REEVES IH 20 (0003-06-096)

Items: 53

County: REEVES
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0003-06-096
DBE Goal: N/A
Project: BR 2021(627)
Guaranty: N/A
Time: 125 WORKING DAYS
Engineer's Estimate: $889,939.00
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$889,939.00
$983,847.25
Over/Under Est: 10.55% $93,908.25
Over/Under Est: 27.49% $244,610.30
Amt Left: 15.32% $150,702.05
Over/Under Est: 31.42% $279,592.52
Amt Left: 18.87% $185,684.27
Delta: -3.08% -$34,982.22

Bid Items & Bid Tabulations

53 Total 0 of 53
REEVES  |  IH 20  |  ODESSA  |  0003-06-096  |  06/04/2021  |  $889,939.00  |  BR 2021(627)  |  BRIDGE MAINT  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCR CIVIL CONSTRUCTION, LLC
DAVIS CONSTRUCTION TEXAS INC.
RAGLE CONSTRUCTION, INC.
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,060.000 $1.500 $4.000 $1.750 $3.000
ASPH (AC-20-5TR)
GAL 1,859.000 $5.000 $29.000 $14.570 $12.000
AGGR(TY-PB GR-4 SAC-B)
CY 42.000 $115.000 $975.000 $606.240 $300.000
PLANE ASPH CONC PAV (5")
SY 100.000 $20.000 $142.000 $71.340 $50.000
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
SY 1,859.000 $7.000 $25.000 $11.920 $50.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 2,128.000 $14.000 $15.600 $12.720 $32.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 199.000 $200.000 $201.000 $121.800 $140.000
RIPRAP (MOW STRIP)(4 IN)
CY 28.400 $500.000 $1,063.000 $623.700 $600.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,008.000 $40.000 $25.000 $28.050 $32.000
RETROFIT RAIL (TY T552)
LF 517.000 $160.000 $207.000 $284.610 $175.000
GABION MATTRESSES (GALV)(6 IN)
SY 8.000 $100.000 $940.000 $138.390 $120.000
MOBILIZATION
LS 1.000 $81,000.000 $92,000.000 $123,000.000 $120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $9,000.000 $5,500.000 $5,996.250 $15,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 850.000 $4.000 $8.000 $2.460 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 850.000 $1.500 $2.250 $0.130 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 600.000 $5.000 $10.000 $4.920 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $1.500 $2.250 $0.130 $1.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 2,580.000 $30.000 $8.000 $41.710 $20.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,580.000 $7.000 $15.000 $8.730 $10.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,580.000 $13.000 $8.000 $9.550 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 325.000 $27.000 $33.350 $43.050 $35.220
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,720.000 $2,706.000 $2,636.890
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,400.000 $1,491.000 $1,968.000 $1,575.050
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,000.000 $1,000.000 $1,230.000 $1,055.940
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $3.000 $2.000 $3.690 $2.060
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $230.000 $184.500 $241.860
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $3,602.000 $3,321.000 $3,804.900
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $225.000 $307.500 $235.970
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $2,000.000 $300.000 $1,230.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,000.000 $300.000 $738.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $8,000.000 $7,500.000 $7,995.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 86.000 $20.000 $35.000 $49.200 $12.800
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 8.000 $25.000 $45.000 $36.900 $32.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 86.000 $20.000 $35.000 $36.900 $12.800
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 8.000 $25.000 $45.000 $30.750 $32.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,560.000 $0.600 $2.500 $1.870 $1.770
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,280.000 $0.600 $2.500 $2.340 $1.770
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 396.000 $1.000 $3.350 $9.330 $1.110
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,320.000 $0.500 $2.250 $3.740 $2.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,280.000 $0.500 $2.250 $2.580 $2.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 5,280.000 $0.500 $2.250 $2.580 $2.300
REFL PAV MRKR TY II-C-R
EA 67.000 $3.000 $11.200 $1.230 $17.720
ELIM EXT PAV MRK & MRKS (4")
LF 7,680.000 $0.600 $1.700 $1.620 $1.120
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 27.000 $170.000 $120.000 $182.230 $100.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 322.000 $50.000 $22.000 $41.600 $50.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 979.000 $60.000 $37.000 $47.940 $70.000
CONCRETE BEAM REPAIR
EA 58.000 $1,500.000 $930.000 $2,805.710 $2,000.000
SP MIXES SP-C SAC-A PG76-22
TON 28.000 $250.000 $600.000 $333.860 $150.000
TACK COAT
GAL 15.000 $10.000 $30.000 $229.610 $21.000
REPLACE ELASTOMERIC BEARING PADS
EA 6.000 $8,000.000 $5,250.000 $3,378.410 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $4,360.000 $9,840.000 $100.000
TMA (STATIONARY)
DAY 107.000 $180.000 $250.000 $123.000 $250.000
TMA (MOBILE OPERATION)
DAY 20.000 $175.000 $450.000 $307.500 $900.000
Totals: $889,939.000 $983,847.250 $1,134,549.300 $1,169,531.520