RED RIVER CR (0901-27-045)

Items: 32

County: RED RIVER
Length: N/A
Highway: CR
District: PARIS
Control Number: 0901-27-045
DBE Goal: N/A
Project: BR 1902(239)
Guaranty: N/A
Time: 122 WORKING DAYS
Engineer's Estimate: $716,881.43
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$716,881.43
$651,496.65
Over/Under Est: -9.12% -$65,384.78
Over/Under Est: -5.51% -$39,480.69
Amt Left: 3.98% $25,904.09
Over/Under Est: -5.42% -$38,819.63
Amt Left: 4.08% $26,565.15
Delta: -0.10% -$661.06
Over/Under Est: -3.83% -$27,454.20
Amt Left: 5.82% $37,930.58
Delta: -1.68% -$11,365.43
$794,797.97
Over/Under Est: 10.87% $77,916.54
Amt Left: 22% $143,301.32
Delta: -15.28% -$105,370.74
$1,191,228.00
Over/Under Est: 66.17% $474,346.57
Amt Left: 82.84% $539,731.35
Delta: -49.88% -$396,430.03
Over/Under Est: 66.4% $476,016.02
Amt Left: 83.1% $541,400.80
Delta: -0.14% -$1,669.45

Bid Items & Bid Tabulations

32 Total 0 of 32
RED RIVER  |  CR  |  PARIS  |  0901-27-045  |  06/04/2019  |  $716,881.43  |  BR 1902(239)  |  BRIDGE REPL  |  122 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
HIGHWAY 19 CONSTRUCTION LLC
PIERCE R & B LLC
FNH CONSTRUCTION, LLC
JB JAMES CONSTRUCTION LLC
PREPARING ROW
STA 11.500 $1,000.000 $1,800.000 $1,500.000 $1,800.000 $1,500.000 $2,250.000 $6,300.000 $10,000.000
EXCAVATION (ROADWAY)
CY 71.600 $14.000 $12.000 $12.000 $30.000 $15.000 $55.000 $50.000 $180.000
EXCAVATION (CHANNEL)
CY 1,442.300 $15.000 $10.000 $12.000 $10.000 $15.000 $34.000 $40.000 $16.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,594.400 $15.000 $12.000 $16.000 $15.000 $30.000 $35.000 $50.000 $35.000
BROADCAST SEED (TEMP) (WARM)
SY 1,908.000 $1.200 $0.550 $0.660 $1.000 $0.609 $0.600 $1.000 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 1,908.000 $1.200 $0.550 $0.720 $1.000 $0.662 $0.600 $1.000 $0.500
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 3,816.000 $1.300 $0.850 $1.000 $1.000 $0.889 $0.850 $1.000 $0.750
VEGETATIVE WATERING
MG 42.800 $22.000 $15.000 $10.000 $1.000 $10.000 $50.000 $100.000 $40.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 1,855.000 $20.000 $28.500 $13.000 $18.000 $22.000 $20.000 $40.000 $15.000
CEM STABIL BKFL
CY 108.000 $225.000 $195.000 $200.000 $150.000 $180.000 $180.000 $350.000 $170.000
DRILL SHAFT (36 IN)
LF 447.000 $250.000 $182.000 $215.000 $180.000 $180.000 $215.000 $385.000 $220.000
CL C CONC (ABUT)
CY 67.800 $1,100.000 $915.000 $935.000 $1,000.000 $851.000 $1,050.000 $1,000.000 $1,700.000
REINF CONC SLAB
SF 3,380.000 $16.000 $19.250 $23.000 $22.000 $20.000 $24.000 $16.000 $52.000
PRESTR CONC GIRDER (TX28)
LF 516.000 $230.000 $186.000 $185.000 $190.000 $210.000 $200.000 $155.000 $195.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 588.000 $125.000 $98.000 $100.000 $130.000 $110.000 $130.000 $185.000 $115.000
RAIL (TY T631LS)
LF 332.000 $72.000 $81.000 $80.000 $75.000 $72.000 $85.000 $185.000 $65.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $10,000.000 $9,250.000 $10,000.000 $8,000.000 $10,000.000 $8,000.000 $40,000.000 $84,000.000
MOBILIZATION
LS 1.000 $64,551.930 $60,000.000 $66,500.000 $64,000.000 $60,000.000 $72,000.000 $110,000.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $900.000 $1,200.000 $2,000.000 $3,250.000 $1,450.000 $1,800.000 $8,500.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 112.000 $35.000 $32.000 $45.000 $5.000 $48.000 $34.000 $30.000 $31.000
ROCK FILTER DAMS (REMOVE)
LF 112.000 $10.000 $11.000 $8.000 $1.000 $30.000 $11.000 $15.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,009.000 $2.750 $2.750 $4.000 $1.000 $2.850 $2.750 $4.000 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,009.000 $1.250 $1.000 $1.000 $1.000 $1.200 $0.700 $2.000 $0.600
MTL W-BEAM GD FEN (STEEL POST)
LF 175.000 $28.000 $22.000 $20.500 $20.000 $21.000 $23.000 $35.000 $22.000
SHORT RADIUS
LF 10.000 $30.000 $65.000 $62.500 $60.000 $39.000 $49.000 $40.000 $35.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $850.000 $1,100.000 $1,100.000 $1,000.000 $725.000 $850.000 $1,850.000 $985.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,185.000 $1,100.000 $1,100.000 $1,000.000 $855.000 $940.200 $1,850.000 $950.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,550.000 $2,650.000 $2,700.000 $2,600.000 $2,575.000 $2,760.000 $2,850.000 $2,250.000
WIRE FENCE (TY A)
LF 300.000 $13.000 $19.000 $20.000 $20.000 $15.000 $15.000 $5.000 $17.000
GATE (TY 1)
EA 1.000 $1,000.000 $1,200.000 $1,250.000 $1,500.000 $1,200.000 $750.000 $5,000.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 24.000 $30.000 $24.000 $20.000 $30.000 $18.000 $22.000 $100.000 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $50.000 $24.000 $50.000 $50.000 $45.000 $69.980 $100.000 $55.000
Totals: $716,881.430 $651,496.650 $677,400.740 $678,061.800 $689,427.242 $794,797.970 $1,191,228.000 $1,192,897.450