Show Job Controls
Bid Cobra

ROCKWALL SH 276 (1290-02-023)

Items: 79

County: ROCKWALL
Length: N/A
Highway: SH 276
District: DALLAS
Control Number: 1290-02-023
DBE Goal: N/A
Project: F 2023(106)
Guaranty: N/A
Time: 68 WORKING DAYS
Engineer's Estimate: $2,609,160.35
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,609,160.35
$2,748,754.00
Over/Under Est: 5.35% $139,593.65
Over/Under Est: 6.83% $178,292.23
Amt Left: 1.41% $38,698.58
Over/Under Est: 12.64% $329,854.49
Amt Left: 6.92% $190,260.84
Delta: -5.44% -$151,562.26
Over/Under Est: 16.1% $420,107.83
Amt Left: 10.21% $280,514.18
Delta: -3.07% -$90,253.34

Bid Items & Bid Tabulations

79 Total 0 of 79
ROCKWALL  |  SH 276  |  DALLAS  |  1290-02-023  |  09/07/2022  |  $2,609,160.35  |  F 2023(106)  |  RESURF ROADWAY  |  68 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
FOUTSCO PAVING COMPANY, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
PEACHTREE CONSTRUCTION, LTD.
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 9.000 $25.000 $110.000 $300.000 $100.000 $110.000
BACKFILL (TY A OR B)
STA 248.470 $155.000 $205.000 $100.000 $218.230 $250.000
COMPOST MANUF TOPSOIL (4")
SY 10,757.000 $1.100 $1.000 $2.000 $2.100 $0.950
BLOCK SODDING
SY 10,757.000 $3.750 $4.500 $4.000 $5.690 $4.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 3,587.000 $0.400 $0.260 $0.010 $2.060 $0.270
VEGETATIVE WATERING
MG 2,136.000 $2.000 $0.010 $1.000 $0.110 $20.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,600.000 $55.000 $65.000 $75.000 $80.710 $66.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 25,509.000 $2.300 $3.000 $1.500 $2.860 $3.100
CEM STABIL BKFL
CY 9.000 $175.000 $884.000 $250.000 $800.000 $860.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $230.000 $242.000 $400.000 $500.000 $535.000
RIPRAP (CONC)(5 IN)
CY 8.500 $300.000 $663.000 $600.000 $653.150 $640.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 85.000 $350.000 $304.000 $200.000 $301.610 $295.000
RIPRAP (MOW STRIP)(4 IN)
CY 175.000 $475.000 $592.000 $600.000 $577.130 $575.000
CLEAN EXIST CULVERTS
EA 4.000 $2,000.000 $1,600.000 $1,500.000 $1,500.000 $1,650.000
MOBILIZATION
LS 1.000 $232,464.000 $178,116.000 $100,000.000 $293,901.480 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $9,500.000 $26,000.000 $10,000.000 $25,000.000 $8,750.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 270.000 $55.000 $62.000 $56.000 $112.290 $60.000
ROCK FILTER DAMS (REMOVE)
LF 270.000 $10.000 $8.850 $8.000 $15.370 $9.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $20.000 $25.400 $25.000 $38.620 $27.000
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $7.000 $7.620 $7.500 $7.630 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,014.000 $2.750 $2.370 $2.300 $4.450 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,014.000 $0.500 $0.520 $0.500 $0.880 $0.550
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,237.000 $4.300 $4.100 $4.000 $5.650 $4.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,237.000 $1.150 $0.780 $0.750 $0.880 $0.850
RUMBLE STRIPS (SHOULDER)
LF 41,264.000 $0.180 $0.145 $0.140 $0.340 $0.250
RUMBLE STRIPS (CENTERLINE)
LF 19,331.000 $0.180 $0.145 $0.140 $0.360 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 1,895.000 $23.000 $24.000 $22.000 $22.250 $25.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 180.000 $90.000 $103.000 $200.000 $60.000 $102.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,300.000 $1,705.000 $1,500.000 $1,125.000 $1,210.000
REMOVE METAL BEAM GUARD FENCE
LF 1,975.000 $2.750 $1.750 $5.000 $3.000 $2.300
