Show Job Controls
Bid Cobra

REEVES SH 17 (0103-01-046)

Items: 57

County: REEVES
Length: 0.0000 MILES
Highway: SH 17
District: ODESSA
Control Number: 0103-01-046
DBE Goal: 0.0%
Project: F 2B24(005)
Guaranty: $35,000.00
Time: 147 WORKING DAYS
Engineer's Estimate: $1,728,243.44
Date: 02/04/2026 (4 months ago)
Contract Number: 2263027
Type: INTERSECTION IMPROVEMENT
Project ID: A00196734
Contract Type: Federal
Project Description: INSTALL TURN LANES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,728,243.44
$1,752,099.90
Over/Under Est: 1.38% $23,856.46
$1,839,247.35
Over/Under Est: 6.42% $111,003.91
Amt Left: 4.97% $87,147.45
Over/Under Est: 31.83% $550,137.06
Amt Left: 30.04% $526,280.60
Delta: -23.88% -$439,133.15
Over/Under Est: 78.41% $1,355,122.41
Amt Left: 75.98% $1,331,265.95
Delta: -35.33% -$804,985.35

Bid Items & Bid Tabulations

57 Total 0 of 57
REEVES  |  SH 17  |  ODESSA  |  0103-01-046  |  02/04/2026  |  $1,728,243.44  |  F 2B24(005)  |  INTERS IMPRV  |  147 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
CK NEWBERRY, LLC
RAGLE CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOV CONC (DRIVEWAYS)
SY 424.000 $27.000 $45.000 $25.000 $14.000 $9.810
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 1,418.000 $15.000 $30.000 $15.000 $21.000 $32.070
EXCAV (ROADWAY)
CY 1,883.000 $30.000 $12.000 $25.000 $50.000 $54.920
EMBANK (FNL)(DC)(TY B)
CY 779.000 $27.000 $32.000 $20.000 $40.000 $51.220
BACKFILL (TY B)
STA 61.790 $356.000 $300.000 $215.000 $500.000 $953.650
BLADING
HR 20.000 $127.000 $250.000 $300.000 $183.000 $431.600
PROOF ROLLING
HR 20.000 $115.000 $150.000 $190.000 $150.000 $169.070
FL BS (CMP IN PLC)(TY A GR 4) (10")
SY 6,619.000 $25.000 $21.000 $25.000 $26.000 $47.760
PRIME COAT (AE-P)
GAL 1,325.000 $5.200 $6.000 $7.500 $7.900 $12.250
ASPH (AC-20-5TR)
GAL 5,030.000 $5.000 $4.750 $5.500 $10.000 $7.820
AGGR (TY-PB, GR-3)(SAC-A)
CY 56.000 $275.000 $350.000 $280.000 $150.000 $491.570
AGGR (TY-PB, GR-4)(SAC-A)
CY 76.000 $240.000 $350.000 $230.000 $150.000 $386.680
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 400.000 $100.000 $140.000 $150.000 $120.000 $165.650
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 128.000 $425.000 $560.000 $550.000 $500.000 $575.000
RIPRAP (CONC)(4 IN)
CY 5.600 $758.000 $2,000.000 $2,500.000 $1,500.000 $2,300.000
MOBILIZATION
LS 1.000 $120,000.000 $155,000.000 $180,000.000 $220,000.000 $497,960.010
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $25,000.000 $29,300.000 $12,500.000 $74,200.000 $75,000.000
TMA (STATIONARY)
DAY 88.000 $260.000 $240.000 $400.000 $346.000 $187.500
TMA (MOBILE OPERATION)
DAY 2.000 $350.000 $240.000 $30.000 $685.000 $1,312.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 6,205.000 $10.000 $8.500 $10.000 $9.450 $11.580
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,205.000 $2.800 $1.000 $3.000 $2.000 $2.780
ONE-WAY TRAF CONT (PILOT CAR)
HR 20.000 $120.000 $200.000 $150.000 $69.000 $148.260
DRIVEWAYS (CONC)
SY 549.000 $140.000 $140.000 $150.000 $110.000 $345.000
IN RD IL (TY AL) 40T-10 (250W EQ) LED
EA 16.000 $9,860.000 $9,000.000 $10,000.000 $8,250.000 $9,487.500
CONDT (PVC) (SCH 80) (2")
