Show Job Controls
Bid Cobra

REEVES RM 652 (0493-01-013)

Items: 74

County: REEVES
Length: N/A
Highway: RM 652
District: ODESSA
Control Number: 0493-01-013
DBE Goal: N/A
Project: STP 1702(333)
Guaranty: N/A
Time: 107 WORKING DAYS
Engineer's Estimate: $7,073,009.16
Date: 06/06/2017 (9 years ago)
Contract Number: N/A
Type: ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,073,009.16
$5,983,269.30
Over/Under Est: -15.41% -$1,089,739.86
Over/Under Est: -8.49% -$600,326.54
Amt Left: 8.18% $489,413.32
$7,150,385.68
Over/Under Est: 1.09% $77,376.52
Amt Left: 19.51% $1,167,116.38
Delta: -10.47% -$677,703.06
Over/Under Est: 10.81% $764,387.69
Amt Left: 30.99% $1,854,127.55
Delta: -9.61% -$687,011.17

Bid Items & Bid Tabulations

74 Total 0 of 74
REEVES  |  RM 652  |  ODESSA  |  0493-01-013  |  06/06/2017  |  $7,073,009.16  |  STP 1702(333)  |  ROADWAY RESTOR  |  107 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CI CONSTRUCTORS, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
PRICE CONSTRUCTION, LTD.
EXCAVATION (ROADWAY)
CY 11,107.000 $14.000 $7.000 $8.960 $8.000 $1.870
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 19,781.000 $15.000 $9.000 $17.710 $15.000 $12.040
BACKFILL (TY B)
STA 297.500 $340.000 $200.000 $200.000 $160.000 $282.590
BLADING
HR 60.000 $250.000 $150.000 $400.000 $155.000 $207.360
PROOF ROLLING
HR 149.000 $170.000 $80.000 $100.000 $73.000 $111.150
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
CY 12,672.000 $55.000 $45.000 $25.500 $40.500 $35.370
FL BS (CMP IN PLC)(TY A GR 4)(10.5")
SY 149,300.000 $11.000 $11.500 $11.600 $14.500 $14.610
REWORK BS MTL (TY C)(7")(DENS CONT)
SY 119,101.000 $7.000 $2.250 $4.900 $2.900 $3.220
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 29,863.000 $2.000 $2.750 $2.130 $3.000 $2.140
ASPH (AC-20-5TR)
GAL 59,717.000 $3.700 $3.400 $2.880 $2.900 $3.000
ASPH (RC-250)
GAL 22,394.000 $4.700 $3.400 $3.910 $3.500 $4.050
AGGR(TY-B GR-4 SAC-A)
CY 747.000 $80.000 $115.000 $83.400 $130.000 $137.730
AGGR(TY-PB GR-4 SAC-A)
CY 1,248.000 $90.000 $144.000 $96.450 $140.000 $141.500
TOM (ASPHALT) PG 76-22
TON 619.000 $200.000 $750.000 $594.000 $605.000 $760.000
TOM-C (AGGREGATE) SAC-A
TON 7,635.000 $70.000 $48.500 $81.000 $74.000 $109.000
CEM STABIL BKFL
CY 334.000 $250.000 $250.000 $183.750 $218.000 $252.810
TEMPORARY SPL SHORING
SF 512.000 $125.000 $15.000 $99.750 $14.000 $51.710
RIPRAP (CONC)(CL B)
CY 43.000 $700.000 $600.000 $1,102.500 $1,359.000 $632.030
CMP AR (GAL STL DES 2)
LF 564.000 $125.000 $40.000 $56.700 $43.000 $74.690
CMP AR (GAL STL DES 3)
LF 1,512.000 $150.000 $70.000 $63.000 $48.000 $91.930
CMP AR (GAL STL DES 4)
LF 12.000 $200.000 $100.000 $210.000 $186.000 $120.660
CMP AR (GAL STL DES 5)
LF 20.000 $225.000 $100.000 $210.000 $230.000 $178.120
CONC BOX CULV (5 FT X 5 FT)
LF 300.000 $500.000 $725.000 $430.500 $475.000 $689.490
SET (TY I)(S= 5 FT)(HW= 6 FT)(6:1) (C)
EA 10.000 $4,500.000 $8,150.000 $10,500.000 $7,200.000 $9,767.750
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 12.000 $2,700.000 $2,500.000 $2,520.000 $1,700.000 $1,493.890
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 30.000 $2,300.000 $2,600.000 $2,835.000 $2,400.000 $1,608.810
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 34.000 $2,500.000 $2,600.000 $3,465.000 $2,400.000 $1,838.640
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 2.000 $2,500.000 $4,000.000 $3,780.000 $3,300.000 $2,872.870
SET (TY II) (DES 5) (CMP) (4: 1) (C)
EA 12.000 $4,500.000 $6,000.000 $5,460.000 $3,400.000 $3,734.730
CLEAN EXIST CULVERTS
EA 13.000 $1,500.000 $1,000.000 $2,625.000 $2,000.000 $5,745.740
REMOV STR (BOX CULVERT)
LF 120.000 $200.000 $300.000 $411.600 $260.000 $74.690
MOBILIZATION
LS 1.000 $640,000.000 $300,000.000 $410,000.000 $644,025.240 $885,619.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,500.000 $12,500.000 $12,000.000 $31,000.000 $44,246.540
