PREPARING ROW
|
STA
|
293.000
|
$3,200.000
|
$500.000
|
$281.000
|
$500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
174.000
|
$28.500
|
$25.000
|
$53.000
|
$35.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
84,336.000
|
$5.000
|
$5.000
|
$4.560
|
$7.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,813.000
|
$17.000
|
$19.000
|
$30.250
|
$44.250
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,060.000
|
$30.000
|
$19.000
|
$2.600
|
$10.190
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
54,207.000
|
$1.500
|
$1.000
|
$2.760
|
$1.100
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
54,207.000
|
$0.200
|
$0.250
|
$0.240
|
$0.240
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
27,106.000
|
$0.170
|
$0.200
|
$0.210
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
27,106.000
|
$0.170
|
$0.200
|
$0.210
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
543.000
|
$15.000
|
$20.000
|
$40.000
|
$40.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
115,084.000
|
$36.000
|
$17.000
|
$15.340
|
$18.400
|
|
|
CEMENT
|
TON
|
2,913.000
|
$225.000
|
$300.000
|
$276.000
|
$280.000
|
|
|
CEMENT TREAT (EXIST MATL) (10")
|
SY
|
119,790.000
|
$2.500
|
$2.500
|
$2.330
|
$2.750
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
115,084.000
|
$2.770
|
$2.500
|
$2.660
|
$2.650
|
|
|
ASPH (RC-250)
|
GAL
|
24,164.000
|
$6.330
|
$4.500
|
$4.900
|
$5.400
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
881.000
|
$159.000
|
$100.000
|
$221.700
|
$145.000
|
|
|
CEM STABIL BKFL
|
CY
|
61.000
|
$210.000
|
$250.000
|
$235.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
32.000
|
$25.000
|
$25.000
|
$24.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
150.000
|
$108.000
|
$50.000
|
$118.000
|
$100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
50.000
|
$296.000
|
$400.000
|
$375.000
|
$295.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
88.000
|
$650.000
|
$650.000
|
$941.000
|
$750.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
20.000
|
$220.000
|
$450.000
|
$194.000
|
$155.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
167.000
|
$220.000
|
$300.000
|
$294.000
|
$225.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
38.000
|
$610.000
|
$650.000
|
$1,058.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,589.000
|
$90.000
|
$90.000
|
$76.470
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
98.000
|
$115.000
|
$120.000
|
$176.460
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$260.000
|
$240.000
|
$235.280
|
$200.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
8.000
|
$300.000
|
$340.000
|
$411.740
|
$350.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
11.000
|
$450.000
|
$500.000
|
$529.380
|
$450.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,000.000
|
$8,700.000
|
$8,235.000
|
$7,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
|
EA
|
1.000
|
$10,000.000
|
$14,000.000
|
$12,940.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
1.000
|
$10,515.000
|
$7,500.000
|
$14,117.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
1.000
|
$18,500.000
|
$15,000.000
|
$21,763.000
|
$15,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,003.000
|
$1,200.000
|
$1,059.000
|
$900.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,300.000
|
$1,400.000
|
$1,176.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
108.000
|
$1,350.000
|
$1,400.000
|
$1,176.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$1,600.000
|
$1,412.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
14.000
|
$1,783.000
|
$2,000.000
|
$1,765.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,400.000
|
$2,200.000
|
$2,941.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,183.000
|
$2,200.000
|
$2,941.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,700.000
|
$3,000.000
|
$4,117.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,900.000
|
$3,250.000
|
$4,117.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,500.000
|
$3,750.000
|
$5,882.000
|
$5,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$5,200.000
|
$5,000.000
|
$6,470.000
|
$5,500.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
68.000
|
$920.000
|
$1,500.000
|
$2,015.000
|
$1,900.000
|
|
|
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
|
LF
|
71.000
|
$1,215.000
|
$1,700.000
|
$2,265.750
|
$1,900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
16.000
|
$2,500.000
|
$3,000.000
|
$2,353.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$1,275.000
|
$2,000.000
|
$1,176.000
|
$800.000
|
|
|
REMOV STR (SET)
|
EA
|
108.000
|
$570.000
|
$500.000
|
$990.000
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
37.000
|
$44.800
|
$50.000
|
$58.800
|
$50.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
54.000
|
$675.000
|
$500.000
|
$1,764.600
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$877,696.000
|
$905,000.000
|
$746,700.000
|
$1,059,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$10,000.000
|
$5,000.000
|
$22,500.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
5,160.000
|
$42.000
|
$38.000
|
$40.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,160.000
|
$12.200
|
$12.000
|
$11.760
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,020.000
|
$4.000
|
$4.250
|
$4.410
