PREPARING ROW
|
STA
|
34.000
|
$975.000
|
$530.000
|
$4,400.000
|
$660.000
|
$5,000.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
11.000
|
$850.000
|
$460.000
|
$1,000.000
|
$1,330.000
|
$446.500
|
|
|
REMOVING CONC (PAV)
|
SY
|
601.000
|
$10.500
|
$13.000
|
$25.000
|
$25.000
|
$14.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
11.000
|
$24.700
|
$13.000
|
$74.000
|
$163.000
|
$285.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
4.000
|
$17.290
|
$13.000
|
$70.000
|
$135.000
|
$264.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
284.000
|
$17.500
|
$13.000
|
$27.000
|
$64.000
|
$22.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
74.000
|
$12.000
|
$6.750
|
$33.000
|
$15.000
|
$19.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
507.000
|
$7.920
|
$9.000
|
$9.000
|
$12.000
|
$7.500
|
|
|
REMOVING CONC (MISC)
|
SY
|
4.000
|
$10.500
|
$13.000
|
$70.000
|
$119.500
|
$518.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
1,647.000
|
$3.590
|
$13.000
|
$13.000
|
$14.500
|
$5.500
|
|
|
REMOVING STAB BASE & ASPH PAV(13"-18")
|
SY
|
6,513.000
|
$15.000
|
$17.000
|
$19.000
|
$17.600
|
$13.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,683.000
|
$12.000
|
$25.000
|
$21.000
|
$16.000
|
$24.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,657.000
|
$15.000
|
$29.000
|
$21.000
|
$18.000
|
$28.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
18,103.000
|
$1.520
|
$1.500
|
$2.000
|
$4.750
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
632.000
|
$4.010
|
$8.000
|
$6.000
|
$7.300
|
$7.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
17,471.000
|
$0.470
|
$0.750
|
$0.580
|
$0.720
|
$0.750
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
8,739.000
|
$0.420
|
$0.750
|
$0.580
|
$0.720
|
$0.750
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
8,739.000
|
$0.430
|
$0.750
|
$0.580
|
$0.720
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
181.100
|
$12.000
|
$33.000
|
$30.000
|
$97.500
|
$77.500
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
1,137.000
|
$2.500
|
$6.250
|
$4.750
|
$5.800
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2)(9")
|
SY
|
612.000
|
$22.510
|
$67.000
|
$39.000
|
$30.500
|
$31.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
4,851.000
|
$25.500
|
$28.000
|
$41.000
|
$25.950
|
$33.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
4,890.000
|
$25.000
|
$41.000
|
$30.000
|
$29.000
|
$36.000
|
|
|
FL BS(CMP IN PLC)(TY A GR 1-2)(8.5")
|
SY
|
3,182.000
|
$18.000
|
$34.000
|
$32.000
|
$21.900
|
$30.500
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
40.000
|
$300.000
|
$330.000
|
$300.000
|
$335.000
|
$342.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
4,500.000
|
$12.000
|
$7.750
|
$6.000
|
$12.000
|
$5.500
|
|
|
CEMENT
|
TON
|
126.000
|
$250.000
|
$310.000
|
$254.000
|
$285.000
|
$300.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
8,684.000
|
$4.230
|
$6.000
|
$4.400
|
$11.650
|
$9.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
4,851.000
|
$4.790
|
$4.250
|
$6.000
|
$13.200
|
$12.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
3,388.000
|
$1.980
|
$6.500
|
$7.000
|
$7.550
|
$6.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR(10"-24")
|
SY
|
2,500.000
|
$80.000
|
$96.000
|
$30.000
|
$97.700
|
$123.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
33,997.000
|
$2.320
|
$3.000
|
$3.300
|
$5.600
|
$3.000
|
|
|
CUT & RESTORING PAV
|
SY
|
313.000
|
$104.220
|
$47.000
|
$50.000
|
$105.000
|
$48.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
99.000
|
$550.000
|
$490.000
|
$730.000
|
$461.000
|
$574.500
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
15.000
|
$181.220
|
$190.000
|
$240.000
|
$259.850
|
$204.500
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
60.000
|
$156.590
|
$190.000
|
$220.000
|
$247.500
|
$134.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
11.000
|
$638.170
|
$460.000
|
$730.000
|
$340.600
|
$879.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
20.000
|
$90.000
|
$130.000
|
$194.000
|
$111.650
|
$146.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
172.000
|
$105.000
|
$86.000
|
$170.000
|
$123.700
|
$130.500
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
1,098.000
|
$196.000
|
$180.000
|
$215.000
|
$214.050
|
$208.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$6,944.400
|
$9,200.000
|
$10,000.000
|
$6,905.000
|
$7,648.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$6,670.550
|
$3,500.000
|
$8,000.000
|
$7,480.000
|
$5,947.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
1.000
|
$4,130.900
|
$2,000.000
|
$2,300.000
|
$10,000.000
|
$3,282.500
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,323.560
|
$3,400.000
|
$2,400.000
|
$3,400.000
|
$3,494.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,752.000
