Show Job Controls
Bid Cobra

RED RIVER BU0082J (6457-51-001)

Items: 18

County: RED RIVER
Length: N/A
Highway: BU0082J
District: PARIS
Control Number: 6457-51-001
DBE Goal: 0.0%
Project: BPM - 645751001
Guaranty: N/A
Time: 48 W
Engineer's Estimate: $175,710.00
Date: 05/16/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$175,710.00
1
$158,160.00
Over/Under Est: -9.99% -$17,550.00
Over/Under Est: -6.78% -$11,910.00
Amt Left: 3.57% $5,640.00
Over/Under Est: -3.64% -$6,390.00
Amt Left: 7.06% $11,160.00
Delta: -3.37% -$5,520.00
Over/Under Est: -3.27% -$5,740.85
Amt Left: 7.47% $11,809.15
Delta: -0.38% -$649.15
$180,790.00
Over/Under Est: 2.89% $5,080.00
Amt Left: 14.31% $22,630.00
Delta: -6.37% -$10,820.85
Over/Under Est: 6.54% $11,500.00
Amt Left: 18.37% $29,050.00
Delta: -3.55% -$6,420.00
Over/Under Est: 32.86% $57,740.00
Amt Left: 47.6% $75,290.00
Delta: -24.70% -$46,240.00

Bid Items & Bid Tabulations

18 Total 0 of 18
RED RIVER  |  BU0082J  |  PARIS  |  6457-51-001  |  05/16/2024  |  $175,710.00  |  BPM - 645751001  |  BRIDGE PREVENT MAINT  |  48 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
GARRET SHIELDS INFRASTRUCTURE
GV LANDSCAPE AND CONSTRUCTION LLC
A-1 DOT SOLUTIONS LLC
RB CONTRACTING, LLC
AAD CONTRACTING INC.
MB WESTERN INDUSTRIAL CONTRACTING CO.
EXCAVATION (SPECIAL)
CY 12.000 $30.000 $200.000 $200.000 $85.000 $4,000.000 $500.000 $15.000 $550.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 60.000 $65.000 $80.000 $50.000 $85.000 $216.600 $50.000 $45.000 $45.000
FLOWABLE BACKFILL
CY 5.000 $350.000 $1,000.000 $600.000 $250.000 $306.000 $300.000 $250.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 67.000 $300.000 $200.000 $200.000 $260.000 $52.179 $220.000 $180.000 $250.000
CONC STR REPAIR (STANDARD)
SF 78.000 $275.000 $200.000 $200.000 $260.000 $52.179 $100.000 $55.000 $1,200.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 2.000 $4,000.000 $5,000.000 $5,000.000 $7,000.000 $484.000 $2,500.000 $2,500.000 $3,200.000
RIPRAP (STONE COMMON)(GROUT)(8 IN)
CY 4.000 $300.000 $250.000 $200.000 $320.000 $200.000 $500.000 $300.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 19.000 $175.000 $300.000 $300.000 $320.000 $345.000 $200.000 $250.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $550.000 $650.000 $600.000 $600.000 $850.000 $550.000 $600.000 $550.000
MOBILIZATION
LS 1.000 $40,000.000 $15,000.000 $15,000.000 $15,000.000 $20,000.000 $25,000.000 $40,000.000 $15,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $2,000.000 $5,000.000 $3,000.000 $200.000 $12,000.000 $10,000.000 $2,500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $25.000 $39.000 $40.000 $100.000 $24.000 $35.000 $33.000 $35.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $30.000 $39.000 $40.000 $30.000 $30.250 $40.000 $33.000 $35.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $4,000.000 $3,500.000 $60.000 $2,189.000 $3,600.000 $3,000.000 $3,200.000
REPAIR (EXISTING METAL PED. RAIL)
LF 20.000 $35.000 $50.000 $100.000 $50.000 $120.000 $20.000 $250.000 $550.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 14.000 $100.000 $265.000 $100.000 $200.000 $121.300 $350.000 $120.000 $125.000
TMA (STATIONARY)
DAY 35.000 $185.000 $100.000 $300.000 $150.000 $5.000 $300.000 $350.000 $200.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 20.000 $100.000 $250.000 $200.000 $80.000 $200.000 $100.000 $500.000 $100.000
Totals: $175,710.000 $158,160.000 $163,800.000 $169,320.000 $169,969.155 $180,790.000 $187,210.000 $233,450.000