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,000.000 $2,800.000 $2,750.000 $2,900.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 17.000 $250.000 $208.000 $200.000 $300.000 $225.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 91.000 $500.000 $670.000 $615.000 $615.000 $760.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $550.000 $825.000 $750.000 $750.000 $910.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $750.000 $1,275.000 $1,115.000 $1,115.000 $1,350.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $850.000 $1,230.000 $1,080.000 $1,080.000 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $925.000 $1,400.000 $1,230.000 $1,230.000 $1,510.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 7.000 $800.000 $1,400.000 $1,250.000 $1,250.000 $1,510.000
REMOVE SM RD SN SUP&AM
EA 104.000 $100.000 $78.000 $20.000 $20.000 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 38.000 $29.000 $25.750 $24.000 $24.000 $44.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 9.000 $130.000 $46.000 $75.000 $100.000 $88.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,255.000 $1.500 $1.050 $0.750 $3.880 $2.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 507.000 $5.500 $1.030 $1.000 $1.000 $2.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 689.000 $1.200 $1.030 $1.000 $1.000 $1.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 132.000 $3.800 $5.200 $4.000 $5.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 267.000 $7.000 $8.200 $8.000 $8.000 $8.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $140.000 $156.000 $150.000 $150.000 $175.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $160.000 $207.000 $175.000 $200.000 $210.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 57,588.000 $0.200 $0.160 $0.170 $0.150 $0.190
REFL PAV MRK TY II (W) 8" (SLD)
LF 51.000 $0.350 $1.030 $0.420 $1.000 $0.460
REFL PAV MRK TY II (W) 24" (SLD)
LF 267.000 $3.500 $2.040 $3.000 $2.000 $3.100
REFL PAV MRK TY II (Y) 4" (SLD)
LF 57,588.000 $0.200 $0.160 $0.170 $0.150 $0.190
PAVEMENT SEALER 4"
LF 1,100.000 $0.200 $0.260 $0.500 $0.250 $0.150
PAVEMENT SEALER 12"
LF 132.000 $1.200 $2.060 $1.000 $2.000 $0.950
PAVEMENT SEALER 24"
LF 27.000 $2.000 $4.080 $2.000 $4.000 $1.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 41,678.000 $0.400 $0.480 $0.500 $0.460 $0.550
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 8,597.000 $0.700 $0.730 $0.800 $0.700 $0.780
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,900.000 $0.500 $0.580 $0.550 $0.550 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 34,142.000 $0.450 $0.480 $0.550 $0.460 $0.550
REFL PAV MRKR TY I-C
EA 38.000 $4.300 $10.500 $5.000 $10.000 $4.600
REFL PAV MRKR TY II-A-A
EA 819.000 $4.300 $4.620 $3.750 $4.500 $5.200
ELIM EXT PAV MRK & MRKS (4")
LF 1,556.000 $0.500 $1.030 $2.000 $1.000 $2.100
ELIM EXT PAV MRK & MRKS (12")
LF 132.000 $1.750 $3.090 $3.000 $3.000 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 15.000 $3.850 $5.200 $4.000 $5.000 $4.200
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $65.000 $78.000 $100.000 $75.000 $104.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $115.000 $104.000 $100.000 $100.000 $104.000
PAV SURF PREP FOR MRK (4")
LF 1,556.000 $0.150 $1.030 $0.500 $1.000 $0.020
PAV SURF PREP FOR MRK (12")
LF 132.000 $0.600 $0.840 $1.000 $0.800 $0.350
PAV SURF PREP FOR MRK (24")
LF 15.000 $1.050 $2.060 $1.000 $2.000 $0.680
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $20.000 $10.250 $14.000 $10.000 $15.500
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $20.000 $10.250 $16.000 $15.000 $17.500
FULL - WIDTH MOWING
CYC 2.000 $5,600.000 $1,550.000 $1,500.000 $3,600.000 $6,300.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 800.000 $25.000 $8.852 $10.000 $8.000 $9.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 8.000 $250.000 $120.000 $125.000 $200.000 $220.000
SP MIXES SP-C SAC-B PG70-22
TON 13,578.000 $110.000 $121.530 $137.500 $114.500 $129.500
TACK COAT
GAL 10,642.000 $3.750 $0.010 $0.010 $4.500 $1.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,000.000 $2,900.000 $4,600.000 $3,031.000 $7,500.000
TMA (STATIONARY)
DAY 68.000 $145.000 $1.000 $1.000 $304.880 $210.000
TMA (MOBILE OPERATION)
DAY 25.000 $300.000 $1.000 $1.000 $811.720 $250.000
Totals: $2,609,160.350 $2,748,754.005 $2,787,452.580 $2,939,014.853 $3,029,268.180