|
$4,400.000
|
$2,400.000
|
$3,785.000
|
$4,718.500
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$2,025.090
|
$2,900.000
|
$2,700.000
|
$3,575.000
|
$3,722.500
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$2,872.380
|
$1,200.000
|
$2,200.000
|
$7,000.000
|
$4,158.000
|
|
|
REMOV STR (SET)
|
EA
|
43.000
|
$475.000
|
$360.000
|
$250.000
|
$960.000
|
$341.000
|
|
|
REMOV STR (PIPE)
|
LF
|
735.000
|
$20.370
|
$29.000
|
$22.000
|
$18.100
|
$5.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$307,437.140
|
$385,000.000
|
$400,000.000
|
$342,868.000
|
$470,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$7,500.000
|
$1,600.000
|
$12,000.000
|
$6,625.000
|
$1,711.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
404.000
|
$41.000
|
$47.000
|
$36.000
|
$43.850
|
$45.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
404.000
|
$12.350
|
$13.000
|
$10.000
|
$12.200
|
$12.500
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
76.000
|
$2.570
|
$16.000
|
$5.000
|
$6.100
|
$6.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
386.000
|
$4.470
|
$5.500
|
$8.000
|
$5.200
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
386.000
|
$1.320
|
$1.250
|
$1.000
|
$1.200
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
460.000
|
$2.870
|
$5.250
|
$4.000
|
$4.900
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
48.000
|
$5.020
|
$6.500
|
$5.000
|
$6.100
|
$6.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
508.000
|
$1.110
|
$1.250
|
$1.000
|
$1.200
|
$1.500
|
|
|
CONC CURB (TY II)
|
LF
|
74.000
|
$20.000
|
$9.750
|
$40.000
|
$42.900
|
$51.500
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
51.000
|
$25.000
|
$9.750
|
$55.000
|
$59.550
|
$74.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
614.000
|
$25.340
|
$38.000
|
$33.000
|
$60.700
|
$36.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
371.000
|
$92.080
|
$120.000
|
$95.000
|
$113.700
|
$125.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,129.000
|
$53.080
|
$48.000
|
$78.000
|
$50.900
|
$84.500
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
5,633.000
|
$0.350
|
$0.750
|
$1.600
|
$0.350
|
$1.000
|
|
|
CONC MEDIAN
|
SY
|
19.000
|
$90.000
|
$170.000
|
$250.000
|
$304.500
|
$344.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
174.000
|
$500.000
|
$150.000
|
$93.000
|
$88.850
|
$171.500
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
3.000
|
$375.000
|
$180.000
|
$160.000
|
$340.000
|
$1,235.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
187.500
|
$25.850
|
$53.000
|
$35.000
|
$34.350
|
$33.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,588.930
|
$4,600.000
|
$1,000.000
|
$1,775.000
|
$2,142.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,388.860
|
$4,600.000
|
$3,000.000
|
$4,060.000
|
$3,780.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$458.790
|
$650.000
|
$800.000
|
$600.000
|
$729.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
12.000
|
$212.800
|
$300.000
|
$480.000
|
$275.000
|
$332.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$245.080
|
$310.000
|
$500.000
|
$290.000
|
$353.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
9.000
|
$43.550
|
$20.000
|
$40.000
|
$18.300
|
$43.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$825.000
|
$860.000
|
$700.000
|
$790.000
|
$1,023.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$865.850
|
$1,100.000
|
$830.000
|
$975.000
|
$1,201.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
7.000
|
$590.320
|
$730.000
|
$720.000
|
$675.000
|
$901.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$630.610
|
$780.000
|
$660.000
|
$725.000
|
$972.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$123.330
|
$150.000
|
$120.000
|
$140.000
|
$224.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$90.560
|
$99.000
|
$45.000
|
$91.400
|
$119.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
7.000
|
$38.690
|
$32.000
|
$45.000
|
$29.200
|
$39.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
1.000
|
$100.000
|
$640.000
|
$80.000
|
$590.000
|
$683.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
600.000
|
$0.620
|
$0.500
|
$0.380
|
$0.600
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
10,107.000
|
$0.390
|
$0.500
|
$0.380
|
$0.450
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
141.000
|
$0.750
|
$1.000
|
$0.780
|
$0.600
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
5.000
|
$75.690
|
$99.000
|
$75.000
|
$183.000
|
$189.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
1.000
|
$80.300
|
$99.000
|
$75.000
|
$183.000
|
$189.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
14,868.000
|
$0.370
|
$0.500
|
$0.380
|
$0.450
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
65.000
|
$4.460
|
$7.250
|
$5.600
|
$4.900
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
