Show Job Controls
Bid Cobra

ROCKWALL SH 205 (0451-01-055)

Items: 83

County: ROCKWALL
Length: N/A
Highway: SH 205
District: DALLAS
Control Number: 0451-01-055
DBE Goal: N/A
Project: C 451-1-55
Guaranty: N/A
Time: 88 WORKING DAYS
Engineer's Estimate: $7,233,818.39
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY, PAVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$7,233,818.39
$6,382,562.98
Over/Under Est: -11.77% -$851,255.41
Over/Under Est: -10.43% -$754,379.66
Amt Left: 1.52% $96,875.75
Over/Under Est: -4.39% -$317,210.14
Amt Left: 8.37% $534,045.27
Delta: -6.75% -$437,169.52
Over/Under Est: 0.04% $3,099.44
Amt Left: 13.39% $854,354.85
Delta: -4.63% -$320,309.58
$8,029,214.49
Over/Under Est: 11% $795,396.10
Amt Left: 25.8% $1,646,651.51
Delta: -10.95% -$792,296.66
$8,561,759.45
Over/Under Est: 18.36% $1,327,941.06
Amt Left: 34.14% $2,179,196.47
Delta: -6.63% -$532,544.96

Bid Items & Bid Tabulations

83 Total 0 of 83
ROCKWALL  |  SH 205  |  DALLAS  |  0451-01-055  |  06/05/2020  |  $7,233,818.39  |  C 451-1-55  |  FLEXIBLE PAVMT REPAIR, MILL, OVERLAY...  |  88 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
FOUTSCO PAVING COMPANY, LLC
PEACHTREE CONSTRUCTION, LTD.
AUSTIN BRIDGE & ROAD SERVICES, LP
RK HALL, LLC
FNH CONSTRUCTION, LLC
REMOVING CONCRETE(MOW STRIP)
LF 840.000 $11.620 $16.000 $20.000 $16.000 $25.000 $13.620 $50.000
BACKFILL (TY A OR B)
STA 736.000 $145.000 $183.000 $80.000 $350.000 $210.000 $211.730 $250.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 42,642.000 $0.120 $0.130 $0.010 $0.170 $1.630 $0.130 $0.250
VEGETATIVE WATERING
MG 6,343.000 $9.000 $0.010 $0.010 $20.500 $1.000 $40.720 $25.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 12,014.000 $80.000 $82.000 $75.000 $85.500 $100.000 $100.910 $93.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 210,293.000 $2.000 $1.700 $1.100 $1.800 $2.150 $1.940 $4.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 100.000 $200.000 $210.000 $230.000 $220.000 $304.430 $254.240 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 146.000 $475.000 $550.000 $470.000 $550.000 $680.330 $572.780 $500.000
MOBILIZATION
LS 1.000 $677,617.130 $405,374.000 $600,000.000 $500,000.000 $723,200.000 $380,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,500.000 $37,000.000 $3,000.000 $7,500.000 $40,000.000 $11,620.170 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,274.000 $2.300 $2.050 $1.000 $1.900 $3.130 $2.240 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,274.000 $0.570 $0.720 $0.750 $0.450 $0.750 $0.780 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 600.000 $3.000 $4.650 $5.000 $5.000 $5.010 $5.100 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $0.890 $0.820 $0.750 $1.000 $0.750 $0.900 $9.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 126,295.000 $0.130 $0.110 $0.100 $0.170 $0.100 $0.210 $0.150
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 63,298.000 $0.180 $0.110 $0.100 $0.220 $0.100 $0.230 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 3,700.000 $21.000 $18.000 $17.000 $18.500 $16.900 $19.320 $25.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,200.000 $1,200.000 $1,125.000 $1,250.000 $1,125.000 $1,204.000 $1,850.000
SHORT RADIUS
LF 100.000 $33.000 $21.000 $20.000 $21.000 $19.600 $40.320 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,175.000 $1,250.000 $1,160.000 $1,250.000 $1,160.000 $1,085.280 $1,850.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 2.000 $26.000 $925.000 $850.000 $900.000 $850.000 $1,568.000 $1,000.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 150.000 $55.000 $51.000 $50.000 $51.000 $47.000 $64.960 $50.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 12.000 $1,671.670 $2,050.000 $1,525.000 $1,650.000 $1,525.000 $1,790.880 $2,850.000
REMOVE METAL BEAM GUARD FENCE
LF 3,275.000 $2.700 $1.900 $1.750 $1.900 $1.750 $2.800 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $200.000 $188.000 $175.000 $190.000 $175.000 $252.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 51.000 $2,600.000 $2,700.000 $2,500.000 $2,750.000 $2,480.000 $2,738.400 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 51.000 $270.000 $235.000 $220.000 $240.000 $220.000 $308.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 121.000 $476.000 $435.000 $500.000 $420.000 $487.000 $545.440 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $600.000 $580.000 $600.000 $550.000 $579.000 $648.480 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $710.000 $720.000 $750.000 $700.000 $779.000 $872.480 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $815.000 $950.000 $800.000 $950.000 $811.000 $908.320 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 13.000 $836.240 $1,000.000 $900.000 $960.000 $936.000 $1,048.320 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 24.000 $1,025.000 $865.000 $900.000 $840.000 $969.000 $1,085.280 $850.000
REMOVE SM RD SN SUP&AM
