Show Job Controls
Bid Cobra

REEVES US 285 (0139-03-048)

Items: 142

County: REEVES
Length: N/A
Highway: US 285
District: ODESSA
Control Number: 0139-03-048
DBE Goal: N/A
Project: BR 2022(580)
Guaranty: N/A
Time: 360 WORKING DAYS
Engineer's Estimate: $37,501,579.60
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT & SUPER 2
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$37,501,579.60
Over/Under Est: 22.78% $8,541,663.19
$50,810,186.85
Over/Under Est: 35.49% $13,308,607.25
Amt Left: 10.35% $4,766,944.06
$59,486,963.28
Over/Under Est: 58.63% $21,985,383.68
Amt Left: 29.2% $13,443,720.49
Delta: -17.08% -$8,676,776.43
Subcontractor Percentage Amount
RELMCO, INC. 11.24% $5,258,569.59
COPPELL CONSTRUCTION CO., INC. 7.11% $3,326,372.75
R.E.B.D. TRUCKING LLC 4.27% $1,997,695.03
HJC FARMS, INC. 2.58% $1,207,038.21
J. H. ODEN CONTRACTING COMPANY 1.07% $500,593.37
TEXAS SHAFTS, INC. 0.89% $416,381.40
DOUBLE A CONTRACTING, L.P. 0.66% $308,777.22
WILLIS ELECTRIC CO., LP 0.57% $266,671.23
TEXOP CONSTRUCTION 0.52% $243,279.02
DESERT PAVING, INC. 0.46% $215,208.36
BARRICADES UNLIMITED 0.26% $121,639.51
HERMANOS STEEL, LLC 0.04% $18,713.77
FIBERTEX, LLC 0.03% $14,035.33
PENHALL COMPANY 0.03% $14,035.33
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.01% $4,678.44
Total: 29.74% $13,913,688.56

