Show Job Controls
Bid Cobra

ROBERTSON US 190 (0049-08-078)

Items: 57

County: ROBERTSON
Length: N/A
Highway: US 190
District: BRYAN
Control Number: 0049-08-078
DBE Goal: 0.0%
Project: C 49-8-78
Guaranty: N/A
Time: 118 WORKING DAYS
Engineer's Estimate: $1,335,986.80
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,335,986.80
$1,275,456.89
Over/Under Est: -4.53% -$60,529.91
Over/Under Est: 1.83% $24,398.74
Amt Left: 6.66% $84,928.65
Over/Under Est: 4.82% $64,445.47
Amt Left: 9.8% $124,975.38
Delta: -2.94% -$40,046.73
Over/Under Est: 7% $93,510.46
Amt Left: 12.08% $154,040.37
Delta: -2.08% -$29,064.99
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 4.05% $60,787.69
CEN TEX HYDROSEED, INC. 0.66% $9,906.14
Total: 4.71% $70,693.83

Bid Items & Bid Tabulations

57 Total 0 of 57
ROBERTSON  |  US 190  |  BRYAN  |  0049-08-078  |  06/06/2024  |  $1,335,986.80  |  C 49-8-78  |  INTERS IMPRV  |  118 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BRAZOS PAVING, INC.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
EXCAVATION (ROADWAY)
CY 1,908.000 $32.000 $29.900 $30.000 $20.000 $42.450
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,501.000 $40.000 $35.500 $30.000 $37.400 $62.200
BLADING
STA 15.000 $170.000 $2,005.000 $513.000 $160.000 $500.000
FURNISHING AND PLACING TOPSOIL (4")
SY 14,558.000 $3.000 $1.400 $0.650 $1.100 $1.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 14,558.000 $0.300 $0.450 $0.350 $0.360 $0.320
BROADCAST SEED (TEMP) (WARM)
SY 7,279.000 $0.500 $0.400 $0.330 $0.340 $0.300
BROADCAST SEED (TEMP) (COOL)
SY 7,279.000 $0.500 $0.400 $0.330 $0.340 $0.300
VEGETATIVE WATERING
MG 145.500 $60.000 $13.100 $13.000 $53.000 $25.000
PROOF ROLLING
HR 2.000 $150.000 $154.000 $140.000 $90.000 $200.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(14")
SY 1,278.000 $50.000 $51.150 $84.000 $46.550 $95.600
CEMENT
TON 9.500 $310.000 $346.650 $620.000 $512.000 $750.000
CEMENT TREAT (SUBGRADE)(6")
SY 1,278.000 $8.000 $20.750 $24.000 $13.800 $21.250
PRIME COAT (MC-30 OR EC-30)
GAL 256.000 $15.000 $13.550 $44.000 $21.200 $8.000
PLANE ASPH CONC PAV (2")
SY 4,908.000 $4.000 $6.350 $8.000 $8.760 $14.650
PLAN ASPH CONC PAV (12")
SY 1,841.000 $16.000 $12.500 $23.000 $22.000 $39.600
CEM STABIL BKFL
CY 15.000 $160.000 $182.700 $106.000 $121.000 $250.000
CL A CONC (MEDIAN)
CY 55.600 $600.000 $497.000 $835.000 $803.000 $750.000
CL A CONC (COLLAR)
EA 1.000 $2,500.000 $1,262.000 $1,900.000 $2,900.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 44.000 $80.000 $144.300 $135.000 $123.000 $80.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,500.000 $3,490.000 $3,900.000 $2,280.000 $1,500.000
REMOV STR (SET)
EA 1.000 $600.000 $1,050.000 $645.000 $400.000 $1,000.000
MOBILIZATION
LS 1.000 $121,453.350 $111,715.000 $130,000.000 $205,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $3,705.000 $10,000.000 $3,700.000 $4,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 68.000 $5.000 $6.500 $6.000 $5.680 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 68.000 $2.000 $2.650 $2.000 $2.250 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 52.000 $10.000 $7.850 $7.000 $6.820 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 52.000 $5.000 $2.650 $2.000 $2.250 $2.000
CONC CURB (MOD) (TYPE I)
LF 611.300 $52.500 $31.750 $65.000 $98.000 $100.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 3,402.000 $0.500 $2.600 $3.000 $4.100 $0.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $750.000 $950.000 $735.000 $824.000 $595.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $900.000 $1,141.000 $855.000 $991.000 $695.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,500.000 $2,550.000 $1,840.000 $2,300.000 $1,495.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $700.000 $832.000 $600.000 $735.000 $495.000
REMOVE SM RD SN SUP&AM
EA 3.000 $125.000 $170.000 $230.000 $149.000 $150.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 2.000 $140.000 $327.000 $215.000 $65.000 $175.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRF
EA 4.000 $110.000 $392.000 $185.000 $65.000 $150.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 1.000 $105.000 $327.000 $110.000 $120.000 $90.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 29.000 $3.000 $1.850 $1.700 $2.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 128.000 $3.000 $1.400 $1.700 $2.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 77.000 $3.500 $3.900 $1.500 $3.400 $1.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,768.000 $1.600 $2.800 $1.500 $2.440 $1.250
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 63.000 $60.000 $73.250 $65.000 $64.000 $55.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 720.000 $10.000 $10.500 $12.000 $9.100 $10.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 6,454.000 $1.000 $1.500 $1.500 $1.310 $1.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $280.000 $403.500 $350.000 $351.000 $300.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $460.000 $600.000 $470.000 $514.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $400.000 $495.000 $350.000 $428.000 $300.000
REFL PAV MRKR TY II-A-A
EA 122.000 $10.000 $9.500 $6.500 $8.250 $5.500
REFL PAV MRKR TY II-C-R
EA 225.000 $10.000 $9.500 $6.500 $8.250 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 2,574.000 $1.000 $3.300 $1.250 $3.000 $1.000
SP MIXES SP-B PG64-22
TON 1,713.000 $150.000 $162.000 $145.000 $132.200 $135.350
SP MIXES SP-C PG64-22
TON 406.000 $200.000 $167.300 $175.000 $194.150 $200.350
PFC-C PG76-22 SAC-A
TON 786.000 $250.000 $215.300 $245.000 $215.650 $223.000
BONDING COURSE
GAL 845.000 $8.500 $7.100 $5.000 $6.100 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,900.000 $12,745.000 $5,700.000 $9,000.000 $18,000.000
TMA (STATIONARY)
DAY 204.000 $350.000 $295.000 $220.000 $550.000 $75.000
TMA (MOBILE OPERATION)
DAY 15.000 $350.000 $650.000 $440.000 $920.000 $250.000
Totals: $1,335,986.800 $1,275,456.900 $1,360,385.540 $1,400,432.270 $1,429,497.260