Show Job Controls
Bid Cobra

ROBERTSON US 79 (0205-01-046)

Items: 72

County: ROBERTSON
Length: 0.0000 MILES
Highway: US 79
District: BRYAN
Control Number: 0205-01-046
DBE Goal: 4.0%
Project: STP 2025(360)HES
Guaranty: $18,000.00
Time: 41 WORKING DAYS
Engineer's Estimate: $891,318.28
Date: 02/06/2025 (1 year ago)
Contract Number: 2253038
Type: INTERSECTION IMPROVEMENT
Project ID: A00184763
Contract Type: Federal
Project Description: INTERSECTION IMPROVEMENT WITH RIGHT AND / OR LEFT TURN LANES
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$891,318.28
Over/Under Est: 0.67% $5,971.87
Over/Under Est: 1.6% $14,234.14
Amt Left: 0.92% $8,262.27
Over/Under Est: 5.36% $47,743.22
Amt Left: 4.66% $41,771.35
Delta: -3.70% -$33,509.08
Over/Under Est: 6.11% $54,463.75
Amt Left: 5.4% $48,491.88
Delta: -0.72% -$6,720.53
Over/Under Est: 13.23% $117,880.97
Amt Left: 12.47% $111,909.10
Delta: -6.71% -$63,417.22
$1,112,440.95
Over/Under Est: 24.81% $221,122.67
Amt Left: 23.98% $215,150.80
Delta: -10.23% -$103,241.70
$1,440,590.05
Over/Under Est: 61.62% $549,271.77
Amt Left: 60.55% $543,299.90
Delta: -29.50% -$328,149.10
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 8.11% $72,792.37
THIRD COAST SERVICES LLC 4.38% $39,313.27
STRIPING TECHNOLOGY, L.P. 3.27% $29,350.32
CEN TEX HYDROSEED, INC. 1.33% $11,937.59
MURRAY CONSTRUCTION 1.16% $10,411.73
PROFESSIONAL TRAFFIC CONTROL LLC 0.78% $7,000.99
STRIPE LINES, INC. 0.71% $6,372.70
Total: 19.74% $177,178.97