Bid Items & Bid Tabulations

142 Total 0 of 142
REEVES  |  US 285  |  ODESSA  |  0139-03-048  |  06/29/2022  |  $37,501,579.60  |  BR 2022(580)  |  BRIDGE REPL & SUPER 2  |  360 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
DAN WILLIAMS COMPANY
REMOVING CONC (RIPRAP)
SY 1,105.000 $22.000 $11.500 $35.000 $10.000
REMOVING CONC (MEDIANS)
SY 550.000 $16.000 $23.250 $45.000 $10.000
REMOVING CONC (DRIVEWAYS)
SY 982.000 $16.000 $35.000 $50.000 $9.000
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 11,405.000 $7.000 $15.000 $15.000 $2.750
EXCAVATION (ROADWAY)
CY 14,125.000 $10.000 $12.500 $12.250 $13.250
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 52,477.000 $13.000 $21.000 $19.500 $14.250
BACKFILL (TY B)
STA 564.000 $150.000 $300.000 $375.000 $225.000
BLADING
HR 50.000 $200.000 $350.000 $250.000 $135.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 232,072.000 $0.100 $0.180 $0.250 $0.120
PROOF ROLLING
HR 50.000 $120.000 $150.000 $200.000 $67.250
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 56,647.000 $10.500 $17.000 $12.250 $18.000
PRIME COAT (AE-P)
GAL 51,782.000 $5.000 $4.600 $1.850 $5.150
FOG SEAL (CSS-1H)
GAL 186,867.000 $3.500 $3.950 $1.600 $5.150
ASPH (AC-20-5TR)
GAL 139,235.000 $7.000 $5.310 $6.300 $5.350
AGGR(TY-PB GR-4 SAC-A)
CY 3,331.000 $130.000 $129.000 $180.000 $230.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 180,600.000 $32.000 $41.000 $33.000 $53.000
STRUCT EXCAV
CY 4,579.000 $13.000 $15.750 $21.000 $1.000
CEM STABIL BKFL
CY 2,793.000 $150.000 $136.500 $350.000 $210.000
CUT & RESTORING PAV
SY 1,069.000 $150.000 $92.400 $165.000 $100.000
TRENCH EXCAVATION PROTECTION
LF 586.000 $4.000 $15.750 $7.650 $4.000
TEMPORARY SPL SHORING
SF 5,484.000 $25.000 $36.750 $50.000 $50.000
DRILL SHAFT (36 IN)
LF 560.000 $300.000 $411.600 $600.000 $375.000
DRILL SHAFT (42 IN)
LF 552.000 $350.000 $632.100 $700.000 $475.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 24.000 $300.000 $472.500 $600.000 $475.000
CL B CONC (FLUME)
CY 5.400 $600.000 $1,139.250 $2,500.000 $1,200.000
CL C CONC (ABUT)
CY 74.000 $1,200.000 $1,680.000 $2,500.000 $1,250.000
CL C CONC (CAP)
CY 127.600 $1,400.000 $1,283.100 $3,200.000 $1,850.000
CL C CONC (COLUMN)
CY 116.800 $1,400.000 $1,302.000 $3,500.000 $1,150.000
REINF CONC SLAB (HPC)
SF 24,500.000 $25.000 $28.350 $50.000 $30.000
APPROACH SLAB (HPC)
CY 109.200 $900.000 $1,050.000 $1,500.000 $750.000
PRESTR CONC GIRDER (TX28)
LF 2,780.000 $180.000 $256.200 $400.000 $225.000
RIPRAP (CONC)(5 IN)
CY 223.000 $675.000 $509.250 $700.000 $500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 185.000 $600.000 $850.500 $595.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 227.000 $420.000 $682.500 $930.000 $600.000
RAIL (TY SSTR)(HPC)
LF 748.000 $100.000 $147.000 $150.000 $75.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 210.000 $225.000 $226.800 $300.000 $200.000
CONC BOX CULV (3 FT X 2 FT)
LF 1,033.000 $300.000 $365.400 $265.000 $275.000
CONC BOX CULV (5 FT X 3 FT)
LF 229.000 $500.000 $611.100 $430.000 $450.000
CONC BOX CULV (6 FT X 3 FT)
LF 153.000 $290.000 $748.650 $505.000 $575.000
CONC BOX CULV (6 FT X 6 FT)
LF 930.000 $800.000 $952.350 $605.000 $700.000
CONC BOX CULV (7 FT X 3 FT)
LF 213.000 $470.000 $863.100 $545.000 $600.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 70.000 $600.000 $2,076.900 $1,150.000 $800.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 7.000 $525.000 $1,960.350 $1,200.000 $1,100.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 24.000 $630.000 $1,519.350 $1,245.000 $800.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 9.000 $780.000 $1,976.100 $1,320.000 $1,100.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 656.000 $720.000 $834.750 $980.000 $550.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 32.000 $700.000 $1,118.250 $1,305.000 $1,200.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 90.000 $1,050.000 $1,228.500 $1,185.000 $825.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 185.000 $1,000.000 $920.850 $1,280.000 $1,000.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $13,000.000 $24,019.800 $36,315.000 $32,000.000
WINGWALL (FW - S) (HW=7 FT)
EA 2.000 $17,700.000 $23,520.000 $28,305.000 $50,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $19,300.000 $46,893.000 $43,250.000 $35,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 25.000 $10,000.000 $8,687.700 $13,720.000 $8,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 9.000 $6,000.000 $9,275.700 $14,360.000 $8,600.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 6.000 $10,200.000 $10,378.200 $13,390.000 $10,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
EA 2.000 $13,800.000 $10,231.200 $18,395.000 $12,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 1.000 $11,000.000 $11,539.500 $13,735.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 2.000 $11,000.000 $12,568.500 $17,845.000 $12,500.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 2.000 $12,000.000 $13,230.000 $19,735.000 $14,000.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 28.000 $7,900.000 $13,671.000 $12,520.000 $13,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
EA 8.000 $11,000.000 $15,596.700 $14,330.000 $14,000.000
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
EA 12.000 $21,100.000 $20,668.200 $13,500.000 $16,000.000
REMOV STR (SET)
EA 22.000 $600.000 $840.000 $2,500.000 $1,250.000
REMOV STR (WINGWALL)
EA 7.000 $1,400.000 $840.000 $3,000.000 $1,700.000
REMOV STR (BOX CULVERT)
LF 3.000 $90.000 $52.500 $2,500.000 $500.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $90,000.000 $112,148.400 $350,000.000 $75,000.000
MOBILIZATION
LS 1.000 $3,500,000.000 $3,000,000.000 $5,839,000.000 $2,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $15,000.000 $12,000.000 $53,000.000 $10,000.000
ROCK FILTER DAMS (REMOVE)
LF 2,880.000 $10.000 $15.750 $12.250 $28.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 440.000 $25.000 $44.000 $45.000 $32.750
