Bid Cobra

ROBERTS SH 70 (0490-04-045)

Items: 104

County: ROBERTS
Length: N/A
Highway: SH 70
District: AMARILLO
Control Number: 0490-04-045
DBE Goal: N/A
Project: STP 2019(727)
Guaranty: N/A
Time: 178 WORKING DAYS
Engineer's Estimate: $23,322,706.09
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$23,322,706.09
$23,349,233.82
Over/Under Est: 0.11% $26,527.73
$24,724,796.16
Over/Under Est: 6.01% $1,402,090.07
Amt Left: 5.89% $1,375,562.34
$24,994,329.67
Over/Under Est: 7.17% $1,671,623.58
Amt Left: 7.05% $1,645,095.85
Delta: -1.09% -$269,533.51
Over/Under Est: 13.47% $3,141,410.80
Amt Left: 13.34% $3,114,883.07
Delta: -5.88% -$1,469,787.22
Over/Under Est: 17.53% $4,088,750.64
Amt Left: 17.4% $4,062,222.91
Delta: -3.58% -$947,339.84

Bid Items & Bid Tabulations

104 Total 0 of 104
ROBERTS  |  SH 70  |  AMARILLO  |  0490-04-045  |  04/02/2019  |  $23,322,706.09  |  STP 2019(727)  |  OVERLAY  |  178 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
RK HALL, LLC
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
AC 68.730 $200.000 $185.000 $200.000 $96.000 $231.560 $2,100.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 88.000 $1,000.000 $210.000 $325.000 $320.000 $186.270 $450.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 28.000 $1,200.000 $1,700.000 $300.000 $1,700.000 $1,157.810 $1,200.000
REMOVING CONC (MEDIANS)
SY 49.000 $15.000 $30.000 $29.360 $21.500 $70.300 $22.000
REMOVING CONC (DRIVEWAYS)
SY 700.000 $15.000 $30.000 $17.520 $17.000 $70.300 $13.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 280.000 $5.000 $17.000 $15.240 $11.500 $12.120 $14.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 272.000 $11.000 $26.000 $31.730 $17.000 $70.300 $20.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 3,192.000 $2.630 $5.500 $5.560 $6.250 $5.470 $6.000
SUBGRADE WIDENING (DENS CONT)
STA 38.230 $700.000 $570.000 $730.870 $405.000 $255.340 $664.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 551.000 $12.000 $23.500 $48.480 $44.000 $24.540 $17.000
BACKFILL (TY A)
STA 1,495.190 $150.000 $225.000 $182.200 $375.000 $269.330 $28.000
BLOCK SODDING
SY 785.000 $7.500 $4.850 $4.970 $4.900 $18.350 $10.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 1.560 $450.000 $1,015.000 $1,036.800 $1,000.000 $2,079.650 $1,000.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 68.730 $450.000 $330.000 $340.200 $335.000 $593.510 $457.000
CEMENT
TON 334.000 $160.000 $157.150 $203.510 $185.000 $182.930 $165.000
CEMENT TREAT (SUBGRADE) (8")
SY 3,395.000 $6.000 $7.400 $5.330 $5.650 $5.130 $2.250
CEMENT TREAT(EXIST MATL)(8")
SY 28,229.000 $2.350 $2.700 $3.260 $4.100 $3.140 $2.500
PRIME COAT (AE-P)
GAL 8,036.000 $3.500 $4.950 $4.310 $4.150 $3.620 $4.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 20,766.000 $3.250 $3.900 $3.610 $4.200 $4.020 $3.500
SUPERPAVE MIXTURES SP-D SAC-A PG76-28
TON 162,950.000 $93.000 $93.900 $109.640 $110.000 $108.840 $109.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 96,848.000 $20.000 $16.000 $15.710 $17.000 $20.340 $25.000
PLAN & TEXT ASPH CONC PAV(0" TO 12")
SY 1,804.000 $1.500 $8.300 $4.590 $6.550 $7.370 $7.000
PLANE ASPH CONC PAV(0" TO 2")
SY 47,351.000 $2.000 $1.900 $2.160 $1.650 $1.560 $1.200
PLANE ASPH CONC PAV(0" TO 3")
SY 1,467.000 $3.000 $7.050 $6.480 $5.850 $5.960 $6.000
PLANE ASPH CONC PAV (1.5")
SY 5,928.000 $1.250 $2.350 $2.030 $2.150 $1.940 $2.040
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,212.000 $2.500 $4.200 $3.240 $7.050 $3.840 $7.000
PLANE ASPH CONC PAV (3" TO 4 1/2")
SY 28,229.000 $3.000 $3.650 $3.240 $3.750 $2.380 $2.500
FULL - DEPTH REPAIR CRCP (8")
SY 399.000 $200.000 $230.000 $378.000 $265.000 $442.380 $225.000
CEM STABIL BKFL
CY 8.000 $130.000 $430.000 $243.310 $215.000 $484.800 $200.000
