Show Job Controls
Bid Cobra

ROBERTSON US 79 (0205-02-070)

Items: 136

County: ROBERTSON
Length: N/A
Highway: US 79
District: BRYAN
Control Number: 0205-02-070
DBE Goal: N/A
Project: STP 2B23(025)HES
Guaranty: N/A
Time: 208 WORKING DAYS
Engineer's Estimate: $3,626,219.72
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,626,219.72
$4,456,784.39
Over/Under Est: 22.9% $830,564.67
Over/Under Est: 25.35% $919,180.63
Amt Left: 1.99% $88,615.96
$4,627,463.24
Over/Under Est: 27.61% $1,001,243.52
Amt Left: 3.83% $170,678.85
Delta: -1.81% -$82,062.89
Over/Under Est: 30.69% $1,113,005.73
Amt Left: 6.34% $282,441.06
Delta: -2.42% -$111,762.21
Subcontractor Percentage Amount
STRIPE LINES, INC. 2.29% $103,527.93
CEN TEX HYDROSEED, INC. 1.16% $52,442.10
AWP SAFETY 0.48% $21,700.18
WILLOW CITY SIGN & RAIL, INC. 0.25% $11,302.18
SARVICUS LLC 0.07% $3,164.61
PROFESSIONAL TRAFFIC CONTROL LLC 0.06% $2,712.52
Total: 4.31% $194,849.52

Bid Items & Bid Tabulations

136 Total 0 of 136
ROBERTSON  |  US 79  |  BRYAN  |  0205-02-070  |  08/02/2023  |  $3,626,219.72  |  STP 2B23(025)HES  |  WIDEN ROAD - ADD LANES  |  208 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
TEXAS MATERIALS GROUP, INC.
BRAZOS PAVING, INC.
BIG CREEK CONSTRUCTION, LTD.
PREPARING ROW
STA 34.000 $975.000 $530.000 $4,400.000 $660.000 $5,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 11.000 $850.000 $460.000 $1,000.000 $1,330.000 $446.500
REMOVING CONC (PAV)
SY 601.000 $10.500 $13.000 $25.000 $25.000 $14.000
REMOVING CONC (MEDIANS)
SY 11.000 $24.700 $13.000 $74.000 $163.000 $285.000
REMOVING CONC (SIDEWALKS)
SY 4.000 $17.290 $13.000 $70.000 $135.000 $264.500
REMOVING CONC (DRIVEWAYS)
SY 284.000 $17.500 $13.000 $27.000 $64.000 $22.000
REMOVING CONC (CURB)
LF 74.000 $12.000 $6.750 $33.000 $15.000 $19.000
REMOVING CONC (CURB AND GUTTER)
LF 507.000 $7.920 $9.000 $9.000 $12.000 $7.500
REMOVING CONC (MISC)
SY 4.000 $10.500 $13.000 $70.000 $119.500 $518.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 1,647.000 $3.590 $13.000 $13.000 $14.500 $5.500
REMOVING STAB BASE & ASPH PAV(13"-18")
SY 6,513.000 $15.000 $17.000 $19.000 $17.600 $13.500
EXCAVATION (ROADWAY)
CY 6,683.000 $12.000 $25.000 $21.000 $16.000 $24.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,657.000 $15.000 $29.000 $21.000 $18.000 $28.500
FURNISHING AND PLACING TOPSOIL (4")
SY 18,103.000 $1.520 $1.500 $2.000 $4.750 $2.000
BLOCK SODDING
SY 632.000 $4.010 $8.000 $6.000 $7.300 $7.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 17,471.000 $0.470 $0.750 $0.580 $0.720 $0.750
CELL FBR MLCH SEED(TEMP)(WARM)
SY 8,739.000 $0.420 $0.750 $0.580 $0.720 $0.750
CELL FBR MLCH SEED(TEMP)(COOL)
SY 8,739.000 $0.430 $0.750 $0.580 $0.720 $0.750
VEGETATIVE WATERING
MG 181.100 $12.000 $33.000 $30.000 $97.500 $77.500
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 1,137.000 $2.500 $6.250 $4.750 $5.800 $6.000
FL BS (CMP IN PLC)(TY A GR 1-2)(9")
SY 612.000 $22.510 $67.000 $39.000 $30.500 $31.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 4,851.000 $25.500 $28.000 $41.000 $25.950 $33.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 4,890.000 $25.000 $41.000 $30.000 $29.000 $36.000
FL BS(CMP IN PLC)(TY A GR 1-2)(8.5")
SY 3,182.000 $18.000 $34.000 $32.000 $21.900 $30.500
LIME (QUICKLIME (DRY))