LF 2,875.000 $15.700 $10.000 $10.000 $9.000 $10.350
CONDT (PVC) (SCH 80) (2") (BORE)
LF 255.000 $36.000 $23.000 $20.000 $20.000 $23.000
ELEC CONDR (NO.6) BARE
LF 3,223.000 $2.000 $3.000 $3.000 $2.500 $2.880
ELEC CONDR (NO.6) INSULATED
LF 6,980.000 $2.500 $3.100 $3.000 $2.750 $3.160
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,703.000 $2,500.000 $2,500.000 $2,250.000 $2,587.500
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $9,000.000 $13,000.000 $12,000.000 $11,500.000 $13,225.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $900.000 $800.000 $1,500.000 $1,250.000 $880.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $1,300.000 $830.000 $1,500.000 $1,375.000 $967.150
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,000.000 $940.000 $1,500.000 $1,450.000 $1,135.050
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,350.000 $1,000.000 $2,000.000 $1,700.000 $1,521.450
REMOVE SM RD SN SUP&AM
EA 6.000 $150.000 $120.000 $200.000 $150.000 $390.450
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 402.000 $4.900 $4.500 $6.000 $5.000 $5.750
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 14,250.000 $1.000 $0.750 $1.000 $0.750 $0.860
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 296.000 $10.100 $8.000 $15.000 $12.000 $13.800
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 410.000 $1.650 $0.750 $2.000 $1.250 $1.440
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 15,890.000 $1.050 $0.750 $1.000 $0.750 $0.860
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 300.000 $1.400 $1.300 $2.000 $1.500 $5.440
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 200.000 $1.300 $1.300 $2.000 $1.500 $7.910
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 217.000 $1.500 $2.700 $2.000 $1.250 $1.440
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,250.000 $1.110 $1.700 $2.000 $1.250 $1.440
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 8,634.000 $0.800 $1.200 $2.000 $1.300 $1.500
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 10,126.000 $1.300 $1.200 $2.000 $1.300 $1.500
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 710.000 $0.800 $2.300 $2.000 $1.300 $1.500
PREFAB PM TY C (W)(24")(SLD)
LF 44.000 $16.000 $24.000 $20.000 $15.000 $17.250
PREFAB PM TY C (W)(ARROW)
EA 4.000 $300.000 $350.000 $500.000 $300.000 $345.000
PREFAB PM TY C (W)(WORD)
EA 4.000 $400.000 $390.000 $500.000 $400.000 $460.000
REFL PAV MRKR TY I-C
EA 64.000 $4.000 $6.000 $10.000 $5.000 $5.750
REFL PAV MRKR TY II-A-A
EA 649.000 $4.000 $4.500 $10.000 $5.000 $5.750
ELIM EXT PM & MRKS (4")
LF 8,458.000 $0.750 $1.000 $5.000 $1.000 $5.360
TREE TRIMMING / BRUSH REMOVAL
MI 0.580 $60,000.000 $18,000.000 $6,000.000 $5,000.000 $14,457.930
SOLAR POWERED LED ROADSIDE SIGN
EA 2.000 $6,000.000 $5,500.000 $15,000.000 $11,500.000 $13,225.000
1
STONE-MTRX-ASPH SMAR-F SAC-A
TON 0.000 $178.000 $0.000 $0.000 $0.000 $0.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 2,063.000 $178.000 $178.000 $200.000 $190.000 $203.160
Totals: $1,728,243.440 $1,752,099.900 $1,839,247.350 $2,278,380.500 $3,083,365.853
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $61,000.00