FLOWABLE BACKFILL
CY 3.600 $175.000 $460.000 $243.320 $265.000 $242.400 $200.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 15.000 $85.000 $265.000 $70.200 $69.000 $75.260 $108.000
RIPRAP (CONC)(4 IN)
CY 15.300 $700.000 $530.000 $495.260 $530.000 $584.690 $550.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 88.000 $40.000 $79.000 $11.880 $11.500 $12.740 $64.000
CLEANING AND SEALING JOINTS
LF 396.000 $21.000 $79.000 $44.280 $43.500 $47.470 $90.000
MULTI-LAYER POLYMER OVERLAY
SY 16,016.000 $60.000 $30.000 $27.000 $25.000 $32.690 $28.000
RAIL (TY PR11)
LF 206.000 $60.000 $170.000 $154.190 $115.000 $74.570 $80.000
HEADER TYPE EXPANSION JOINT
CF 51.000 $420.000 $737.500 $270.000 $265.000 $289.450 $600.000
JOINT SEALANT
LF 308.000 $35.000 $89.550 $44.280 $43.500 $47.470 $80.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 2.000 $5,000.000 $11,450.000 $8,712.930 $8,000.000 $4,631.250 $6,000.000
SHOT BLASTING
SY 16,084.000 $7.000 $4.750 $3.240 $3.200 $3.470 $4.000
MOBILIZATION
LS 1.000 $1,872,000.000 $2,002,000.000 $1,108,621.910 $840,000.000 $2,130,117.340 $2,660,584.530
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $17,500.000 $28,525.000 $17,452.310 $48,000.000 $35,000.000 $10,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 400.000 $4.500 $9.250 $4.100 $4.050 $4.400 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.000 $2.800 $1.080 $1.050 $1.160 $1.000
CONC CURB (TY II)
LF 136.000 $15.000 $15.800 $86.550 $21.500 $17.370 $15.000
CONC CURB & GUTTER (TY II)
LF 108.000 $19.000 $52.650 $145.970 $42.500 $57.250 $30.000
INTERSECTIONS (CONC)
SY 352.000 $100.000 $92.800 $117.550 $135.000 $101.960 $55.000
DRIVEWAYS (CONC)
SY 935.000 $120.000 $68.600 $91.800 $80.000 $75.390 $65.000
CONC SIDEWALKS (4")
SY 4,063.000 $50.000 $55.300 $55.660 $64.000 $55.050 $45.000
CURB RAMPS (TY 7)
EA 3.000 $1,200.000 $1,210.000 $2,500.000 $1,600.000 $1,331.480 $1,100.000
CURB RAMPS (TY 10)
EA 11.000 $1,000.000 $1,210.000 $2,500.000 $1,600.000 $1,331.480 $1,300.000
CURB RAMPS (TY 21)
EA 2.000 $1,750.000 $1,395.000 $2,200.000 $2,100.000 $1,534.100 $1,800.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 295,304.000 $0.170 $0.100 $0.100 $0.100 $0.190 $0.100
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 147,652.000 $0.200 $0.300 $0.100 $0.210 $0.250 $0.100
CONC DIRECTIONAL ISLAND
LF 224.000 $50.000 $73.650 $56.290 $85.000 $80.940 $55.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5,450.000 $27.000 $27.650 $29.160 $25.500 $27.790 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $2,740.000 $1,988.280 $1,800.000 $1,620.940 $3,000.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,300.000 $1,500.000 $2,403.000 $1,100.000 $1,215.700 $1,300.000
REMOVE METAL BEAM GUARD FENCE
LF 5,200.000 $6.000 $3.150 $4.320 $2.650 $2.890 $6.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $230.000 $315.000 $432.000 $215.000 $231.560 $615.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $250.000 $315.000 $540.000 $265.000 $289.450 $320.000
GUARDRAIL END TREATMENT (INSTALL)
EA 34.000 $3,000.000 $3,160.000 $3,267.000 $2,700.000 $2,894.530 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $260.000 $315.000 $432.000 $265.000 $289.450 $320.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 25.000 $850.000 $895.000 $912.600 $370.000 $405.230 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $900.000 $980.000 $961.200 $400.000 $434.180 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $900.000 $1,060.000 $988.200 $530.000 $578.910 $780.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $800.000 $1,000.000 $939.600 $560.000 $607.850 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 16.000 $1,000.000 $1,090.000 $1,101.600 $640.000 $694.690 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,100.000 $1,200.000 $1,242.000 $690.000 $752.580 $1,000.000