TON 40.000 $300.000 $330.000 $300.000 $335.000 $342.000
LIME TRT (EXST MATL)(8")
SY 4,500.000 $12.000 $7.750 $6.000 $12.000 $5.500
CEMENT
TON 126.000 $250.000 $310.000 $254.000 $285.000 $300.000
CEMENT TREAT (SUBGRADE) (8")
SY 8,684.000 $4.230 $6.000 $4.400 $11.650 $9.000
CEMENT TREAT (SUBGRADE)(6")
SY 4,851.000 $4.790 $4.250 $6.000 $13.200 $12.000
PRIME COAT (MC-30 OR EC-30)
GAL 3,388.000 $1.980 $6.500 $7.000 $7.550 $6.000
FLEX PAVEMENT STRUCTURE REPAIR(10"-24")
SY 2,500.000 $80.000 $96.000 $30.000 $97.700 $123.000
PLANE ASPH CONC PAV (2")
SY 33,997.000 $2.320 $3.000 $3.300 $5.600 $3.000
CUT & RESTORING PAV
SY 313.000 $104.220 $47.000 $50.000 $105.000 $48.500
RIPRAP (CONC)(4 IN)
CY 99.000 $550.000 $490.000 $730.000 $461.000 $574.500
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 15.000 $181.220 $190.000 $240.000 $259.850 $204.500
RIPRAP (STONE PROTECTION)(12 IN)
CY 60.000 $156.590 $190.000 $220.000 $247.500 $134.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.000 $638.170 $460.000 $730.000 $340.600 $879.000
RC PIPE (CL III)(18 IN)
LF 20.000 $90.000 $130.000 $194.000 $111.650 $146.000
RC PIPE (CL III)(24 IN)
LF 172.000 $105.000 $86.000 $170.000 $123.700 $130.500
RC PIPE (ARCH)(CL III)(DES 1)
LF 1,098.000 $196.000 $180.000 $215.000 $214.050 $208.000
MANH (COMPL)(PRM)(60IN)
EA 1.000 $6,944.400 $9,200.000 $10,000.000 $6,905.000 $7,648.000
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $6,670.550 $3,500.000 $8,000.000 $7,480.000 $5,947.000
SET (TY I) (24 IN) (4: 1) (C)
EA 1.000 $4,130.900 $2,000.000 $2,300.000 $10,000.000 $3,282.500
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,323.560 $3,400.000 $2,400.000 $3,400.000 $3,494.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,752.000 $4,400.000 $2,400.000 $3,785.000 $4,718.500
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 34.000 $2,025.090 $2,900.000 $2,700.000 $3,575.000 $3,722.500
CLEAN EXIST CULVERTS
EA 1.000 $2,872.380 $1,200.000 $2,200.000 $7,000.000 $4,158.000
REMOV STR (SET)
EA 43.000 $475.000 $360.000 $250.000 $960.000 $341.000
REMOV STR (PIPE)
LF 735.000 $20.370 $29.000 $22.000 $18.100 $5.500
MOBILIZATION
LS 1.000 $307,437.140 $385,000.000 $400,000.000 $342,868.000 $470,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $7,500.000 $1,600.000 $12,000.000 $6,625.000 $1,711.500
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 404.000 $41.000 $47.000 $36.000 $43.850 $45.500
ROCK FILTER DAMS (REMOVE)
LF 404.000 $12.350 $13.000 $10.000 $12.200 $12.500
CONSTRUCTION PERIMETER FENCE
LF 76.000 $2.570 $16.000 $5.000 $6.100 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 386.000 $4.470 $5.500 $8.000 $5.200 $5.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 386.000 $1.320 $1.250 $1.000 $1.200 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 460.000 $2.870 $5.250 $4.000 $4.900 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 48.000 $5.020 $6.500 $5.000 $6.100 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 508.000 $1.110 $1.250 $1.000 $1.200 $1.500
CONC CURB (TY II)
LF 74.000 $20.000 $9.750 $40.000 $42.900 $51.500
CONC CURB (MONO) (TY II)
LF 51.000 $25.000 $9.750 $55.000 $59.550 $74.500
CONC CURB & GUTTER (TY II)
LF 614.000 $25.340 $38.000 $33.000 $60.700 $36.000
DRIVEWAYS (CONC)
SY 371.000 $92.080 $120.000 $95.000 $113.700 $125.000