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,020.000
|
$1.000
|
$1.500
|
$1.470
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,610.000
|
$7.000
|
$7.500
|
$7.650
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,610.000
|
$1.500
|
$2.000
|
$1.760
|
$1.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
140.000
|
$145.000
|
$115.000
|
$205.870
|
$175.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,695.000
|
$55.000
|
$40.000
|
$91.500
|
$80.000
|
|
|
TURNOUTS (ACP)
|
SY
|
475.000
|
$60.000
|
$40.000
|
$88.420
|
$40.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
57,410.000
|
$0.350
|
$0.200
|
$0.210
|
$0.170
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,080.000
|
$0.400
|
$0.200
|
$0.270
|
$0.220
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
587.500
|
$31.000
|
$40.000
|
$25.880
|
$35.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,647.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
750.000
|
$3.000
|
$7.500
|
$5.880
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,300.000
|
$4,000.000
|
$3,412.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$280.000
|
$750.000
|
$588.000
|
$400.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
376.000
|
$10.000
|
$25.000
|
$27.400
|
$50.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
28.000
|
$358.000
|
$275.000
|
$264.700
|
$225.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$585.000
|
$300.000
|
$306.000
|
$260.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
5.000
|
$4,985.000
|
$10,000.000
|
$7,105.000
|
$4,900.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
590.000
|
$12.800
|
$25.000
|
$22.180
|
$21.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
270.000
|
$22.000
|
$40.000
|
$32.730
|
$85.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,580.000
|
$2.500
|
$5.000
|
$2.940
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
8.000
|
$1,450.000
|
$2,500.000
|
$1,714.000
|
$2,200.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$8,000.000
|
$7,500.000
|
$7,501.000
|
$6,200.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$30.500
|
$50.000
|
$36.000
|
$65.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
30.000
|
$875.000
|
$600.000
|
$618.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$775.000
|
$650.000
|
$682.000
|
$580.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,050.000
|
$1,000.000
|
$1,000.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,100.000
|
$1,100.000
|
$1,059.000
|
$900.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$420.000
|
$100.000
|
$85.000
|
$70.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
39.000
|
$125.000
|
$120.000
|
$118.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$40.000
|
$40.000
|
$29.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
3.000
|
$115.000
|
$100.000
|
$75.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
154.000
|
$150.000
|
$120.000
|
$100.000
|
$85.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
|
EA
|
2.000
|
$400.000
|
$500.000
|
$440.000
|
$375.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
2.000
|
$465.000
|
$500.000
|
$440.000
|
$375.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
58,286.000
|
$0.400
|
$0.250
|
$0.330
|
$0.180
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
72.000
|
$5.300
|
$5.000
|
$4.710
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
116,572.000
|
$0.400
|
$0.250
|
$0.330
|
$0.190
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
144.000
|
$11.000
|
$25.000
|
$12.940
|
$20.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,186.000
|
$1.500
|
$1.500
|
$2.350
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
30.000
|
$1.900
|
$3.000
|
$2.350
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
420.000
|
$1.750
|
$1.500
|
$1.820
|
$0.900
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
57,610.000
|
$0.700
|
$0.700
|
$0.720
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,910.000
|
$0.720
|
$1.000
|
$0.710
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
26,980.000
|
$0.720
|
$0.900
|
$0.710
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
180.000
|
$22.000
|
$20.000
|
$23.530
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$325.000
|
$350.000
|
$324.000
|
$305.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$325.000
|
$450.000
|
$324.000
|
$410.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
22.000
|
$7.700
|
$12.000
|
$7.240
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
804.000
|
$6.000
|
$6.000
|
$7.230
|
$5.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$8,200.000
|
$12,000.000
|
$7,180.000
|
$11,200.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$832.000
|
$1,500.000
|
$844.000
|
$750.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
12,260.000
|
$108.750
|
$115.000
|
$142.270
|
$165.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,764.000
|
$10,000.000
|
$16,900.000
|
$24,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$15.000
|
$25.000
|
$10.000
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
122.000
|
$215.000
|
$300.000
|
$618.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$420.000
|
$600.000
|
$975.000
|
$400.000
|
|
Totals: |
$11,938,892.340
|
$9,087,362.650
|
$9,956,344.990
|
$11,007,410.690
|