Show Job Controls
Bid Cobra

ROBERTSON CS (0917-18-085)

Items: 43

County: ROBERTSON
Length: N/A
Highway: CS
District: BRYAN
Control Number: 0917-18-085
DBE Goal: N/A
Project: BR 2021(236)
Guaranty: N/A
Time: 159 WORKING DAYS
Engineer's Estimate: $731,249.37
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$731,249.37
$722,351.41
Over/Under Est: -1.22% -$8,897.96
Over/Under Est: 8.7% $63,609.58
Amt Left: 10.04% $72,507.54
Over/Under Est: 21.09% $154,192.93
Amt Left: 22.58% $163,090.89
Delta: -11.40% -$90,583.35
Over/Under Est: 33.66% $246,138.94
Amt Left: 35.31% $255,036.90
Delta: -10.38% -$91,946.01
Subcontractor Percentage Amount
TEXAS SHAFTS, INC. 12.37% $89,354.88
BRAZOS PAVING, INC. 3.89% $28,099.47
ROADWAY SPECIALTIES, INC. 3.36% $24,271.01
CEN TEX HYDROSEED, INC. 2.36% $17,047.49
AWP SAFETY 0.84% $6,067.75
Total: 22.82% $164,840.60

Bid Items & Bid Tabulations

43 Total 0 of 43
ROBERTSON  |  CS  |  BRYAN  |  0917-18-085  |  05/05/2023  |  $731,249.37  |  BR 2021(236)  |  BRIDGE REPL  |  159 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUQUA CONSTRUCTION CO., INC.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 3.700 $6,700.000 $294.590 $3,000.000 $10,000.000 $7,000.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 5.000 $1,832.000 $327.000 $1,200.000 $750.000 $1,000.000
REMOVING CONC (CURB)
LF 175.000 $27.000 $5.450 $15.000 $19.000 $20.000
EXCAVATION (ROADWAY)
CY 300.000 $35.000 $13.080 $44.000 $63.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 25.000 $50.000 $16.350 $44.000 $340.000 $50.000
BLOCK SODDING
SY 1,128.000 $11.000 $5.995 $6.000 $6.000 $10.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 282.000 $0.900 $5.450 $5.000 $5.000 $4.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 282.000 $0.500 $5.450 $5.000 $5.000 $4.000
VEGETATIVE WATERING
MG 16.310 $72.000 $109.000 $95.000 $30.000 $1.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 70.000 $55.000 $27.250 $139.000 $218.000 $80.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 910.000 $4.600 $5.450 $10.000 $9.000 $20.000
CEM STABIL BKFL
CY 44.000 $90.000 $87.200 $305.000 $210.000 $350.000
DRILL SHAFT (30 IN)
LF 300.000 $275.000 $352.768 $425.000 $470.000 $315.000
CL C CONC (ABUT)
CY 50.000 $1,000.000 $1,308.000 $1,250.000 $1,500.000 $1,200.000
REINF CONC SLAB
SF 1,832.000 $20.000 $32.700 $30.000 $42.000 $38.000
APPROACH SLAB
CY 40.000 $700.000 $527.560 $720.000 $750.000 $900.000
SHEAR KEY
CY 19.000 $400.000 $545.000 $410.000 $430.000 $600.000
PRESTR CONC BOX BEAM (4B28)
LF 278.000 $260.000 $401.026 $350.000 $304.000 $500.000
PRESTR CONC BOX BEAM (5B28)
LF 139.000 $280.000 $401.022 $350.000 $304.000 $500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 227.000 $300.000 $165.680 $134.000 $197.000 $200.000
RIPRAP (MOW STRIP)(5 IN)
CY 24.500 $636.000 $357.520 $685.000 $770.000 $600.000
RAIL (TY T223)
LF 180.000 $120.000 $130.800 $160.000 $180.000 $180.000
ARMOR JOINT (SEALED)
LF 45.000 $140.000 $122.712 $175.000 $160.000 $180.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $27,000.000 $27,250.000 $38,000.000 $32,000.000 $80,000.000
REMOVE STR (RAIL)
LF 50.000 $14.500 $27.250 $30.000 $70.000 $160.000
MOBILIZATION
LS 1.000 $73,313.000 $90,000.000 $79,000.000 $85,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,000.000 $887.227 $1,250.000 $1,000.000 $7,375.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 90.000 $40.000 $32.700 $32.000 $30.000 $1.000
ROCK FILTER DAMS (REMOVE)
LF 90.000 $12.000 $10.900 $10.000 $10.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 745.000 $5.000 $4.905 $8.500 $4.500 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 745.000 $1.650 $1.635 $1.500 $1.500 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $32.000 $31.675 $34.000 $30.000 $30.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,400.000 $1,145.078 $1,250.000 $1,100.000 $1,600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,759.061 $3,750.000 $3,500.000 $3,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $845.000 $1,035.500 $1,200.000 $1,100.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $37.000 $14.900 $17.000 $14.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $41.000 $14.900 $17.000 $14.000 $30.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 4.000 $62.500 $53.857 $60.000 $50.000 $100.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 740.000 $0.600 $2.671 $6.500 $6.000 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 740.000 $0.600 $2.671 $6.500 $6.000 $3.000
REFL PAV MRKR TY II-A-A
EA 186.000 $11.000 $8.720 $6.000 $14.000 $10.000
SP MIXES SP-C PG64-22
TON 105.000 $230.000 $152.600 $225.000 $300.000 $200.000
UNDERSEAL COURSE
GAL 200.000 $20.000 $5.450 $5.000 $12.000 $50.000
Totals: $731,249.370 $722,351.459 $794,858.950 $885,442.300 $977,388.310