DRIVEWAYS (ACP)
SY 1,129.000 $53.080 $48.000 $78.000 $50.900 $84.500
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 5,633.000 $0.350 $0.750 $1.600 $0.350 $1.000
CONC MEDIAN
SY 19.000 $90.000 $170.000 $250.000 $304.500 $344.000
CONC DIRECTIONAL ISLAND
SY 174.000 $500.000 $150.000 $93.000 $88.850 $171.500
CONC MEDIAN(MONO NOSE)
SY 3.000 $375.000 $180.000 $160.000 $340.000 $1,235.000
MTL W-BEAM GD FEN (TIM POST)
LF 187.500 $25.850 $53.000 $35.000 $34.350 $33.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,588.930 $4,600.000 $1,000.000 $1,775.000 $2,142.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,388.860 $4,600.000 $3,000.000 $4,060.000 $3,780.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $458.790 $650.000 $800.000 $600.000 $729.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 12.000 $212.800 $300.000 $480.000 $275.000 $332.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $245.080 $310.000 $500.000 $290.000 $353.000
ALUMINUM SIGNS (TY A)
SF 9.000 $43.550 $20.000 $40.000 $18.300 $43.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $825.000 $860.000 $700.000 $790.000 $1,023.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $865.850 $1,100.000 $830.000 $975.000 $1,201.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $590.320 $730.000 $720.000 $675.000 $901.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $630.610 $780.000 $660.000 $725.000 $972.000
REMOVE SM RD SN SUP&AM
EA 4.000 $123.330 $150.000 $120.000 $140.000 $224.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $90.560 $99.000 $45.000 $91.400 $119.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 7.000 $38.690 $32.000 $45.000 $29.200 $39.000
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 1.000 $100.000 $640.000 $80.000 $590.000 $683.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 600.000 $0.620 $0.500 $0.380 $0.600 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 10,107.000 $0.390 $0.500 $0.380 $0.450 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 141.000 $0.750 $1.000 $0.780 $0.600 $0.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 5.000 $75.690 $99.000 $75.000 $183.000 $189.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 1.000 $80.300 $99.000 $75.000 $183.000 $189.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 14,868.000 $0.370 $0.500 $0.380 $0.450 $0.500
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 65.000 $4.460 $7.250 $5.600 $4.900 $5.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 337.000 $4.680 $7.250 $5.600 $4.900 $5.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 330.000 $5.180 $7.250 $5.600 $4.900 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 709.000 $3.600 $6.500 $5.000 $4.900 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 236.000 $3.680 $6.500 $5.000 $4.900 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,434.000 $1.500 $1.250 $1.400 $2.300 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,356.000 $1.500 $1.250 $1.400 $2.450 $1.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 306.000 $1.920 $1.500 $1.100 $2.450 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,387.000 $1.250 $1.500 $1.100 $2.450 $2.500
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 265.000 $4.370 $5.250 $4.000 $7.300 $7.500
