|
|
PREPARING ROW
|
STA
|
122.500
|
$1,500.000
|
$1,869.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
580.000
|
$40.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
477.000
|
$20.000
|
$20.000
|
|
|
REMOVING UNTREATED BASE (8")
|
SY
|
368.000
|
$15.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,001.000
|
$18.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,203.000
|
$30.000
|
$50.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
36,639.000
|
$1.000
|
$0.500
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
73,278.000
|
$1.000
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
5,452.200
|
$60.000
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
36,639.000
|
$2.000
|
$10.500
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
14,208.000
|
$27.000
|
$20.000
|
|
|
ASPH (RC-250)
|
GAL
|
3,847.000
|
$10.000
|
$8.000
|
|
|
CL C CONC (MISC)
|
CY
|
4.400
|
$1,000.000
|
$2,000.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
527.000
|
$180.000
|
$185.000
|
|
|
RAIL (HANDRAIL)(RR BRIDGE)
|
LF
|
180.000
|
$225.000
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
103.000
|
$90.000
|
$85.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
8.000
|
$1,700.000
|
$1,850.000
|
|
|
GRATE & FRAME
|
EA
|
5.000
|
$2,500.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
12.000
|
$30.000
|
$50.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
6.000
|
$200.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$209,000.000
|
$285,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
150.000
|
$50.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$10.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,747.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,747.000
|
$2.000
|
$2.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
27.000
|
$80.000
|
$65.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
652.000
|
$55.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
27.000
|
$810.000
|
$1,150.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$550.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$125.000
|
$500.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
160.000
|
$10.000
|
$20.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
450.000
|
$1.000
|
$6.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
450.000
|
$1.000
|
$6.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
160.000
|
$2.000
|
$20.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
22.000
|
$55.000
|
$250.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
8.000
|
$90.000
|
$250.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
8.000
|
$60.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
22.000
|
$225.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
8.000
|
$250.000
|
$500.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
40.000
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
400.000
|
$1.000
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
160.000
|
$2.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
22.000
|
$40.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$40.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
8.000
|
$40.000
|
$250.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
1,720.000
|
$20.000
|
$50.000
|
|
|
LANDSCAPE AMENITY
|
EA
|
1.000
|
$1,000.000
|
$10,000.000
|
|
|
LANDSCAPE AMENITY (TRASH/RECYCLE BIN)
|
EA
|
2.000
|
$750.000
|
$5,000.000
|
|
|
LANDSCAPE AMENITY (BENCH)
|
EA
|
9.000
|
$3,000.000
|
$2,500.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
|
TON
|
1,424.000
|
$120.000
|
$300.000
|
|
|
FIXED BOLLARDS
|
EA
|
34.000
|
$500.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$250.000
|
|
|
REMOVE/REPLACE TIMBERS
|
LF
|
250.000
|
$50.000
|
$100.000
|
|
Totals: |
$2,290,805.000
|
$2,895,197.500
|