.000 $50.000
BACKFILL (TY A OR B)
STA 19.700 $300.000 $360.000 $735.000 $450.000
ROAD GRADER WORK (ORD COMP)
STA 13.250 $200.000 $555.000 $3,600.000 $450.000
COMPOST MANUF TOPSOIL (4")
SY 14,092.000 $1.500 $2.600 $1.050 $10.000
DRILL SEED (TEMP_WARM_COOL)
SY 14,092.000 $0.170 $0.330 $0.360 $0.500
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 14,092.000 $0.250 $0.550 $0.550 $0.500
VEGETATIVE WATERING
TGL 4,194.000 $2.500 $0.100 $2.100 $25.000
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 1,621.000 $40.000 $45.000 $52.500 $50.000
PRIME COAT(MC-30 OR AE-P)
GAL 325.000 $15.000 $8.000 $17.000 $6.000
SP MIXES SP-B PG64-22
TON 292.000 $140.000 $188.000 $225.000 $165.000
SP MIXES SP-C SAC-B PG70-22
TON 4,298.000 $150.000 $161.000 $165.000 $185.000
TACK COAT
GAL 3,488.000 $5.500 $4.600 $1.000 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,905.000 $105.000 $92.000 $90.000 $80.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 9,330.000 $2.500 $3.220 $3.150 $10.000
RIPRAP (CONC)(4 IN)
CY 8.000 $500.000 $1,000.000 $1,100.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 172.000 $450.000 $800.000 $750.000 $550.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 34.000 $275.000 $330.000 $500.000 $185.000
RC PIPE (CL III)(18 IN)
LF 104.000 $80.000 $105.000 $100.000 $95.000
RC PIPE (CL III)(24 IN)
LF 24.000 $100.000 $132.000 $175.000 $120.000
RC PIPE (CL IV)(42 IN)
LF 16.000 $210.000 $420.000 $800.000 $250.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $16,000.000 $19,000.000 $20,000.000 $25,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,400.000 $2,200.000 $1,800.000 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $2,400.000 $2,400.000 $2,500.000
CLEAN EXIST CULVERTS
EA 6.000 $1,200.000 $3,600.000 $3,500.000 $2,500.000
REMOV STR (WINGWALL)
EA 2.000 $1,800.000 $1,200.000 $7,500.000 $2,500.000
REMOV STR (PIPE)
EA 3.000 $500.000 $300.000 $1,500.000 $500.000
MOBILIZATION
LS 1.000 $279,181.000 $300,049.000 $339,966.500 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $20,000.000 $18,755.000 $31,500.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2.000 $15,000.000 $450.000 $210.000 $20,000.000
TMA (STATIONARY)
DAY 150.000 $175.000 $400.000 $157.500 $250.000
TMA (MOBILE OPERATION)
DAY 16.000 $200.000 $1.000 $840.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 420.000 $63.000 $52.000 $54.320 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 184.000 $80.000 $82.000 $111.830 $50.000
ROCK FILTER DAMS (REMOVE)
LF 604.000 $25.000 $18.000 $26.630 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 164.000 $30.000 $43.000 $37.280 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 164.000 $15.000 $16.000 $10.650 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,510.000 $4.000 $4.500 $3.460 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,510.000 $1.000 $1.100 $1.070 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 489.000 $10.000 $5.500 $6.390 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 489.000 $2.000 $1.100 $1.070 $9.000
DRIVEWAYS (CONC) (HES)
SY 2,343.000 $150.000 $132.000 $116.000 $150.000
DRIVEWAYS (ACP)
SY 831.000 $90.000 $104.000 $106.000 $55.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,275.000 $30.000 $26.000 $23.430 $28.000
SHORT RADIUS (28")
LF 50.000 $45.000 $28.000 $25.030 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 1,850.000 $3.500 $3.000 $2.660 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 19.000 $2,600.000 $3,200.000 $3,035.250 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $250.000 $275.000 $266.250 $1,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $300.000 $300.000 $282.230 $850.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 22.000 $40.000 $38.000 $37.280 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 32.000 $750.000 $691.000 $662.430 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $850.000 $810.000 $749.760 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,000.000 $1,050.000 $998.970 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $885.000 $1,650.000 $1,627.320 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $1,150.000 $1,142.750 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,250.000 $1,325.000 $1,272.680 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 54.000 $25.000 $23.000 $21.830 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 15.000 $50.000 $50.000 $47.930 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 98.000 $2.000 $1.200 $5.250 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 928.000 $1.750 $1.200 $5.500 $6.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 141.000 $1.400 $2.100 $1.600 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,957.000 $1.200 $1.100 $1.040 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 280.000 $10.000 $7.810 $10.380 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 22.000 $170.000 $160.000 $202.350 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $170.000 $237.000 $239.630 $250.000
RE PM TY II (W) 6" (SLD)
LF 18,560.000 $1.000 $0.220 $0.320 $1.000
RE PM TY II (Y) 6" (SLD)
LF 18,560.000 $1.000 $0.220 $0.320 $1.000
PAVEMENT SLER 8"
LF 10.000 $2.250 $3.850 $0.530 $20.000
PAVEMENT SLER 24"
LF 81.000 $3.000 $8.310 $3.200 $20.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 17,280.000 $0.750 $0.720 $0.750 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 740.000 $0.750 $0.720 $0.770 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 22,380.000 $0.750 $0.720 $0.750 $1.000
REFL PAV MRKR TY I-C
EA 98.000 $4.100 $4.400 $5.270 $6.000
REFL PAV MRKR TY II-A-A
EA 982.000 $4.750 $4.400 $5.270 $6.000
PAV SURF PREP FOR MRK (8")
LF 10.000 $2.000 $3.300 $1.070 $20.000
PAV SURF PREP FOR MRK (24")
LF 81.000 $2.500 $7.700 $2.130 $20.000
FULL - WIDTH MOWING
CYC 3.000 $5,000.000 $2,600.000 $3,000.000 $5,000.000
Totals: $3,070,989.240 $3,015,283.420 $3,395,000.000 $3,604,268.000