Bid Items & Bid Tabulations

72 Total 0 of 72
ROBERTSON  |  US 79  |  BRYAN  |  0205-01-046  |  02/06/2025  |  $891,318.28  |  STP 2025(360)HES  |  INTERS IMPRV  |  41 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
BIG CREEK CONSTRUCTION, LTD.
LARRY YOUNG PAVING, INC.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
LAKEY, INC.
BRAZOS PAVING, INC.
PREPARING ROW
STA 3.000 $1,250.000 $3,000.000 $7,000.000 $6,200.000 $5,100.000 $5,000.000 $3,700.000 $11,755.000
REMOV CONC (CURB)
LF 30.000 $10.000 $50.000 $15.000 $12.000 $43.000 $20.000 $14.500 $31.600
RMV (3"-7") TRT/UNTRT BASE & ASPH PAV
SY 236.000 $7.000 $44.000 $11.000 $17.000 $15.000 $17.500 $8.770 $27.150
RMV (10") TRT/UNTRT BASE & ASPH PAV
SY 252.000 $8.000 $47.000 $12.000 $16.000 $28.000 $37.000 $8.770 $36.450
RMV (16") TRT/UNTRT BASE & ASPH PAV
SY 1,140.000 $10.000 $16.000 $15.000 $10.000 $17.000 $16.000 $10.780 $21.150
EXCAV (ROADWAY)
CY 791.000 $25.000 $20.000 $18.000 $40.000 $17.000 $23.000 $58.500 $22.500
EMBANK (FNL)(DC)(TY C)
CY 364.000 $28.000 $20.000 $18.000 $40.000 $33.000 $15.000 $26.000 $48.600
FURN & PLACE TOPSOIL (4")
SY 5,170.000 $1.600 $2.000 $2.500 $1.500 $0.750 $1.000 $3.200 $2.090
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 5,170.000 $0.500 $0.600 $0.560 $1.250 $0.900 $0.850 $0.500 $1.100
HYDRO MULCH SEED (TEMP_WARM)
SY 2,585.000 $0.600 $0.600 $0.510 $1.250 $0.900 $0.850 $0.500 $1.100
HYDRO MULCH SEED (TEMP_COOL)
SY 2,585.000 $0.600 $0.550 $0.490 $1.250 $0.900 $0.850 $0.860 $1.100
VEGETATIVE WATERING
TGL 51.700 $50.000 $20.000 $25.000 $35.000 $160.000 $70.000 $75.000 $92.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 2,913.000 $23.000 $21.000 $20.000 $22.000 $20.000 $20.000 $18.990 $31.650
FL BS (CMP IN PLC)(TY A GR 1-2) (9")
SY 333.000 $26.000 $50.000 $28.000 $36.000 $43.000 $40.000 $75.000 $23.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 5.000 $350.000 $1,000.000 $350.000 $200.000 $1,465.000 $360.000 $360.900 $485.000
LIME TRT (EXIST MATL)(6")
SY 765.000 $4.000 $7.650 $18.000 $2.000 $11.000 $20.000 $5.860 $63.200
CEMENT
TON 23.000 $290.000 $325.000 $250.000 $280.000 $355.000 $225.000 $262.500 $590.000
CEMENT TRT (EXIST MATL)(6")
SY 3,061.000 $4.000 $4.000 $6.000 $3.750 $2.500 $3.500 $4.690 $10.500
PRIME COAT (MC-30)
GAL 629.000 $11.000 $8.000 $7.500 $6.750 $6.500 $8.000 $11.500 $12.750
PRIME COAT (RC-250)
GAL 73.000 $11.000 $40.000 $15.000 $24.000 $23.000 $22.000 $202.750 $33.100
AGGR (TY-PB, GR-5)(SAC-B)
CY 2.000 $210.000 $1,800.000 $1,500.000 $670.000 $2,770.000 $2,500.000 $102.130 $1,390.000
SP MIXES SP-B SAC-B PG64-22
TON 1,145.000 $125.000 $112.000 $115.000 $120.000 $132.500 $129.000 $150.000 $143.400
SP MIXES SP-C SAC-A PG70-22
TON 1,849.000 $135.000 $138.000 $135.000 $140.000 $148.500 $137.000 $170.310 $159.200
TACK COAT
GAL 2,050.000 $4.500 $3.500 $7.500 $6.000 $4.000 $5.000 $7.000 $7.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
SY 114.000 $130.000 $200.000 $175.000 $200.000 $345.000 $255.000 $92.000 $466.600
PLANE ASPH CONC PAV(2")
SY 14,028.000 $3.500 $2.100 $3.000 $3.000 $2.400 $1.500 $3.500 $5.600
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $310.000 $365.000 $575.000 $310.000 $374.000 $550.000 $495.950 $720.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 9.000 $290.000 $300.000 $350.000 $180.000 $340.000 $420.000 $220.000 $395.000
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1)(C)
EA 2.000 $7,800.000 $12,000.000 $5,750.000 $7,000.000 $7,565.000 $21,000.000 $22,000.000 $9,750.000
REMOV STR (HEADWALL)
EA 1.000 $1,800.000 $2,500.000 $2,000.000 $1,300.000 $2,445.000 $5,500.000 $2,139.710 $1,710.000
REMOV STR (BOX CULVERT)
LF 12.000 $200.000 $350.000 $175.000 $200.000 $200.000 $500.000 $120.000 $177.100
MOBILIZATION
LS 1.000 $84,833.080 $50,000.000 $75,000.000 $87,000.000 $72,134.330 $94,869.000 $60,000.000 $198,320.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $10,000.000 $5,000.000 $6,000.000 $3,300.000 $2,580.000 $16,300.000 $5,000.000 $22,603.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $10,000.000 $5,000.000 $1,200.000 $4,850.000 $6,000.000 $9,150.000 $19,110.000
TMA (STATIONARY)
DAY 37.000 $300.000 $125.000 $300.000 $220.000 $250.000 $550.000 $297.500 $460.000
TMA (MOBILE OPERATION)