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 126.000 $45.000 $30.000 $40.000 $67.000 $35.350
ROCK FILTER DAMS (REMOVE)
LF 126.000 $12.000 $10.000 $10.000 $30.000 $10.800
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,120.000 $10.000 $10.000 $9.750 $4.500 $6.730
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,120.000 $1.000 $2.000 $2.000 $0.600 $2.790
CONSTRUCTING DETOURS
SY 562.000 $100.000 $30.000 $55.000 $47.000 $53.910
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 240.000 $70.000 $90.000 $57.840 $80.000 $91.930
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 240.000 $10.000 $20.000 $60.470 $5.000 $11.490
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 240.000 $25.000 $20.000 $41.500 $13.000 $11.490
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $7.000 $4.000 $8.400 $6.000 $5.750
CRASH CUSH ATTEN (INSTL)
EA 2.000 $19,000.000 $12,000.000 $6,865.950 $35,000.000 $9,193.180
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $2,300.000 $2,002.350 $2,300.000 $2,298.300
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $700.000 $787.500 $575.000 $2,298.300
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000 $673.000 $630.000 $614.250 $900.000 $672.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $840.000 $795.000 $771.750 $1,000.000 $844.620
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,096.000 $810.000 $787.500 $1,050.000 $861.860
REMOVE SM RD SN SUP&AM
EA 20.000 $125.000 $65.000 $125.000 $101.000 $79.630
INSTL OM ASSM (OM-2Y)(WC)GND
EA 30.000 $65.000 $97.000 $94.500 $130.000 $103.420
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $40.000 $25.000 $80.000 $11.000 $42.470
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 29,774.000 $0.200 $0.140 $0.140 $0.130 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 29,774.000 $0.200 $0.140 $0.140 $0.130 $0.140
WK ZN PAV MRK REMOV (REFL) TY II-A-A
LF 104.000 $2.500 $7.500 $5.250 $8.000 $8.040
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,000.000 $1.000 $1.000 $0.740 $0.900 $0.980
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $0.500 $5.500 $16.800 $5.100 $5.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,000.000 $0.250 $1.000 $0.740 $0.900 $0.980
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,977.000 $2.250 $1.000 $1.500 $0.500 $1.940
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,849.000 $0.800 $0.600 $0.890 $0.600 $0.620
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 87.000 $15.000 $3.500 $14.700 $4.000 $3.790
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 58,844.000 $0.500 $0.880 $0.660 $0.800 $0.940
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 57,528.000 $0.500 $0.880 $0.660 $0.800 $0.940
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 2,075.000 $0.500 $0.880 $0.890 $0.900 $0.940
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 58,844.000 $0.300 $0.360 $0.280 $0.400 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,075.000 $0.300 $0.360 $0.410 $0.400 $0.380
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 57,528.000 $0.300 $0.360 $0.280 $0.400 $0.380
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 112.000 $20.000 $19.500 $12.600 $19.000 $20.680
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $185.000 $325.000 $210.000 $325.000 $344.740
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $240.000 $435.000 $241.500 $425.000 $459.660
REFL PAV MRKR TY I-C
EA 244.000 $3.000 $3.250 $5.250 $3.100 $3.450
REFL PAV MRKR TY II-A-A
EA 3,084.000 $3.000 $3.250 $2.310 $3.100 $3.450
TEMP TRAF SIGNALS
EA 2.000 $24,000.000 $10,000.000 $14,100.000 $35,000.000 $12,595.020
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $17,000.270 $6,000.000 $17,850.000 $25,000.000 $22,529.980
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,300.000 $8,500.000 $5,250.000 $7,633.000 $9,972.020
Totals: $7,073,009.160 $5,983,269.300 $6,472,682.620 $7,150,385.680 $7,837,396.855