CONSTRUCTION EXITS (REMOVE)
SY 440.000 $12.500 $20.000 $15.500 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 29,244.000 $8.500 $6.830 $10.000 $6.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 29,244.000 $2.200 $1.050 $1.550 $1.050
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 2,880.000 $80.000 $72.450 $80.000 $80.500
CONSTRUCTING DETOURS
SY 24,869.000 $55.000 $60.000 $45.000 $65.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 6,660.000 $35.000 $33.600 $125.000 $95.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 12,720.000 $5.000 $12.600 $12.000 $3.750
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 6,660.000 $10.000 $21.000 $17.000 $28.000
DRIVEWAYS (CONC)
SY 838.000 $100.000 $205.000 $180.000 $110.000
DRIVEWAYS (ACP)
SY 12,081.000 $75.000 $75.000 $80.000 $70.000
RUMBLE STRIPS (SHOULDER)
LF 114,475.000 $0.200 $0.140 $0.200 $0.130
RUMBLE STRIPS (CENTERLINE)
LF 68,025.000 $0.300 $0.190 $0.250 $0.180
CONC MEDIAN
SY 548.000 $90.000 $148.050 $90.000 $105.000
CONCRETE MEDIAN (NOSE)
SY 2.000 $120.000 $156.450 $2,500.000 $450.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,113.000 $35.000 $36.750 $46.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,600.000 $1,575.000 $1,835.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $1,000.000 $2,808.750 $1,180.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,150.000 $3.000 $3.150 $3.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $315.000 $600.000 $350.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $315.000 $400.000 $350.000
RM MTL BM GD FEN TRANS (T101)
EA 2.000 $300.000 $315.000 $600.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,500.000 $3,675.000 $4,305.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $350.000 $315.000 $600.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 43.000 $2,000.000 $2,625.000 $1,500.000 $750.000
CRASH CUSH ATTEN (REMOVE)
EA 25.000 $850.000 $1,575.000 $2,000.000 $700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 25.000 $8,500.000 $7,875.000 $15,000.000 $10,000.000
CONDT (PVC) (SCH 40) (3")
LF 1,265.000 $16.000 $24.150 $30.000 $23.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 240.000 $35.000 $78.750 $97.000 $75.000
ELEC CONDR (NO.6) BARE
LF 1,505.000 $2.000 $2.630 $3.250 $2.500
ELEC CONDR (NO.6) INSULATED
LF 50.000 $1.700 $3.150 $3.900 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 640.000 $2.100 $6.300 $7.750 $6.000
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,200.000 $2,730.000 $3,355.000 $2,600.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $5,000.000 $10,500.000 $13,000.000 $10,000.000
ALUMINUM SIGNS (TY A)
SF 33.000 $35.000 $63.000 $40.000 $60.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 30.000 $640.000 $1,076.250 $1,340.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,200.000 $1,417.500 $1,765.000 $1,100.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $450.000 $446.250 $555.000 $625.000
REMOVE SM RD SN SUP&AM
EA 6.000 $125.000 $150.000 $130.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 22.000 $115.000 $178.500 $222.000 $95.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 68.000 $47.000 $48.830 $40.000 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 192,873.000 $0.200 $0.150 $0.250 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 225,523.000 $0.200 $0.150 $0.250 $0.140
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,524.000 $1.750 $1.050 $1.050 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,980.000 $0.850 $1.000 $1.000 $0.950
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,575.000 $5.500 $3.150 $3.050 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 17,290.000 $0.750 $0.480 $0.500 $0.460
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 114,475.000 $0.700 $0.440 $0.450 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 137,810.000 $0.700 $0.440 $0.450 $0.420
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 48.000 $42.000 $18.900 $18.500 $18.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 32.000 $367.000 $336.000 $325.000 $320.000
PREFAB PAV MRK TY B (W)(WORD)
EA 20.000 $1,491.000 $367.500 $355.000 $350.000
REFL PAV MRKR TY I-C
EA 997.000 $5.250 $3.680 $3.550 $3.500
REFL PAV MRKR TY II-A-A
EA 3,401.000 $4.000 $3.410 $3.300 $3.250
ELIM EXT PAV MRK & MRKS (4")
LF 82,584.000 $0.350 $0.630 $1.000 $0.600
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $25,000.000 $40,950.000 $50,500.000 $39,000.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $250.000 $472.500 $580.000 $450.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $250.000 $472.500 $580.000 $450.000
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 4.000 $80.000 $73.500 $90.000 $70.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 4.000 $110.000 $183.750 $225.000 $175.000
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
LF 1,325.000 $1.750 $3.680 $4.500 $3.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 220.000 $1.800 $5.780 $7.000 $5.500
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 245.000 $3.200 $7.610 $9.000 $7.250
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $4,200.000 $14,700.000 $18,000.000 $14,000.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 2.000 $9,000.000 $24,150.000 $30,000.000 $23,000.000
SP MIXES SP-B SAC-B PG70-22
TON 90,507.000 $82.000 $116.750 $115.000 $220.000
TACK COAT
GAL 36,302.000 $4.000 $3.710 $6.500 $6.250
STONE-MTRX-ASPH SMAR-F SAC-A
TON 40,305.000 $120.000 $158.000 $155.000 $235.000
BONDING COURSE
GAL 36,640.000 $3.000 $4.300 $6.250 $6.000
TIP TESTING(DRILL SHAFT)
EA 12.000 $5,000.000 $3,255.000 $10,000.000 $4,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $22,000.000 $30,000.000 $9,000.000
TMA (STATIONARY)
DAY 352.000 $250.000 $110.000 $220.000 $300.000
TMA (MOBILE OPERATION)
DAY 360.000 $450.000 $450.000 $460.000 $495.000
Totals: $37,501,579.600 $46,043,242.790 $50,810,186.850 $59,486,963.280