DAY 4.000 $320.000 $125.000 $400.000 $1,100.000 $730.000 $1,000.000 $169.820 $810.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 45.000 $50.000 $81.000 $50.000 $51.000 $40.000 $38.000 $54.300 $50.000
ROCK FILTER DAMS (REMOVE)
LF 45.000 $16.000 $25.000 $20.000 $13.000 $10.000 $10.000 $17.030 $13.150
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 105.000 $12.000 $8.000 $7.500 $10.000 $8.000 $7.500 $8.000 $9.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 105.000 $5.000 $1.000 $1.500 $2.000 $1.600 $1.500 $2.000 $2.000
CONCRETE GUTTER (MODIFIED)
LF 152.000 $50.000 $200.000 $50.000 $73.000 $59.000 $100.000 $125.000 $66.800
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 5,212.000 $0.400 $0.500 $1.350 $1.750 $1.450 $0.450 $0.450 $0.750
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 410.000 $0.500 $1.000 $1.350 $1.500 $1.450 $1.000 $0.850 $3.450
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 2.000 $6,000.000 $7,228.000 $7,000.000 $7,300.000 $8,890.000 $6,500.000 $4,897.820 $8,500.000
CONDT (PVC) (SCH 40) (2")
LF 55.000 $16.000 $27.000 $30.000 $10.000 $16.000 $25.000 $16.000 $32.700
CONDT (PVC) (SCH 40) (2") (BORE)
LF 100.000 $26.000 $16.000 $50.000 $19.000 $26.500 $45.000 $27.000 $58.850
ELEC CONDR (NO.8) BARE
LF 225.000 $2.000 $2.200 $3.500 $1.000 $2.100 $3.000 $2.000 $4.000
ELEC CONDR (NO.8) INSULATED
LF 450.000 $2.300 $2.300 $3.500 $1.250 $2.100 $3.200 $1.870 $4.200
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,600.000 $1,843.000 $2,500.000 $1,000.000 $1,200.000 $2,200.000 $1,530.000 $2,884.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $7,500.000 $10,800.000 $10,000.000 $7,800.000 $9,500.000 $9,500.000 $6,816.050 $12,420.000
ALUMINUM SIGNS (TY A)
SF 52.000 $50.000 $40.000 $45.000 $33.000 $42.000 $40.000 $39.000 $52.300
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $685.000 $850.000 $875.000 $940.000 $900.000 $850.000 $721.260 $1,111.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $600.000 $800.000 $825.000 $740.000 $850.000 $800.000 $600.000 $1,045.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $640.000 $750.000 $775.000 $810.000 $800.000 $750.000 $650.000 $980.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $100.000 $125.000 $190.000 $270.000 $100.000 $115.000 $131.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $90.000 $100.000 $125.000 $130.000 $100.000 $100.000 $182.000 $131.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 6,067.000 $0.600 $0.500 $0.520 $1.250 $0.500 $0.500 $0.580 $0.700
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 6,190.000 $0.600 $0.500 $0.520 $1.250 $0.520 $0.500 $0.580 $0.700
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 309.000 $5.100 $5.000 $7.000 $9.250 $5.000 $5.000 $4.400 $9.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 76.000 $1.500 $1.000 $1.500 $0.750 $1.500 $1.000 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,064.000 $1.500 $1.000 $1.500 $0.750 $1.400 $1.000 $1.600 $2.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 73.000 $3.100 $3.000 $1.060 $4.000 $3.200 $3.000 $2.500 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,493.000 $1.800 $1.200 $1.060 $2.750 $1.250 $1.200 $2.040 $1.400
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 30.000 $4.850 $10.000 $10.600 $5.250 $10.500 $10.000 $3.180 $13.900
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 6,235.000 $0.600 $0.750 $0.770 $1.250 $0.800 $0.750 $4.000 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 103.000 $0.600 $2.000 $0.770 $1.250 $2.100 $2.000 $5.000 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 8,308.000 $0.600 $0.750 $0.770 $1.250 $0.800 $0.750 $5.000 $1.000
PREFAB PM TY C (W)(ARROW)
EA 4.000 $285.000 $250.000 $304.000 $470.000 $265.000 $250.000 $292.000 $400.000
PREFAB PM TY C (W)(WORD)
EA 4.000 $300.000 $300.000 $374.000 $470.000 $320.000 $300.000 $362.500 $490.000
PREFAB PM TY C (W)(RR XING)
EA 2.000 $750.000 $700.000 $777.000 $870.000 $740.000 $700.000 $900.000 $1,016.000
REFL PAV MRKR TY I-C
EA 76.000 $6.500 $6.000 $7.000 $9.250 $6.400 $6.000 $5.500 $9.150
REFL PAV MRKR TY II-A-A
EA 843.000 $6.500 $5.000 $7.000 $9.250 $5.250 $5.000 $6.000 $9.150
Totals: $891,318.280 $897,290.150 $905,552.420 $939,061.500 $945,782.030 $1,009,199.250 $1,112,440.950 $1,440,590.050