Show Job Controls
Bid Cobra

RED RIVER FM 1487 (2800-01-010)

Items: 101

County: RED RIVER
Length: N/A
Highway: FM 1487
District: PARIS
Control Number: 2800-01-010
DBE Goal: N/A
Project: F 2B23(054)
Guaranty: N/A
Time: 304 WORKING DAYS
Engineer's Estimate: $8,263,650.97
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$8,263,650.97
$6,756,221.98
Over/Under Est: -18.24% -$1,507,428.99
Over/Under Est: -12.21% -$1,009,180.07
Amt Left: 7.37% $498,248.92
$7,313,493.81
Over/Under Est: -11.5% -$950,157.16
Amt Left: 8.25% $557,271.83
Delta: -0.81% -$59,022.91
Over/Under Est: -10.86% -$897,159.44
Amt Left: 9.03% $610,269.55
Delta: -0.72% -$52,997.72
$10,480,768.50
Over/Under Est: 26.83% $2,217,117.53
Amt Left: 55.13% $3,724,546.52
Delta: -42.28% -$3,114,276.97
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 9.89% $675,653.71
WITHERS CONSTRUCTION, LLC 3.43% $234,326.82
STRIPING TECHNOLOGY, L.P. 2.83% $193,336.70
DUSTIN ALLEN, INC. 1.19% $81,297.06
MURRAY CONSTRUCTION 0.61% $41,673.28
PANOLA SIGN & BARRICADE, INC. 0.48% $32,792.09
ANCHOR CONTRACTING, LLC 0.37% $25,277.24
CHEROKEE SERVICES 0.16% $10,930.70
Total: 18.96% $1,295,287.60