337.000
|
$4.680
|
$7.250
|
$5.600
|
$4.900
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
330.000
|
$5.180
|
$7.250
|
$5.600
|
$4.900
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
709.000
|
$3.600
|
$6.500
|
$5.000
|
$4.900
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
236.000
|
$3.680
|
$6.500
|
$5.000
|
$4.900
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,434.000
|
$1.500
|
$1.250
|
$1.400
|
$2.300
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,356.000
|
$1.500
|
$1.250
|
$1.400
|
$2.450
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
306.000
|
$1.920
|
$1.500
|
$1.100
|
$2.450
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,387.000
|
$1.250
|
$1.500
|
$1.100
|
$2.450
|
$2.500
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
265.000
|
$4.370
|
$5.250
|
$4.000
|
$7.300
|
$7.500
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
1,300.000
|
$0.330
|
$1.000
|
$0.780
|
$0.650
|
$0.650
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
2,686.000
|
$0.170
|
$1.000
|
$0.780
|
$0.650
|
$0.650
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
135.000
|
$2.000
|
$1.500
|
$1.100
|
$0.650
|
$0.650
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,692.000
|
$0.800
|
$1.500
|
$1.100
|
$0.650
|
$0.650
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
3.000
|
$119.000
|
$140.000
|
$110.000
|
$122.000
|
$126.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
2.000
|
$143.660
|
$140.000
|
$110.000
|
$183.000
|
$189.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
2,756.000
|
$0.200
|
$1.000
|
$0.780
|
$0.650
|
$1.000
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
265.000
|
$1.070
|
$5.250
|
$4.000
|
$4.900
|
$5.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)
|
LF
|
6,298.000
|
$1.000
|
$1.250
|
$0.900
|
$3.650
|
$4.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,290.000
|
$0.650
|
$1.250
|
$1.000
|
$2.450
|
$2.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
7,066.000
|
$0.610
|
$1.250
|
$1.000
|
$2.450
|
$2.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,315.000
|
$0.660
|
$1.250
|
$1.000
|
$1.850
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
15,859.000
|
$0.610
|
$1.250
|
$1.000
|
$1.850
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
24.000
|
$220.000
|
$360.000
|
$280.000
|
$396.000
|
$409.500
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$300.000
|
$360.000
|
$280.000
|
$580.000
|
$598.500
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
9.000
|
$46.740
|
$50.000
|
$38.000
|
$122.000
|
$126.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
146.000
|
$6.550
|
$8.000
|
$6.200
|
$12.200
|
$12.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
350.000
|
$4.000
|
$8.000
|
$6.200
|
$12.200
|
$12.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
148.000
|
$4.500
|
$8.000
|
$6.200
|
$12.200
|
$12.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
23,063.000
|
$0.450
|
$0.500
|
$0.320
|
$0.850
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
820.000
|
$1.150
|
$0.500
|
$0.380
|
$0.850
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$60.000
|
$72.000
|
$55.000
|
$122.000
|
$126.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
3.000
|
$60.000
|
$72.000
|
$55.000
|
$122.000
|
$126.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,916.000
|
$0.050
|
$0.040
|
$0.030
|
$0.240
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,710.000
|
$0.100
|
$0.070
|
$0.050
|
$0.350
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
3.000
|
$10.000
|
$33.000
|
$25.000
|
$61.000
|
$63.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$10.000
|
$33.000
|
$25.000
|
$61.000
|
$63.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
9.000
|
$13.070
|
$16.000
|
$12.000
|
$24.400
|
$25.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$5,000.000
|
$3,900.000
|
$4,000.000
|
$6,100.000
|
$12,348.000
|
|
|
TREE PROTECTION
|
EA
|
1.000
|
$500.000
|
$350.000
|
$275.000
|
$3,050.000
|
$2,293.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
4,654.000
|
$114.000
|
$160.000
|
$146.000
|
$134.900
|
$129.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
5,158.000
|
$128.000
|
$160.000
|
$169.000
|
$158.400
|
$140.000
|
|
|
TACK COAT
|
GAL
|
6,984.000
|
$3.320
|
$7.500
|
$4.000
|
$5.800
|
$7.000
|
|
|
HISTORICAL MARKER RELOCATION
|
EA
|
2.000
|
$1,000.000
|
$2,000.000
|
$650.000
|
$1,820.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$6,200.000
|
$15,000.000
|
$16,000.000
|
$9,450.000
|
|
|
TMA (STATIONARY)
|
DAY
|
107.000
|
$225.000
|
$200.000
|
$350.000
|
$240.000
|
$211.500
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$500.000
|
$350.000
|
$350.000
|
$570.000
|
$831.500
|
|
Totals: |
$3,626,219.725
|
$4,456,784.390
|
$4,545,400.350
|
$4,627,463.245
|
$4,739,225.450
|