|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,375.000
|
$15.000
|
$4.300
|
$7.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
3,200.000
|
$36.000
|
$4.250
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
6,418.000
|
$12.000
|
$14.000
|
$14.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,585.000
|
$50.000
|
$12.000
|
$22.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
17,828.000
|
$40.000
|
$50.000
|
$40.000
|
|
|
BLADING
|
HR
|
74.000
|
$300.000
|
$149.000
|
$80.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
31,403.000
|
$0.500
|
$0.550
|
$0.600
|
|
|
PROOF ROLLING
|
HR
|
74.000
|
$145.000
|
$85.000
|
$350.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
4,308.000
|
$3.000
|
$1.750
|
$5.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
862.000
|
$35.000
|
$10.000
|
$14.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 1")
|
SY
|
3,909.000
|
$20.000
|
$8.000
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
504.000
|
$240.000
|
$400.000
|
$385.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
12,572.000
|
$24.000
|
$21.750
|
$50.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
140.000
|
$300.000
|
$350.000
|
$308.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,206.000
|
$400.000
|
$445.000
|
$575.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
138.000
|
$1,135.000
|
$1,500.000
|
$1,265.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
184.000
|
$1,500.000
|
$2,500.000
|
$1,255.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
75.000
|
$2,575.000
|
$2,100.000
|
$1,400.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
39,774.000
|
$36.000
|
$45.000
|
$36.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
186.000
|
$1,000.000
|
$1,050.000
|
$966.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
921.000
|
$215.000
|
$305.000
|
$325.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,232.000
|
$245.000
|
$300.000
|
$310.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
179.000
|
$715.000
|
$1,050.000
|
$900.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
134.000
|
$690.000
|
$800.000
|
$933.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
342.000
|
$165.000
|
$175.000
|
$200.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,808.000
|
$80.000
|
$95.000
|
$172.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
295.000
|
$255.000
|
$225.000
|
$254.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,852.000
|
$700.000
|
$775.000
|
$1,115.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
721.000
|
$850.000
|
$950.000
|
$1,300.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
152.000
|
$1,000.000
|
$1,200.000
|
$1,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
3.000
|
$20,000.000
|
$15,000.000
|
$10,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
6.000
|
$11,000.000
|
$30,000.000
|
$23,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$11,000.000
|
$40,000.000
|
$22,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$1,000.000
|
$1,400.000
|
$4,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$3,000.000
|
$2,500.000
|
$5,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2,872.000
|
$180.000
|
$55.000
|
$60.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$190,000.000
|
$200,000.000
|
$175,000.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$300,000.000
|
$300,000.000
|
$300,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,300,000.000
|
$1,650,000.000
|
$1,820,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$17,500.000
|
$35,000.000
|
$9,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
4,621.000
|
$10.000
|
$7.600
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,621.000
|
$3.000
|
$1.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,519.000
|
$90.000
|
$127.000
|
$225.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$7,000.000
|
$3,500.000
|
$6,500.000
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
4,103.000
|
$90.000
|
$85.000
|
$114.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
6,348.000
|
$25.000
|
$7.500
|
$15.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
3,203.000
|
$40.000
|
$30.000
|
$15.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
14,280.000
|
$0.400
|
$0.640
|
$1.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,225.000
|
$35.000
|
$35.000
|
$31.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$75.000
|
$100.000
|
$122.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
7.000
|
$2,600.000
|
$2,000.000
|
$2,390.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,375.000
|
$5.000
|
$7.250
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$3,500.000
|
$4,200.000
|
$3,550.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$5,800.000
|
$800.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
11.000
|
$1,500.000
|
$750.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
11.000
|
$30,000.000
|
$10,000.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$750.000
|
$1,800.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$1,100.000
|
$2,000.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$140.000
|
$135.000
|
$580.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
20.000
|
$23.000
|
$80.000
|
$46.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$23.000
|
$80.000
|
$46.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
7.000
|
$23.000
|
$57.000
|
$29.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
17.000
|
$25.000
|
$57.000
|
$29.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
4,863.000
|
$0.500
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
1,318.000
|
$0.500
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
432.000
|
$7.000
|
$8.000
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
42,444.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
300.000
|
$5.000
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$6.500
|
$20.000
|
$23.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
62,505.000
|
$2.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
400.000
|
$2.000
|
$3.000
|
$3.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
4,390.000
|
$0.750
|
$1.400
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(060MIL)
|
LF
|
23,293.000
|
$0.700
|
$1.400
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,653.000
|
$0.900
|
$1.400
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
24,453.000
|
$0.700
|
$1.400
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
135.000
|
$5.500
|
$10.000
|
$11.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
701.000
|
$7.000
|
$8.000
|
$9.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
19,753.000
|
$1.200
|
$1.900
|
$0.850
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
400.000
|
$3.000
|
$4.800
|
$1.000
|
|
|
SP MIXES SP-B PG70-22
|
TON
|
3,791.000
|
$275.000
|
$310.000
|
$340.000
|
|
|
TOM-C SAC-A
|
TON
|
806.000
|
$300.000
|
$450.000
|
$725.000
|
|
|
TACK COAT
|
GAL
|
642.000
|
$12.000
|
$18.000
|
$16.000
|
|
|
BONDING COURSE
|
GAL
|
1,065.000
|
$10.000
|
$10.000
|
$19.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
12.000
|
$25,000.000
|
$14,000.000
|
$17,500.000
|
|
|
AUTO PORT SMRT TRF MONITOR SYS (PLAN 1)
|
DAY
|
492.000
|
$245.000
|
$400.000
|
$390.000
|
|
|
TMA (STATIONARY)
|
DAY
|
313.000
|
$270.000
|
$190.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
54.000
|
$485.000
|
$515.000
|
$400.000
|
|
Totals: |
$15,342,540.500
|
$16,682,423.500
|
$18,369,268.350
|