Bid Items & Bid Tabulations

101 Total 0 of 101
RED RIVER  |  FM 1487  |  PARIS  |  2800-01-010  |  08/03/2023  |  $8,263,650.97  |  F 2B23(054)  |  REHAB EXIST ROADWAY  |  304 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. K. GILLIS & SONS, LLC
HIGHWAY 19 CONSTRUCTION LLC
H. V. CAVER, INC.
D. L. LENNON INCORPORATED - CONTRACTOR
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 316.270 $1,500.000 $840.000 $740.000 $4,687.350 $752.000 $2,650.000
EXCAVATION (CHANNEL)
CY 680.500 $30.000 $15.000 $25.000 $30.000 $25.000 $50.000
SUBGRADE WIDENING (ORD COMP)
STA 314.090 $162.000 $259.460 $300.000 $225.000 $300.000 $450.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 617.400 $30.000 $15.000 $30.000 $50.000 $35.000 $50.000
BACKFILL (TY A)
STA 314.090 $362.000 $620.500 $500.000 $350.000 $450.000 $400.000
ROAD GRADER WORK (ORD COMP)
STA 314.090 $178.000 $259.460 $250.000 $275.000 $310.000 $400.000
BROADCAST SEED (TEMP) (WARM)
SY 131,669.000 $0.090 $0.180 $0.120 $0.140 $0.140 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 131,669.000 $0.090 $0.180 $0.120 $0.140 $0.140 $0.500
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 263,338.000 $0.240 $0.410 $0.300 $0.340 $0.300 $0.500
VEGETATIVE WATERING
MG 1,580.100 $9.000 $3.250 $10.000 $1.000 $35.000 $20.000
FL BS (RDWY DEL) (TY A GR 4)
TON 50,163.530 $40.000 $44.090 $41.000 $31.400 $45.000 $50.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 72,942.000 $15.000 $2.120 $3.250 $3.750 $4.000 $4.500
CEMENT
TON 925.000 $250.000 $265.000 $235.000 $263.000 $300.000 $300.000
CEMENT TREAT (NEW BASE) (10")
SY 91,389.000 $8.000 $2.180 $3.750 $3.000 $4.500 $11.000
ASPH (AC-20XP)
GAL 75,210.200 $5.000 $4.990 $4.610 $5.110 $6.100 $6.000
ASPH (RC-250)
GAL 25,589.000 $7.000 $5.460 $5.060 $6.500 $5.900 $6.000
AGGR(TY-PB GR-4 SAC-A)
CY 767.300 $159.000 $200.860 $250.000 $159.000 $200.000 $350.000
AGGR(TY-B GR-3 SAC-B)
CY 871.000 $182.000 $140.760 $210.000 $108.000 $165.000 $350.000
AGGR(TY-B GR-5 SAC-B)
CY 653.000 $160.000 $133.180 $190.000 $108.000 $145.000 $350.000
CUT & RESTORING PAV
SY 67.000 $110.000 $100.000 $250.000 $150.000 $100.000 $200.000
FLOWABLE BACKFILL
CY 8.000 $275.000 $300.000 $350.000 $500.000 $300.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 45.000 $15.000 $15.000 $10.000 $20.000 $15.000 $10.000
TEMPORARY SPL SHORING
SF 784.000 $55.000 $80.000 $55.000 $57.000 $127.000 $85.000
RIPRAP (CONC)(5 IN)
CY 0.800 $500.000 $600.000 $5,000.000 $1,350.000 $600.000 $2,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 836.000 $172.000 $274.810 $180.000 $175.000 $225.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 31.400 $550.000 $600.000 $550.000 $555.000 $600.000 $650.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 175.000 $30.000 $62.500 $75.000 $71.030 $70.000 $100.000
RETROFIT RAIL (TY T631)
LF 463.300 $150.000 $72.000 $115.000 $73.000 $72.000 $185.000
CONC BOX CULV (7 FT X 5 FT)
LF 114.000 $1,000.000 $1,200.000 $1,100.000 $905.000 $1,200.000 $1,000.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 14.000 $1,300.000 $2,000.000 $1,500.000 $1,475.000 $2,000.000 $3,000.000
RC PIPE (CL III)(12 IN)
LF 20.000 $55.000 $50.000 $46.000 $43.550 $50.000 $85.000
RC PIPE (CL III)(15 IN)
LF 26.000 $65.000 $55.000 $46.000 $44.280 $55.000 $95.000
RC PIPE (CL III)(24 IN)
LF 147.000 $100.000 $90.000 $70.000 $74.090 $90.000 $150.000
RC PIPE (CL III)(30 IN)
LF 8.000 $150.000 $130.000 $110.000 $95.550 $130.000 $250.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $5,000.000 $8,000.000 $5,000.000 $16,120.000 $8,000.000 $12,500.000
HEADWALL (CH - FW - 30) (DIA= 30 IN)
EA 1.000 $7,500.000 $7,500.000 $4,500.000 $7,550.000 $7,500.000 $8,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $8,000.000 $8,000.000 $4,500.000 $6,800.000 $8,000.000 $8,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $9,000.000 $10,000.000 $7,500.000 $8,550.000 $10,000.000 $10,000.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 1.000 $10,000.000 $8,500.000 $7,500.000 $7,550.000 $8,500.000 $9,500.000
HEADWALL (CH - PW - S) (DIA= 72 IN)
EA 2.000 $30,000.000 $20,000.000 $15,000.000 $16,100.000 $20,000.000 $50,000.000
WINGWALL (PW - 2) (HW=10 FT)
EA 2.000 $27,000.000 $50,000.000 $61,000.000 $35,200.000 $50,000.000 $60,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $14,000.000 $38,000.000 $26,000.000 $18,200.000 $38,000.000 $45,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 42.000 $700.000 $550.000 $550.000 $555.000 $550.000 $850.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 12.000 $725.000 $600.000 $550.000 $555.000 $600.000 $950.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 43.000 $762.000 $800.000 $795.000 $720.000 $800.000 $1,250.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 20.000 $1,500.000 $1,000.000 $877.000 $1,177.500 $1,000.000 $2,500.000
CLEAN EXIST CULVERTS
EA 55.000 $2,000.000 $1,000.000 $1,000.000 $2,000.000 $1,000.000 $1,500.000
REMOV STR (PIPE)
LF 454.000 $28.000 $10.000 $50.000 $15.000 $10.000 $50.000
MOBILIZATION
