Show Job Controls
Bid Cobra

ROBERTSON SH0007 (6342-89-001)

Items: 42

County: ROBERTSON
Length: N/A
Highway: SH0007
District: BRYAN
Control Number: 6342-89-001
DBE Goal: N/A
Project: RMC - 634289001
Guaranty: N/A
Time: 61 W
Engineer's Estimate: $4,052,023.73
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: HMA OVERLAY, RETROFIT BRIDGE RAIL & MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$4,052,023.73
$3,988,300.81
Over/Under Est: -1.57% -$63,722.92
Over/Under Est: 3.34% $135,290.00
Amt Left: 4.99% $199,012.92
Over/Under Est: 30.42% $1,232,682.41
Amt Left: 32.51% $1,296,405.33
Delta: -26.21% -$1,097,392.41
Over/Under Est: 44.94% $1,821,112.40
Amt Left: 47.26% $1,884,835.32
Delta: -11.13% -$588,429.99

Bid Items & Bid Tabulations

42 Total 0 of 42
ROBERTSON  |  SH0007  |  BRYAN  |  6342-89-001  |  04/02/2019  |  $4,052,023.73  |  RMC - 634289001  |  HMA OVERLAY, RETROFIT BRIDGE RAIL &...  |  61 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING STAB BASE AND ASPH PAV (5")
SY 12,368.000 $3.500 $5.600 $5.000 $3.300 $8.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 130.000 $25.000 $49.100 $40.000 $26.000 $120.000
BACKFILL (TY A OR B)
STA 332.000 $150.000 $40.250 $125.000 $190.000 $150.000
PRIME COAT (EC-30)
GAL 3,711.000 $4.000 $3.650 $4.000 $4.350 $3.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 62,746.000 $2.800 $3.750 $3.250 $3.850 $4.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 1,288.000 $130.000 $106.200 $115.000 $122.000 $135.000
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 26,498.000 $64.000 $71.200 $77.000 $104.000 $120.000
SUPERPAVE MIXTURES SP-B SAC-B PG64-22
TON 3,402.000 $75.000 $67.500 $75.000 $120.000 $135.000
PLANE ASPH CONC PAV(0" TO 3")
SY 160,885.000 $2.000 $2.650 $2.000 $2.400 $2.000
RIPRAP (MOW STRIP)(4 IN)
CY 477.000 $400.000 $395.000 $475.000 $605.000 $680.000
CLEANING AND SEALING EXISTING JOINTS
LF 168.000 $60.000 $56.850 $75.000 $60.200 $50.000
RETROFIT RAIL (TY T131RC)
LF 390.000 $170.000 $257.350 $250.000 $142.000 $250.000
MOBILIZATION
LS 1.000 $367,449.430 $103,525.000 $200,000.000 $253,675.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,000.000 $17,350.000 $7,500.000 $975.000 $2,700.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,675.000 $3.500 $1.500 $2.000 $1.400 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,675.000 $1.500 $0.100 $0.250 $0.600 $0.500
INTERSECTIONS (ACP)
SY 2,131.000 $30.000 $15.100 $17.000 $24.000 $34.000
DRIVEWAYS (ACP)
SY 498.000 $40.000 $33.600 $17.000 $24.000 $41.000
DRIVEWAYS (SURF TREAT)
SY 352.000 $35.000 $23.500 $17.000 $33.000 $38.000
DRIVEWAYS (BASE)
SY 1,093.000 $60.000 $9.350 $15.000 $10.000 $17.000
RUMBLE STRIPS (SHOULDER)
LF 65,095.000 $0.200 $0.140 $0.180 $0.270 $0.190
RUMBLE STRIPS (CENTERLINE)
LF 32,734.000 $0.200 $0.180 $0.300 $0.290 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 7,075.000 $20.000 $20.250 $20.000 $19.600 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,685.000 $2,000.000 $1,325.000 $1,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 22.000 $1,100.000 $1,240.000 $1,200.000 $995.000 $720.000
REMOVE METAL BEAM GUARD FENCE
LF 6,525.000 $3.000 $3.150 $3.000 $3.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 35.000 $240.000 $368.000 $350.000 $110.000 $180.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,200.000 $2,870.000 $2,800.000 $2,625.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 17.000 $240.000 $370.000 $400.000 $225.000 $270.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 379.000 $20.000 $25.260 $25.000 $21.000 $40.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 66,623.000 $0.200 $0.120 $0.110 $0.110 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,590.000 $0.120 $0.200 $0.190 $0.190 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 22,030.000 $0.180 $0.190 $0.180 $0.180 $0.190
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 848.000 $1.000 $1.000 $1.000 $1.250 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 555.000 $6.000 $7.050 $7.000 $6.700 $7.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 66,623.000 $0.300 $0.370 $0.350 $0.350 $0.370
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,590.000 $0.500 $0.390 $0.370 $0.370 $0.390
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 22,030.000 $0.300 $0.380 $0.360 $0.360 $0.380
REFL PAV MRKR TY II-A-A
EA 848.000 $2.000 $5.260 $5.000 $5.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $9,000.000 $2,500.000 $4,000.000 $19,800.000 $5,000.000
TMA (STATIONARY)
EA 3.000 $12,000.000 $25.000 $5,000.000 $21,600.000 $7,500.000
TMA (MOBILE OPERATION)
HR 760.000 $65.000 $45.000 $50.000 $25.500 $35.000
Totals: $4,052,023.730 $3,988,300.810 $4,187,313.730 $5,284,706.140 $5,873,136.130