EA 172.000 $113.000 $79.000 $70.000 $78.000 $65.000 $72.800 $250.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 84.000 $95.000 $48.000 $50.000 $66.000 $45.500 $71.680 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 84.000 $20.000 $10.850 $10.000 $15.500 $10.000 $16.800 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 137.000 $33.000 $35.750 $30.000 $34.000 $33.000 $16.800 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 18.000 $20.000 $21.000 $20.000 $16.000 $22.000 $16.800 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,000.000 $1.190 $1.050 $0.700 $2.000 $2.000 $1.610 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 18,916.000 $1.000 $1.050 $0.750 $2.000 $1.420 $1.610 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,583.000 $1.000 $0.790 $0.750 $0.800 $0.970 $0.840 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 500.000 $6.630 $6.450 $6.000 $6.500 $5.000 $6.720 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 45.000 $250.000 $125.000 $120.000 $125.000 $120.000 $134.400 $150.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $175.000 $210.000 $200.000 $210.000 $240.000 $224.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 45.000 $145.000 $146.000 $140.000 $150.000 $140.000 $156.800 $250.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 3.000 $1,045.000 $580.000 $555.000 $600.000 $600.000 $621.600 $700.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 3.000 $270.000 $210.000 $200.000 $210.000 $100.000 $224.000 $250.000
PAVEMENT SEALER 4"
LF 6,132.000 $0.120 $0.210 $0.200 $0.210 $0.150 $0.220 $0.500
PAVEMENT SEALER 8"
LF 1,555.000 $0.200 $0.520 $0.500 $0.550 $0.350 $0.560 $1.000
PAVEMENT SEALER 24"
LF 144.000 $2.600 $3.100 $3.000 $3.250 $1.000 $3.360 $4.000
PAVEMENT SEALER (ARROW)
EA 11.000 $26.000 $72.000 $70.000 $75.000 $20.000 $78.400 $100.000
PAVEMENT SEALER (WORD)
EA 10.000 $35.000 $72.000 $70.000 $75.000 $30.000 $78.400 $100.000
PAVEMENT SEALER (MED NOSE)
EA 3.000 $110.000 $205.000 $200.000 $210.000 $20.000 $224.000 $250.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $80.000 $205.000 $200.000 $210.000 $55.000 $224.000 $250.000
PAVEMENT SEALER (RR XING)
EA 3.000 $120.000 $205.000 $200.000 $210.000 $175.000 $224.000 $250.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 230.000 $0.480 $1.040 $1.000 $1.050 $1.000 $1.120 $1.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 109,099.000 $0.430 $0.370 $0.360 $0.390 $0.370 $0.400 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 32,411.000 $0.500 $0.580 $0.560 $0.580 $0.500 $0.630 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 9,730.000 $0.450 $0.370 $0.360 $0.380 $0.450 $0.400 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 117,488.000 $0.440 $0.370 $0.360 $0.390 $0.370 $0.400 $0.500
REFL PAV MRKR TY I-C
EA 339.000 $3.800 $3.300 $3.200 $3.400 $4.000 $3.580 $5.000
REFL PAV MRKR TY II-A-A
EA 6,318.000 $3.800 $3.300 $3.200 $3.400 $4.000 $3.580 $5.000
REFL PAV MRKR TY II-C-R
EA 120.000 $5.700 $4.200 $4.000 $4.200 $4.000 $4.480 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 4,440.000 $0.410 $0.470 $0.450 $0.470 $0.400 $0.500 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 1,555.000 $1.000 $0.620 $0.600 $0.650 $0.800 $0.670 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 144.000 $3.200 $3.100 $3.000 $3.200 $1.250 $3.360 $4.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 7.000 $43.000 $52.000 $50.000 $53.000 $45.000 $56.000 $100.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 3.000 $330.000 $205.000 $200.000 $210.000 $165.000 $224.000 $250.000
ELIM EXT PAV MRK & MRKS (MED NOSE)
EA 3.000 $52.000 $205.000 $200.000 $210.000 $55.000 $224.000 $250.000
PAV SURF PREP FOR MRK (4")
LF 11,372.000 $0.130 $0.110 $0.100 $0.110 $0.150 $0.110 $0.500
PAV SURF PREP FOR MRK (8")
LF 1,555.000 $0.300 $0.110 $0.100 $0.110 $0.300 $0.110 $0.500
PAV SURF PREP FOR MRK (24")
LF 144.000 $1.200 $1.040 $1.000 $1.100 $0.450 $1.120 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 10.000 $32.500 $52.000 $50.000 $53.000 $25.000 $56.000 $100.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $40.000 $52.000 $200.000 $53.000 $40.000 $56.000 $100.000
PAV SURF PREP FOR MRK (WORD)
EA 10.000 $40.000 $52.000 $50.000 $53.000 $35.000 $56.000 $100.000
PAV SURF PREP FOR MRK (RR XING)
EA 3.000 $75.000 $155.000 $150.000 $160.000 $75.000 $168.000 $250.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 3.000 $35.000 $105.000 $100.000 $105.000 $35.000 $112.000 $250.000
FULL - WIDTH MOWING
CYC 2.000 $2,500.000 $1,475.000 $2,000.000 $17,500.000 $10,000.000 $9,527.510 $5,000.000
SP MIXES SP-C SAC-A PG70-22
TON 40,040.000 $100.000 $88.000 $96.000 $89.900 $86.500 $110.770 $98.000
TACK COAT
GAL 40,040.000 $3.500 $0.001 $2.500 $2.900 $2.500 $4.670 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $6,000.000 $10,000.000 $12,500.000 $20,000.000 $18,453.510 $16,500.000
TMA (STATIONARY)
DAY 88.000 $135.000 $280.000 $100.000 $225.000 $288.000 $392.020 $350.000
TMA (MOBILE OPERATION)
HR 80.000 $45.000 $52.000 $1.000 $60.000 $100.000 $107.680 $85.000
Totals: $7,233,818.390 $6,382,562.980 $6,479,438.730 $6,916,608.250 $7,236,917.830 $8,029,214.490 $8,561,759.450