REMOVE SM RD SN SUP&AM
EA 54.000 $82.000 $105.000 $108.000 $800.000 $872.990 $160.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 225.000 $100.000 $142.250 $135.000 $42.500 $46.310 $40.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 155.000 $60.000 $142.250 $135.000 $53.000 $57.890 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 462.000 $17.000 $15.800 $16.200 $10.500 $11.580 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 76.000 $25.000 $42.150 $42.120 $21.500 $23.160 $28.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 6.000 $15.000 $21.100 $36.720 $21.500 $23.160 $20.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 9,786.000 $0.300 $0.320 $0.320 $0.320 $0.350 $0.410
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 295,304.000 $0.300 $0.320 $0.320 $0.320 $0.350 $0.410
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,944.000 $0.450 $0.630 $0.650 $0.640 $0.690 $1.400
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 81.000 $2.000 $3.690 $3.780 $3.700 $4.050 $2.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 22.000 $45.000 $132.000 $135.000 $135.000 $144.730 $80.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 5.000 $60.000 $210.000 $216.000 $215.000 $231.560 $120.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 7.000 $30.000 $42.150 $43.200 $42.500 $46.310 $17.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 29,197.000 $0.300 $0.320 $0.320 $0.320 $0.350 $0.410
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 146,471.000 $0.300 $0.320 $0.320 $0.320 $0.350 $0.410
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 13,538.000 $0.900 $1.100 $1.000 $1.050 $2.320 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 41,720.000 $0.900 $1.150 $1.000 $1.050 $2.320 $1.250
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 4,934.000 $0.600 $0.420 $0.430 $0.430 $0.460 $0.400
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 14,861.000 $0.650 $0.820 $0.840 $0.830 $0.900 $0.900
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,696.000 $3.000 $4.200 $4.320 $4.250 $4.630 $5.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 582.000 $5.000 $8.450 $8.640 $8.500 $9.260 $9.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 39.000 $90.000 $184.350 $189.000 $185.000 $202.620 $200.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 7.000 $200.000 $263.400 $270.000 $265.000 $289.450 $300.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 7.000 $12.000 $42.150 $43.200 $42.500 $46.310 $42.000
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 400.000 $5.000 $4.200 $4.320 $4.250 $4.630 $4.200
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 21,211.000 $0.300 $0.420 $0.430 $0.430 $0.460 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 298,566.000 $0.300 $0.420 $0.430 $0.430 $0.460 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 39,068.000 $0.300 $0.420 $0.430 $0.430 $0.460 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 206,730.000 $0.300 $0.420 $0.430 $0.430 $0.460 $0.500
REFL PAV MRKR TY I-C
EA 1,657.000 $2.750 $4.200 $4.320 $4.250 $4.630 $6.000
REFL PAV MRKR TY II-A-A
EA 4,288.000 $2.500 $4.200 $4.320 $4.250 $4.630 $6.000
UNDERSEAL COURSE
GAL 180,393.000 $3.400 $3.450 $4.000 $3.450 $3.580 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $23,000.000 $4,884.150 $9,000.000 $23,827.780 $22,000.000
TMA (STATIONARY)
DAY 356.000 $250.000 $635.000 $375.680 $300.000 $250.170 $1,000.000
TMA (MOBILE OPERATION)
HR 560.000 $45.000 $63.500 $65.540 $96.000 $74.820 $90.000
Totals: $23,322,706.090 $23,349,233.820 $24,724,796.192 $24,994,329.670 $26,464,116.923 $27,411,456.730