LS 1.000 $747,685.950 $442,030.000 $1,000,000.000 $400,000.000 $327,500.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $6,000.000 $5,000.000 $1,800.000 $5,000.000 $7,260.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,620.000 $38.000 $46.000 $40.000 $45.000 $40.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 1,620.000 $9.000 $10.000 $10.000 $10.000 $9.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 666.000 $6.000 $30.000 $20.000 $22.000 $30.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 666.000 $2.400 $10.000 $10.000 $8.000 $10.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,497.000 $3.000 $4.000 $4.500 $10.000 $3.400 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,497.000 $1.000 $1.250 $1.000 $4.000 $0.500 $2.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $4,000.000 $4,500.000 $7,500.000 $5,000.000 $6,500.000 $7,500.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 570.000 $10.000 $25.000 $25.000 $20.000 $35.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 570.000 $12.000 $25.000 $10.000 $14.000 $35.000 $30.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 570.000 $10.000 $25.000 $25.000 $20.000 $35.000 $30.000
DRIVEWAYS (ACP)
SY 194.500 $56.400 $62.320 $75.000 $99.630 $85.000 $50.000
TURNOUTS (ACP)
SY 759.000 $83.000 $72.350 $85.000 $102.020 $104.000 $50.000
DRIVEWAYS (BASE)
SY 1,366.500 $30.000 $39.790 $35.000 $47.000 $35.000 $40.000
MTL W-BEAM GD FEN (STEEL POST)
LF 275.000 $29.500 $30.000 $35.000 $31.000 $30.000 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.500 $3.000 $4.000 $3.300 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $300.000 $300.000 $350.000 $310.000 $300.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,060.000 $3,050.000 $3,500.000 $3,100.000 $3,050.000 $3,250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,000.000 $2,000.000 $1,500.000 $2,100.000 $2,000.000 $6,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $800.000 $1,000.000 $810.000 $800.000 $3,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,000.000 $9,700.000 $8,500.000 $9,750.000 $9,700.000 $21,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 25.000 $347.000 $250.000 $275.000 $255.000 $260.000 $850.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 6.000 $520.000 $250.000 $280.000 $255.000 $290.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 42.000 $800.000 $625.000 $600.000 $630.000 $750.000 $1,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $900.000 $850.000 $1,200.000 $875.000 $1,200.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $900.000 $1,100.000 $1,540.000 $1,150.000 $1,780.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 46.000 $89.000 $100.000 $100.000 $110.000 $96.000 $150.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 10.000 $59.000 $75.000 $69.000 $76.000 $55.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $28.000 $30.000 $25.000 $32.000 $45.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $23.000 $32.000 $35.000 $33.000 $32.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 63,014.000 $0.150 $0.350 $0.350 $0.360 $0.350 $0.650
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 3,822.000 $0.250 $0.500 $0.500 $0.500 $0.500 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 40,718.000 $0.150 $0.350 $0.350 $0.360 $0.350 $0.650
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,010.000 $6.000 $4.500 $4.500 $4.500 $4.500 $6.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 3,376.000 $3.000 $2.000 $2.000 $2.100 $2.000 $2.250
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 44.000 $10.000 $12.000 $12.000 $12.000 $12.000 $20.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 12,000.000 $2.000 $2.000 $2.000 $2.050 $2.000 $2.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,516.000 $2.000 $2.250 $1.000 $1.800 $3.000 $3.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 100.000 $3.000 $5.000 $5.000 $5.000 $5.000 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 48.000 $24.600 $8.000 $8.000 $8.000 $8.000 $10.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 5.000 $50.000 $125.000 $125.000 $125.000 $125.000 $250.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 63,014.000 $0.650 $1.000 $1.000 $1.040 $1.000 $1.250
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 3,822.000 $0.650 $1.500 $1.500 $1.550 $1.500 $1.750
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 40,718.000 $0.650 $1.000 $1.000 $1.010 $1.000 $1.250
REFL PAV MRKR TY II-A-A
EA 698.000 $3.200 $4.000 $4.000 $4.000 $4.000 $5.000
ELIM EXT PAV MRK & MRKS (6")
LF 15,376.000 $1.000 $0.350 $0.350 $0.350 $0.350 $0.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,000.000 $15,000.000 $20,000.000 $16,000.000 $28,000.000 $16,500.000
TMA (STATIONARY)
DAY 355.000 $200.000 $75.000 $250.000 $200.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 96.000 $32.000 $75.000 $100.000 $85.000 $75.000 $55.000
1
RC PIPE (CL III)(18 IN)
LF 244.000 $75.000 $60.000 $75.000 $48.750 $60.000 $105.000
1A
RC PIPE (CL III)(18 IN)
LF 32.000 $75.000 $0.000 $0.000 $0.000 $0.000 $0.000
1A
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 212.000 $75.000 $0.000 $0.000 $0.000 $0.000 $0.000
Totals: $8,281,950.970 $6,756,222.022 $7,254,470.902 $7,313,493.824 $7,366,491.530 $10,480,768.500