REFL PAV MRK TY II (W) 6" (BRK)
LF 1,300.000 $0.330 $1.000 $0.780 $0.650 $0.650
REFL PAV MRK TY II (W) 6" (SLD)
LF 2,686.000 $0.170 $1.000 $0.780 $0.650 $0.650
REFL PAV MRK TY II (W) 8" (DOT)
LF 135.000 $2.000 $1.500 $1.100 $0.650 $0.650
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,692.000 $0.800 $1.500 $1.100 $0.650 $0.650
REFL PAV MRK TY II (W) (ARROW)
EA 3.000 $119.000 $140.000 $110.000 $122.000 $126.000
REFL PAV MRK TY II (W) (WORD)
EA 2.000 $143.660 $140.000 $110.000 $183.000 $189.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 2,756.000 $0.200 $1.000 $0.780 $0.650 $1.000
REFL PAV MRK TY II (Y) 12" (SLD)
LF 265.000 $1.070 $5.250 $4.000 $4.900 $5.000
REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)
LF 6,298.000 $1.000 $1.250 $0.900 $3.650 $4.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,290.000 $0.650 $1.250 $1.000 $2.450 $2.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 7,066.000 $0.610 $1.250 $1.000 $2.450 $2.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,315.000 $0.660 $1.250 $1.000 $1.850 $2.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 15,859.000 $0.610 $1.250 $1.000 $1.850 $2.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 24.000 $220.000 $360.000 $280.000 $396.000 $409.500
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $300.000 $360.000 $280.000 $580.000 $598.500
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 9.000 $46.740 $50.000 $38.000 $122.000 $126.000
REFL PAV MRKR TY I-C
EA 146.000 $6.550 $8.000 $6.200 $12.200 $12.500
REFL PAV MRKR TY II-A-A
EA 350.000 $4.000 $8.000 $6.200 $12.200 $12.500
REFL PAV MRKR TY II-C-R
EA 148.000 $4.500 $8.000 $6.200 $12.200 $12.500
ELIM EXT PAV MRK & MRKS (4")
LF 23,063.000 $0.450 $0.500 $0.320 $0.850 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 820.000 $1.150 $0.500 $0.380 $0.850 $1.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 7.000 $60.000 $72.000 $55.000 $122.000 $126.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $60.000 $72.000 $55.000 $122.000 $126.000
PAV SURF PREP FOR MRK (6")
LF 5,916.000 $0.050 $0.040 $0.030 $0.240 $0.500
PAV SURF PREP FOR MRK (8")
LF 1,710.000 $0.100 $0.070 $0.050 $0.350 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 3.000 $10.000 $33.000 $25.000 $61.000 $63.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $10.000 $33.000 $25.000 $61.000 $63.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 9.000 $13.070 $16.000 $12.000 $24.400 $25.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $5,000.000 $3,900.000 $4,000.000 $6,100.000 $12,348.000
TREE PROTECTION
EA 1.000 $500.000 $350.000 $275.000 $3,050.000 $2,293.000
SP MIXES SP-C SAC-B PG64-22
TON 4,654.000 $114.000 $160.000 $146.000 $134.900 $129.000
SP MIXES SP-C SAC-A PG70-22
TON 5,158.000 $128.000 $160.000 $169.000 $158.400 $140.000
TACK COAT
GAL 6,984.000 $3.320 $7.500 $4.000 $5.800 $7.000
HISTORICAL MARKER RELOCATION
EA 2.000 $1,000.000 $2,000.000 $650.000 $1,820.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $6,200.000 $15,000.000 $16,000.000 $9,450.000
TMA (STATIONARY)
DAY 107.000 $225.000 $200.000 $350.000 $240.000 $211.500
TMA (MOBILE OPERATION)
DAY 50.000 $500.000 $350.000 $350.000 $570.000 $831.500
Totals: $3,626,219.725 $4,456,784.390 $4,545,400.350 $4,627,463.245 $4,739,225.450