Bid Cobra

RED RIVER VA (0901-27-055)

Items: 55

County: RED RIVER
Length: N/A
Highway: VA
District: PARIS
Control Number: 0901-27-055
DBE Goal: 0.0%
Project: STP 2024(107)TAPS
Guaranty: N/A
Time: 148 WORKING DAYS
Engineer's Estimate: $2,031,317.00
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,031,317.00
$1,976,820.11
Over/Under Est: -2.68% -$54,496.89
$2,221,491.80
Over/Under Est: 9.36% $190,174.80
Amt Left: 12.38% $244,671.69
$2,401,256.00
Over/Under Est: 18.21% $369,939.00
Amt Left: 21.47% $424,435.89
Delta: -8.09% -$179,764.20
Subcontractor Percentage Amount
WITHERS CONSTRUCTION, LLC 14.43% $270,510.31
SOUTHERN CROSS CONTRACTORS, LLC 14.02% $262,824.29
TEXANA LAND & ASPHALT, INC. 10.94% $205,085.43
J. H. ODEN CONTRACTING COMPANY 5.19% $97,293.73
MOJICA CONSTRUCTION LLC 4.47% $83,796.33
AWP SAFETY 1.97% $36,930.37
LINEAR TRAFFIC MARKINGS LLC 0.86% $16,121.89
Total: 51.88% $972,562.35

Bid Items & Bid Tabulations

55 Total 0 of 55
RED RIVER  |  VA  |  PARIS  |  0901-27-055  |  03/05/2024  |  $2,031,317.00  |  STP 2024(107)TAPS  |  BICYCLE AND PEDESTRIAN IMPRVS  |  148 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SAMMY GIST ENTERPRISES, INC.
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 122.500 $1,500.000 $3,036.000 $1,000.000 $3,500.000
REMOVING CONC (PAV)
SY 580.000 $40.000 $84.000 $30.000 $30.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 477.000 $20.000 $50.000 $20.000 $20.000
REMOVING UNTREATED BASE (8")
SY 368.000 $15.000 $20.000 $20.000 $20.000
EXCAVATION (ROADWAY)
CY 6,416.000 $18.000 $20.000 $20.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,091.000 $30.000 $40.000 $50.000 $40.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 26,010.000 $1.000 $0.200 $0.050 $0.500
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 52,020.000 $1.000 $0.180 $0.050 $0.500
VEGETATIVE WATERING
MG 3,871.300 $60.000 $0.010 $1.000 $20.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 18,735.000 $2.000 $0.935 $10.000 $7.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 14,208.000 $27.000 $20.500 $30.000 $18.000
ASPH (RC-250)
GAL 3,847.000 $10.000 $10.000 $11.000 $8.000
CL C CONC (MISC)
CY 4.400 $1,000.000 $2,750.000 $2,000.000 $2,000.000
RAIL (HANDRAIL)(TY E)
LF 527.000 $180.000 $153.880 $200.000 $150.000
RAIL (HANDRAIL)(RR BRIDGE)
LF 180.000 $225.000 $219.730 $500.000 $350.000
RC PIPE (CL III)(18 IN)
LF 103.000 $90.000 $93.500 $80.000 $85.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 8.000 $1,700.000 $1,100.000 $1,700.000 $1,850.000
GRATE & FRAME
EA 5.000 $2,500.000 $4,125.000 $4,000.000 $5,000.000
REMOV STR (PIPE)
LF 12.000 $30.000 $220.000 $40.000 $50.000
REMOVE STR (BOLLARD)
EA 6.000 $200.000 $400.000 $400.000 $500.000
MOBILIZATION
LS 1.000 $185,000.000 $211,608.000 $222,222.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $6,000.000 $5,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 150.000 $50.000 $49.500 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $10.000 $13.200 $10.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,740.000 $5.000 $4.235 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,740.000 $2.000 $0.550 $2.000 $2.000
CONC SIDEWALKS (4")
SY 27.000 $80.000 $605.000 $100.000 $65.000
CHAIN LINK FENCE (INSTALL) (8')
LF 652.000 $55.000 $53.560 $80.000 $100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 27.000 $810.000 $709.500 $900.000 $1,150.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $550.000 $594.000 $750.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $125.000 $125.000 $400.000 $500.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 160.000 $10.000 $15.125 $15.000 $20.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 450.000 $1.000 $1.100 $3.000 $6.000
PAVEMENT SEALER 6"
LF 450.000 $1.000 $1.100 $3.000 $6.000
PAVEMENT SEALER 24"
LF 160.000 $2.000 $1.375 $3.000 $20.000
PAVEMENT SEALER (ARROW)
EA 22.000 $55.000 $27.500 $100.000 $250.000
PAVEMENT SEALER (WORD)
EA 8.000 $90.000 $27.500 $100.000 $250.000
PAVEMENT SEALER (BIKE SYMBOL)
EA 8.000 $60.000 $27.500 $100.000 $500.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 22.000 $225.000 $264.000 $300.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $300.000 $374.000 $300.000 $250.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 8.000 $250.000 $264.000 $300.000 $500.000
ELIM EXT PAV MRK & MRKS (4")
LF 40.000 $1.000 $2.200 $2.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 400.000 $1.000 $1.100 $3.000 $3.000
PAV SURF PREP FOR MRK (24")
LF 160.000 $2.000 $2.200 $5.000 $20.000
PAV SURF PREP FOR MRK (ARROW)
EA 22.000 $40.000 $33.000 $100.000 $250.000
PAV SURF PREP FOR MRK (WORD)
EA 8.000 $40.000 $33.000 $100.000 $250.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 8.000 $40.000 $33.000 $100.000 $250.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 1,720.000 $20.000 $26.000 $40.000 $50.000
LANDSCAPE AMENITY
EA 1.000 $1,000.000 $1,941.000 $6,000.000 $10,000.000
LANDSCAPE AMENITY (TRASH/RECYCLE BIN)
EA 2.000 $750.000 $845.900 $2,500.000 $5,000.000
LANDSCAPE AMENITY (BENCH)
EA 9.000 $3,000.000 $2,035.000 $3,000.000 $2,500.000
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
TON 1,424.000 $120.000 $158.400 $200.000 $200.000
FIXED BOLLARDS
EA 34.000 $500.000 $1,375.000 $500.000 $850.000
TMA (STATIONARY)
DAY 20.000 $300.000 $10.000 $200.000 $250.000
REMOVE/REPLACE TIMBERS
LF 250.000 $50.000 $15.000 $100.000 $100.000
Totals: $2,031,317.000 $1,976,820.118 $2,221,491.800 $2,401,256.000